ODOT letting results, June 30, 2022

20 contracts let by Ohio DOT on June 30, 2022, $31,021,053 in low bids, a median of 2 bidders per contract. On the 20 with an engineer's estimate, the low bid came in under it 8 times; median low bid +3.0% against the estimate.

Owner
Ohio DOT
Contracts
20
Low bids, total
$31,021,053
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220399LOG-US 33-25.60 (FOUR LANE RESURFACING)LOG1Shelly Company$5,045,311+5.0%ODOT
220402MIA-IR 75-15.02 (FOUR LANE RESURFACING)MIA2Barrett Paving Materials Inc$4,588,973$4,903,679+7.0%+10%ODOT
220398HIG-US 50/SR 73-07.40/00.00 PV (TWO LANE RESURFACING)HIG2Shelly Company$3,754,928$4,429,322+18%-6.0%ODOT
220393CLA-IR 70-14.00 (MICROSURFACING)CLA1Strawser Construction Inc$2,969,758+9.0%ODOT
220406PAU-SR 66/SR 637-00.00/08.39/15.56 (TWO LANE RESURFACING)PAU2Shelly Company$2,198,236$2,228,314+1.0%-1.0%ODOT
220405OTT-SR 53-11.79 (TWO LANE RESURFACING)OTT3Erie Blacktop Inc$1,997,065$2,195,425+10%-23%ODOT
220397FRA-US 40-20.10 (at S-Hamilton Rd) (INTERSECTION)FRA4Shelly & Sands Inc$1,395,187$1,519,489+9.0%+8.0%ODOT
220400LOR-SR 83-15.31 (TWO LANE RESURFACING)LOR3Kokosing Construction Company Inc$1,383,049$1,478,387+7.0%+16%ODOT
220401MAR-US 23-07.78 (FOUR LANE RESURFACING)MAR2Kokosing Construction Company Inc$1,319,431$1,530,210+16%-16%ODOT
224020WAR-GEN SIGNS FY2023 (SIGNING)WAR2Security Fence Group Inc$1,051,722$1,192,395+13%+21%ODOT
220378PER-SR 93/SR 216-01.04/01.78 (PART 1 AND PART 2) (TWO LANE RESURFACING)PER2Shelly Company$816,773$845,490+4.0%+12%ODOT
220407PER-SR 13-27.71 (Somerset) (LIGHTING)PER4Miller Cable Company$770,000$794,673+3.0%+30%ODOT
220408SUM-Gilchrist Rd Ph1 (Mogadore) (FOUR LANE RESURFACING)SUM7Barbicas Construction Company Inc$699,102$753,110+8.0%+2.0%ODOT
220411D04-LG FY2023 (East) (LIGHTING)District 43Cornerstone Electric Inc$686,917$877,222+28%-31%ODOT
220414ROS-SR 772-10.60 (SLIDE REPAIR)ROS9W E Smith Construction$662,166$697,290+5.0%-7.0%ODOT
220413LUC-/OTT-SR 65/SR 163 FY2023 Oper (MISCELLANEOUS)LUC1Dependable Tree and Maintenance Services LLC$493,290+11%ODOT
220403SHE-/MIA-IR 75/SR 29-09.85/20.66 (CULVERT REPLACEMENT)SHE2Brumbaugh Construction Inc$465,995$509,907+9.0%-4.0%ODOT
220412FRA-IR 670-03.12 Bridge Retrofit (BRIDGE REPAIR)FRA3Ruhlin Company$290,043$341,530+18%-4.0%ODOT
220410D01-RPM FY23 (RAISED PAVEMENT MARKERS)District 11A & A Safety Inc$289,309+4.0%ODOT
228004MIA-Piqua SRTS-Infras-FY22 (LIGHTING)MIA1Perram Electric Inc$143,8000.0%ODOT
ODOT contracts let on June 30, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy