ODOT contract 260501 bid tabulation
GEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on November 12, 2026, GEA. 4 bids received; low bid $2,236,334 by J D Williamson Construction Co Inc, -14% against the engineer's estimate of $2,600,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 102
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | J D Williamson Construction Co Inc | $2,236,334 | Low | -14% |
| 2 | Perk Company Inc | $2,596,271 | +16% | 0.0% |
| 3 | Fechko Excavating LLC | $2,600,049 | +16% | 0.0% |
| 4 | Union Industrial Contractors Inc | $2,994,062 | +34% | +15% |
Engineer's estimate: $2,600,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J D Williamson Construction Co Inc | 2. Perk Company Inc | 3. Fechko Excavating LLC | 4. Union Industrial Contractors Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $20,000 | $18,561 | $11,790 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 1,179 | $22.00 | $42.38 | $20.00 | $40.00 |
| 3 | Guardrail removed (202E38000) | FT | 512.50 | $2.00 | $10.95 | $2.00 | $3.00 |
| 4 | Anchor assembly removed, type E (202E42010) | EACH | 3 | $180.00 | $796.35 | $510.00 | $500.00 |
| 5 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $115.00 | $796.35 | $510.00 | $500.00 |
| 6 | Excavation (203E10000) | CY | 1,692 | $35.00 | $38.11 | $36.00 | $65.00 |
| 7 | Embankment (203E20000) | CY | 520 | $22.00 | $11.73 | $77.00 | $75.00 |
| 8 | Subgrade compaction (204E10000) | SY | 1,497 | $5.00 | $1.48 | $7.00 | $5.00 |
| 9 | Reshaping under guardrail, as per plan (209E15001) | STA | 5.18 | $465.00 | $481.70 | $1,960.00 | $450.00 |
| 10 | Linear grading, as per plan (209E60201) | STA | 2.17 | $250.00 | $826.42 | $1,082.00 | $500.00 |
| 11 | Guardrail, type MGS (606E15050) | FT | 212.50 | $35.00 | $38.50 | $39.28 | $35.00 |
| 12 | Anchor assembly, MGS type E (606E26150) | EACH | 4 | $3,040.00 | $2,975.00 | $3,035.27 | $3,000.00 |
| 13 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $3,300.00 | $1,750.00 | $1,785.45 | $3,300.00 |
| 14 | Delineator, misc.: type C (620E70000) | EACH | 2 | $15.00 | $90.00 | $71.00 | $70.00 |
| 15 | Delineator, misc.: type D (620E70000) | EACH | 2 | $15.00 | $90.00 | $71.00 | $70.00 |
| 16 | Right-of-way monument, type B (623E40520) | EACH | 1 | $300.00 | $738.05 | $875.00 | $1,500.00 |
| 17 | Special - asbestos abatement: work involving asbes (690E71000) | LS | 1 | $1.00 | $500.00 | $1,895.00 | $10,000 |
| 18 | Soil analysis test (659E00100) | EACH | 1 | $150.00 | $500.00 | $82.00 | $200.00 |
| 19 | Topsoil (659E00300) | CY | 388 | $75.00 | $102.61 | $99.00 | $85.00 |
| 20 | Seeding and mulching, class 1 (659E00500) | SY | 3,498 | $2.50 | $2.72 | $3.00 | $3.00 |
| 21 | Repair seeding and mulching (659E14000) | SY | 175 | $1.00 | $1.24 | $3.00 | $2.00 |
| 22 | Inter-seeding (659E15000) | SY | 175 | $1.00 | $1.24 | $3.00 | $1.00 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.50 | $450.00 | $1,865.24 | $1,000.00 | $1,000.00 |
| 24 | Lime (659E31000) | ACRE | 0.74 | $30.00 | $1,890.46 | $250.00 | $50.00 |
| 25 | Water (659E35000) | MGAL | 19 | $2.00 | $124.35 | $20.00 | $25.00 |
| 26 | Mowing (659E40000) | MSF | 8 | $5.00 | $100.00 | $145.00 | $50.00 |
| 27 | Erosion control (832E30000) | EACH | 39,720 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | Rock channel protection, type B with filter (601E32100) | CY | 370 | $165.00 | $164.92 | $215.00 | $375.00 |
| 29 | Aggregate drains (605E31100) | FT | 92 | $19.00 | $21.25 | $37.00 | $90.00 |
| 30 | 6" conduit, type B (611E00900) | FT | 150 | $25.00 | $12.59 | $36.00 | $100.00 |
| 31 | 6" conduit, type C (611E01100) | FT | 50 | $25.00 | $12.58 | $36.00 | $100.00 |
| 32 | 6" conduit, type E (611E01400) | FT | 50 | $10.00 | $12.58 | $36.00 | $100.00 |
| 33 | 6" conduit, type F (611E01500) | FT | 50 | $20.00 | $12.58 | $36.00 | $100.00 |
| 34 | 8" conduit, type B (611E01800) | FT | 50 | $60.00 | $13.20 | $50.00 | $110.00 |
| 35 | 8" conduit, type C (611E02000) | FT | 50 | $50.00 | $13.20 | $50.00 | $110.00 |
| 36 | Pavement planing, asphalt concrete, as per plan (1 (254E01001) | SY | 267 | $20.00 | $18.00 | $35.00 | $35.00 |
| 37 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 285 | $265.00 | $260.00 | $374.50 | $370.00 |
| 38 | Aggregate base (304E20000) | CY | 307 | $110.00 | $82.26 | $118.00 | $150.00 |
| 39 | Non-tracking tack coat (407E20000) | GAL | 269 | $5.00 | $5.00 | $4.00 | $5.00 |
| 40 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 103 | $420.00 | $415.00 | $612.15 | $605.00 |
| 41 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 15 | $605.00 | $595.00 | $632.56 | $625.00 |
| 42 | Curb, type 4-A (609E24000) | FT | 73 | $15.00 | $38.38 | $38.00 | $75.00 |
| 43 | Compacted aggregate, as per plan (617E10101) | CY | 2 | $460.00 | $1,188.45 | $765.00 | $175.00 |
| 44 | Longitudinal joint adhesive (875E10000) | LB | 78 | $8.00 | $8.00 | $10.20 | $10.00 |
| 45 | Barrier reflector, type 1 (one-way) (626E00102) | EACH | 16 | $13.00 | $13.00 | $13.26 | $15.00 |
| 46 | Ground mounted support, no. 2 post (630E02100) | FT | 37.50 | $15.00 | $15.00 | $15.30 | $15.00 |
| 47 | Sign, flat sheet (630E80100) | SF | 1 | $55.00 | $55.00 | $56.11 | $55.00 |
| 48 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $40.00 | $40.00 | $40.81 | $40.00 |
| 49 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $125.00 | $125.00 | $127.53 | $125.00 |
| 50 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $50.00 | $50.00 | $51.01 | $50.00 |
| 51 | Edge line, 6" (646E10010) | MI | 0.33 | $6,620.00 | $6,500.00 | $6,631.67 | $6,500.00 |
| 52 | Center line (646E10200) | MI | 0.17 | $9,700.00 | $9,500.00 | $9,692.41 | $9,500.00 |
| 53 | Removal of pavement marking (646E50300) | MI | 0.50 | $5,615.00 | $5,500.00 | $5,611.42 | $5,500.00 |
| 54 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $100.00 | $125.00 | $85.00 | $80.00 |
| 55 | Special - work zone traffic signal (614E11300) | EACH | 4 | $12,000 | $12,500 | $12,753 | $12,500 |
| 56 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 6 | $2,550.00 | $2,400.00 | $2,020.00 | $2,550.00 |
| 57 | Replacement sign (614E12500) | EACH | 5 | $200.00 | $200.00 | $204.05 | $5.00 |
| 58 | Barrier reflector, type 1, (bidirectional) (614E13310) | EACH | 45 | $13.00 | $12.00 | $12.24 | $12.00 |
| 59 | Object marker, two way (614E13360) | EACH | 45 | $20.00 | $22.00 | $22.45 | $22.00 |
| 60 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $1,220.00 | $1,276.70 | $1,224.31 | $1,200.00 |
| 61 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.36 | $18,850 | $18,500 | $18,875 | $18,500 |
| 62 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.94 | $8,510.00 | $8,350.00 | $8,519.15 | $8,350.00 |
| 63 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 48 | $12.00 | $12.00 | $12.24 | $12.00 |
| 64 | Pavement for maintaining traffic, class A (615E20000) | SY | 159 | $155.00 | $153.30 | $80.20 | $300.00 |
| 65 | Portable barrier, unanchored (622E41100) | FT | 1,720 | $34.00 | $17.52 | $26.00 | $35.00 |
| 66 | Portable barrier, anchored (622E41110) | FT | 370 | $40.00 | $43.65 | $26.00 | $45.00 |
| 67 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 50 | $30.00 | $30.00 | $30.61 | $30.00 |
| 68 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $175,000 | $146,115 | $148,500 | $275,000 |
| 69 | Wearing course removed (202E23500) | SY | 451 | $1.00 | $1.00 | $5.50 | $15.00 |
| 70 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $40,000 | $59,016 | $85,000 | $50,000 |
| 71 | Unclassified excavation (503E21100) | CY | 136 | $300.00 | $60.21 | $375.00 | $250.00 |
| 72 | Pile driving equipment mobilization (505E11100) | LS | 1 | $30,000 | $205,000 | $87,000 | $50,000 |
| 73 | Steel piles HP10X42, furnished (507E00100) | FT | 1,925 | $50.00 | $63.42 | $53.11 | $60.00 |
| 74 | Steel piles HP10X42, driven (507E00150) | FT | 1,815 | $27.00 | $2.00 | $4.85 | $70.00 |
| 75 | Epoxy coated steel reinforcement (509E10000) | LB | 51,324 | $1.70 | $1.96 | $2.51 | $1.75 |
| 76 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 2,284 | $2.30 | $2.72 | $2.68 | $2.50 |
| 77 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 155 | $1,110.00 | $1,462.62 | $1,367.70 | $1,200.00 |
| 78 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 24 | $1,445.00 | $1,804.35 | $1,123.47 | $1,600.00 |
| 79 | Class QC1 concrete, abutment including footing (511E43510) | CY | 127 | $720.00 | $786.29 | $1,094.41 | $1,100.00 |
| 80 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 401 | $31.00 | $34.87 | $76.00 | $80.00 |
| 81 | Type 2 waterproofing (512E33000) | SY | 8 | $80.00 | $99.30 | $59.00 | $150.00 |
| 82 | Draped strand prestressed concrete bridge I-beam members, level 3, type WF36-49 (515E15070) | EACH | 6 | $50,000 | $56,666 | $56,000 | $65,000 |
| 83 | Intermediate diaphragms (515E20000) | EACH | 15 | $2,050.00 | $1,719.65 | $3,500.00 | $1,750.00 |
| 84 | 1/2" preformed expansion joint filler (516E13200) | SF | 88 | $6.00 | $11.50 | $3.00 | $25.00 |
| 85 | 1" preformed expansion joint filler (516E13600) | SF | 88 | $8.00 | $12.13 | $4.00 | $25.00 |
| 86 | 2" preformed expansion joint filler (516E13900) | SF | 54 | $10.00 | $20.68 | $5.00 | $35.00 |
| 87 | Nylon reinforced neoprene sheeting (516E25000) | SF | 416 | $17.00 | $53.33 | $41.00 | $25.00 |
| 88 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44001) | EACH | 12 | $2,400.00 | $3,724.04 | $3,083.00 | $3,000.00 |
| 89 | Porous backfill with geotextile fabric (518E21200) | CY | 103 | $150.00 | $116.07 | $148.00 | $150.00 |
| 90 | 6" perforated corrugated plastic pipe (518E40000) | FT | 140 | $22.00 | $22.61 | $16.00 | $30.00 |
| 91 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 64 | $24.00 | $22.61 | $18.00 | $30.00 |
| 92 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 178 | $400.00 | $463.17 | $581.00 | $400.00 |
| 93 | Type A installation (526E90010) | FT | 80 | $240.00 | $322.85 | $298.00 | $300.00 |
| 94 | Polymer modified asphalt expansion joint system (846E00110) | CF | 34 | $950.00 | $600.00 | $560.00 | $800.00 |
| 95 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $22,000 | $25,000 | $21,400 | $25,000 |
| 96 | Maintaining traffic (614E11000) | LS | 1 | $14,000 | $78,909 | $30,100 | $40,000 |
| 97 | Field office, type B, as per plan (619E16011) | MNTH | 4 | $2,275.00 | $7,244.00 | $1,370.00 | $2,500.00 |
| 98 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,000 | $26,000 | $24,200 | $25,000 |
| 99 | Mobilization (624E10000) | LS | 1 | $110,000 | $113,000 | $76,900 | $100,000 |
| 100 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $11,500 | $6,120.00 | $6,040.00 | $8,000.00 |
| 101 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,700 | $12,480 | $10,320 | $13,000 |
| 103 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,700.00 | $3,700.00 | $3,802.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.