ODOT contract 250115 bid tabulation
BEL-SR 647-03.29 (SLIDE REPAIR). Let by Ohio DOT on February 27, 2025, BEL. 5 bids received; low bid $619,317 by Alan Stone Co Inc, -6.9% against the engineer's estimate of $665,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 46
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $619,317 | Low | -7.0% |
| 2 | Ohio-West Virginia Excavating Co | $638,104 | +3.0% | -4.0% |
| 3 | Craig Edward Susany Inc | $657,954 | +6.0% | -1.0% |
| 4 | Dennison Bridge Inc | $693,737 | +12% | +4.0% |
| 5 | Shelly & Sands Inc | $726,556 | +17% | +9.0% |
Engineer's estimate: $665,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Ohio-West Virginia Excavating Co | 3. Craig Edward Susany Inc | 4. Dennison Bridge Inc | 5. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,200.00 | $2,500.00 | $1,000.00 | $2,000.00 | $2,200.00 |
| 2 | Pavement removed (202E23000) | SY | 206 | $15.00 | $50.00 | $25.00 | $25.00 | $42.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 70 | $30.00 | $21.00 | $10.00 | $30.00 | $15.00 |
| 4 | Guardrail removed (202E38000) | FT | 387.50 | $5.00 | $5.00 | $2.00 | $2.00 | $2.00 |
| 5 | Catch basin removed (202E58100) | EACH | 1 | $500.00 | $1,500.00 | $500.00 | $1,000.00 | $175.00 |
| 6 | Removal misc.:retaining wall (202E98000) | LS | 1 | $4,600.00 | $1,500.00 | $1,000.00 | $2,500.00 | $11,000 |
| 7 | Subgrade compaction (204E10000) | SY | 230 | $4.00 | $6.00 | $2.00 | $3.00 | $8.00 |
| 8 | Guardrail, type MGS (606E15050) | FT | 100 | $25.00 | $23.00 | $22.00 | $23.00 | $24.50 |
| 9 | Guardrail, type MGS half post spacing, as per plan (606E15151) | FT | 287.50 | $30.00 | $32.00 | $30.00 | $31.00 | $29.50 |
| 10 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $200.00 | $400.00 | $100.00 | $200.00 | $210.00 |
| 11 | Rock channel protection, type C without filter (601E34200) | CY | 2 | $300.00 | $900.00 | $250.00 | $400.00 | $300.00 |
| 12 | Seeding and mulching, as per plan (659E10001) | SY | 361 | $4.00 | $7.00 | $7.00 | $10.00 | $8.00 |
| 13 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | 4" base pipe underdrains with geotextile fabric (605E06020) | FT | 305 | $7.00 | $15.00 | $16.00 | $25.00 | $20.00 |
| 15 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 12 | $40.00 | $32.00 | $16.00 | $30.00 | $45.00 |
| 16 | 18" conduit, type B (611E07400) | FT | 50 | $220.00 | $200.00 | $450.00 | $300.00 | $325.00 |
| 17 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $5,000.00 | $2,700.00 | $3,500.00 | $4,500.00 | $4,500.00 |
| 18 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 1 | $350.00 | $800.00 | $200.00 | $400.00 | $350.00 |
| 19 | Pavement planing, asphalt concrete (1 1/4" depth) (254E01000) | SY | 325 | $30.00 | $12.00 | $21.00 | $22.00 | $20.00 |
| 20 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 26 | $320.00 | $355.00 | $500.00 | $500.00 | $600.00 |
| 21 | Aggregate base (304E20000) | CY | 50 | $130.00 | $150.00 | $150.00 | $145.00 | $165.00 |
| 22 | Tack coat (407E10000) | GAL | 49 | $5.00 | $9.00 | $8.00 | $4.00 | $4.00 |
| 23 | Prime coat, as per plan (408E10001) | GAL | 29 | $5.00 | $9.00 | $20.00 | $50.00 | $55.00 |
| 24 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 17 | $350.00 | $420.00 | $500.00 | $700.00 | $600.00 |
| 25 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 8 | $440.00 | $550.00 | $500.00 | $600.00 | $600.00 |
| 26 | RPM (621E00100) | EACH | 9 | $350.00 | $350.00 | $325.00 | $500.00 | $325.00 |
| 27 | Raised pavement marker removed (621E54000) | EACH | 9 | $20.00 | $40.00 | $10.00 | $20.00 | $25.00 |
| 28 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 9 | $10.00 | $12.00 | $11.00 | $12.00 | $10.00 |
| 29 | Edge line, 6" (646E10010) | MI | 0.12 | $10,500 | $17,000 | $26,750 | $27,500 | $24,000 |
| 30 | Center line (646E10200) | MI | 0.06 | $5,000.00 | $28,000 | $48,500 | $50,000 | $44,500 |
| 31 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $3,300.00 | $3,500.00 | $2,600.00 | $2,500.00 | $3,100.00 |
| 32 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $250.00 | $400.00 | $600.00 | $225.00 | $500.00 |
| 33 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.06 | $10,000 | $10,000 | $64,600 | $10,000 | $9,750.00 |
| 34 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.12 | $5,000.00 | $5,000.00 | $32,325 | $5,500.00 | $5,000.00 |
| 35 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 146 | $150.00 | $150.00 | $180.00 | $210.00 | $90.00 |
| 36 | Portable barrier, unanchored (622E41100) | FT | 600 | $22.00 | $22.00 | $16.00 | $12.00 | $30.00 |
| 37 | Steel piles, misc.:steel piles W16X40, furnished (507E00400) | FT | 1,225 | $30.00 | $33.00 | $29.00 | $39.00 | $30.00 |
| 38 | Steel piles, misc.:steel piles W16X57, furnished (507E00400) | FT | 2,920 | $41.00 | $45.00 | $46.00 | $50.00 | $41.00 |
| 39 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 2,619 | $45.00 | $35.00 | $56.00 | $65.00 | $58.00 |
| 40 | Drilled shafts, 24" diameter, into bedrock, as per plan (524E94505) | FT | 1,080 | $90.00 | $95.00 | $75.00 | $75.00 | $102.00 |
| 41 | Drilled shafts, misc.: plug pile, 30" diameter, UN (524E95000) | FT | 420 | $60.00 | $84.00 | $76.00 | $85.00 | $86.00 |
| 42 | Special - retaining wall, cast-in-place concrete L (530E50010) | SF | 27 | $200.00 | $150.00 | $250.00 | $100.00 | $125.00 |
| 43 | Special - drilling through obstructions (690E98600) | HR | 10 | $700.00 | $550.00 | $300.00 | $400.00 | $800.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,000.00 | $8,500.00 | $18,000 | $8,000.00 | $5,100.00 |
| 45 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $45,000 | $58,000 | $20,000 | $20,000 | $51,701 |
| 46 | Mobilization (624E10000) | LS | 1 | $23,500 | $16,500 | $20,000 | $16,000 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.