ODOT letting results, April 14, 2022

29 contracts let by Ohio DOT on April 14, 2022, $68,313,840 in low bids, a median of 3 bidders per contract. On the 29 with an engineer's estimate, the low bid came in under it 11 times; median low bid +4.0% against the estimate.

Owner
Ohio DOT
Contracts
29
Low bids, total
$68,313,840
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220230ATH-US 33-14.40 (MAJOR RECONSTRUCTION)ATH2Alan Stone Co Inc$9,520,787$9,982,558+5.0%+26%ODOT
220236FRA-IR 670-00.87 (FOUR LANE RESURFACING)FRA2Shelly & Sands Inc$8,209,493$8,466,673+3.0%+29%ODOT
220248MUS-CR 66A-00.00 (BRIDGE REPAIR)MUS3Shelly & Sands Inc$6,855,410$7,042,574+3.0%0.0%ODOT
220216SAN-US 6/US 20I-14.87/0.00 Grp B (PART 1 AND PART 2) (INTERCHANGE)SAN3Kokosing Construction Company Inc$5,041,806$5,365,380+6.0%-18%ODOT
220228ALL-US 30-13.30 (PART 1 AND PART 2) (FOUR LANE RESURFACING)ALL2Gerken Paving Inc$4,551,229$4,659,314+2.0%+7.0%ODOT
220233CUY-IR 77-08.37 NB Ramps Safety (INTERCHANGE)CUY3Great Lakes Construction Co$4,145,844$4,302,945+4.0%+13%ODOT
220210LOR-SR 83-02.48 (INTERSECTION)LOR3Digioia-Suburban Excavating LLC$4,131,116$4,278,365+4.0%+30%ODOT
220254D10-Pavement Marking FY2022 (PAVEMENT MARKING)District 103The Aero-Mark Company LLC$3,076,014$3,219,550+5.0%+27%ODOT
220237GRE-SR 72-14.48 (TWO LANE RESURFACING)GRE3Barrett Paving Materials Inc$2,923,065$3,374,811+15%-7.0%ODOT
220247MOT-US 35-14.04 (SPOT PATCHING / PAVEMENT REPAIR)MOT2Shelly & Sands Inc$2,324,422$2,809,075+21%+49%ODOT
220258ATH-SR 329-05.26 (SLIDE REPAIR)ATH7Alan Stone Co Inc$1,898,016$2,310,837+22%-23%ODOT
220231CAR-SR 542-00.00 (TWO LANE RESURFACING)CAR1Superior Paving & Materials Inc$1,782,440+2.0%ODOT
220251SEN-US 224-03.64 Roundabout Grp B (INTERSECTION)SEN4Miller Bros Const Inc$1,498,701$1,781,163+19%-14%ODOT
220255D11-SP FY2022 (SPOT PATCHING / PAVEMENT REPAIR)District 113Shelly & Sands Inc$1,399,399$1,969,450+41%+12%ODOT
220243LIC-US 62-03.64 (MINOR WIDENING)LIC2Shelly & Sands Inc$1,367,886$1,397,317+2.0%+5.0%ODOT
220244LOR-US 6-12.36 (TWO LANE RESURFACING)LOR5Karvo Companies Inc$1,218,000$1,329,045+9.0%-5.0%ODOT
220240JEF-SR 43-00.00 (FOUR LANE RESURFACING)JEF2Shelly & Sands Inc$1,091,091$1,398,850+28%+4.0%ODOT
220241LAW-US 52-22.09 Geotech (SLIDE REPAIR)LAW5Allard Excavation LLC$1,018,335$1,159,911+14%-13%ODOT
220235DEL-SR 750-02.17 (TWO LANE RESURFACING)DEL1Shelly & Sands Inc$926,812+21%ODOT
220234CUY-LG FY2022 (LIGHTING)CUY4Ruhlin Company$846,835$869,500+3.0%-4.0%ODOT
220249PIK-CR 50-03.32 OH16-01 (SLIDE REPAIR)PIK6Allied Construction, LLC$802,334$885,359+10%-24%ODOT
220229ATH-Elm Street (MINOR RECONSTRUCTION)ATH5Axis Civil Construction LLC$707,068$710,2440.0%+4.0%ODOT
220242LIC-SR 37-25.05 (BRIDGE REPAIR)LIC5Shelly & Sands Inc$668,157$911,182+36%-11%ODOT
220232COL-Salem Sidewalks Phase 1 (SIDEWALK)COL2Parella-Pannunzio Inc$587,466$915,960+56%+17%ODOT
220250POR-CR 256-00.00 E Mennonite Rd (TWO LANE RESURFACING)POR6Ronyak Paving Inc$511,765$517,586+1.0%-5.0%ODOT
220252STA-US 62-05.10 SRTS (BIKEWAYS)STA3Digioia-Suburban Excavating LLC$326,361$394,106+21%+5.0%ODOT
224014FRA-SR 3-20.40 (Oakland/Agler) (INTERSECTION)FRA2Cap-Stone & Associates Inc$312,998$422,665+35%+8.0%ODOT
220253WAS-SR 7-28.97 (CULVERT REPLACEMENT)WAS4Parker Corporation$309,247$349,233+13%-16%ODOT
220238JAC-SR 327-12.95 Culvert (CULVERT REPLACEMENT)JAC4Alan Stone Co Inc$261,743$274,755+5.0%+3.0%ODOT
ODOT contracts let on April 14, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy