Independence Excavating Inc: ODOT bid record
Independence Excavating Inc submitted 13 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 11 MAY 2023, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,074,019
- Latest bid
- 11 MAY 2023
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 1 | 13% |
| 2021 | 1 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 5 | 0 | 0% |
| MED | 2 | 0 | 0% |
| TRU | 2 | 1 | 50% |
| SUM | 1 | 0 | 0% |
| District 12 | 1 | 0 | 0% |
| LOR | 1 | 0 | 0% |
| ATB | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 14 | 14 (100%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 11 | 8 (73%) | $300.00 | $850.00 |
| Ground rod | 625E32000 | EACH | 11 | 8 (73%) | $235.00 | $285.00 |
| 1" preformed expansion joint filler | 516E13600 | SF | 11 | 5 (45%) | $7.00 | $10.00 |
| Water | 659E35000 | MGAL | 9 | 5 (56%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 9 | 5 (56%) | $20.00 | $34.00 |
| Guardrail removed | 202E38000 | FT | 9 | 5 (56%) | $2.00 | $2.50 |
| Soil analysis test | 659E00100 | EACH | 8 | 5 (63%) | $37.50 | $115.50 |
| 2" preformed expansion joint filler | 516E13900 | SF | 8 | 5 (63%) | $5.25 | $12.00 |
| Elastomeric bearing with internal laminates and load plate | 516E44100 | EACH | 6 | 5 (83%) | $1,050.00 | $1,500.00 |
| Embankment | 203E20000 | CY | 14 | 4 (29%) | $15.50 | $25.00 |
| Lime | 659E31000 | ACRE | 11 | 4 (36%) | $70.00 | $150.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Great Lakes Construction Co | 9 | 8 of 9 |
| Shelly & Sands Inc | 8 | 7 of 8 |
| Ruhlin Company | 7 | 5 of 7 |
| Lockhart Concrete Co | 6 | 4 of 6 |
| Eclipse Co LLC | 5 | 1 of 5 |
| Marucci & Gaffney Excavating Co | 4 | 2 of 4 |
| Kokosing Construction Company Inc | 4 | 4 of 4 |
| Rudzik Excavating Inc | 4 | 2 of 4 |
| J D Williamson Construction Co Inc | 4 | 4 of 4 |
| Tucson Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 MAY 2023 | 238003 | ATB | ATB-SR 531-13.50/15.85 (SLIDE REPAIR) | 5 of 7 | $5,692,921 | +15% |
| 13 OCT 2022 | 220512 | CUY | CUY-IR 77-00.42 Interchange (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | 7 of 7 | $35,886,354 | +13% |
| 13 OCT 2022 | 220526 | MED | MED-SR 252-03.95 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 5 | $2,993,824 | +41% |
| 14 APR 2022 | 220233 | CUY | CUY-IR 77-08.37 NB Ramps Safety (INTERCHANGE) | 3 of 3 | $4,489,298 | +8.0% |
| 14 JAN 2021 | 200569 | LOR | LOR-IR 90-17.85 (BRIDGE REPLACEMENT (2 BRIDGES)) | 8 of 9 | $10,444,782 | +14% |
| 17 DEC 2020 | 200563 | CUY | CUY-IR 480-07.27 Deck (BRIDGE REPAIR) | 9 of 9 | $5,398,412 | +58% |
| 05 NOV 2020 | 200467 | CUY | CUY-IR 90-07.58/VAR Slope (MISCELLANEOUS) | 2 of 3 | $3,405,108 | +6.0% |
| 13 AUG 2020 | 200434 | District 12 | D12-MNT FY2020 Drainage (CULVERT REPLACEMENT) | 4 of 8 | $442,086 | +21% |
| 30 JUL 2020 | 200415 | CUY | CUY-IR 480-20.12 EB Slide (SLIDE REPAIR) | 4 of 12 | $286,652 | +46% |
| 23 APR 2020 | 200244 | TRU | TRU-Myron St Bridge (BRIDGE REPAIR) | 4 of 4 | $764,134 | +64% |
| 09 APR 2020 | 200212 | TRU | TRU-SR 88-12.60 (MISCELLANEOUS) | 1 of 8 | $1,074,019 | Low, 2.0% under the second |
| 27 FEB 2020 | 200025 | MED | MED-SR 303-13.90/14.96 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 10 | $1,719,049 | +24% |
| 23 JAN 2020 | 200030 | SUM | SUM-IR 271-08.80 Slide (SLIDE REPAIR) | 16 of 16 | $1,145,545 | +74% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.