ODOT contract 250016 bid tabulation
HUR-SR 18-17.10 (INTERSECTION). Let by Ohio DOT on January 16, 2025, HUR. 7 bids received; low bid $1,519,776 by D L Smith Concrete LLC, -15% against the engineer's estimate of $1,790,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 139
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | D L Smith Concrete LLC | $1,519,776 | Low | -15% |
| 2 | Smith Paving & Excavating Inc | $1,562,056 | +3.0% | -13% |
| 3 | Fechko Excavating LLC | $1,689,764 | +11% | -6.0% |
| 4 | Shelly & Sands Inc | $1,768,185 | +16% | -1.0% |
| 5 | Eclipse Co LLC | $1,851,134 | +22% | +3.0% |
| 6 | Kokosing Construction Company Inc | $2,020,276 | +33% | +13% |
| 7 | Great Lakes Demolition Company | $2,112,824 | +39% | +18% |
Engineer's estimate: $1,790,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D L Smith Concrete LLC | 2. Smith Paving & Excavating Inc | 3. Fechko Excavating LLC | 4. Shelly & Sands Inc | 5. Eclipse Co LLC | 6. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,500.00 | $21,000 | $11,000 | $40,000 | $10,000 | $15,000 |
| 2 | Pavement removed (202E23000) | SY | 5,114 | $6.35 | $8.75 | $8.25 | $12.00 | $9.00 | $11.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 163 | $22.00 | $14.00 | $35.00 | $21.50 | $27.00 | $35.00 |
| 4 | Guardrail removed (202E38000) | FT | 78 | $2.50 | $2.50 | $3.50 | $3.00 | $3.00 | $10.00 |
| 5 | Guard post removed (202E38800) | EACH | 12 | $25.00 | $25.00 | $150.00 | $46.00 | $26.00 | $75.00 |
| 6 | Mailbox removed (202E53100) | EACH | 1 | $30.00 | $50.00 | $150.00 | $279.00 | $183.00 | $200.00 |
| 7 | Fence removed (202E75000) | FT | 584 | $3.50 | $3.50 | $4.00 | $4.00 | $4.00 | $10.00 |
| 8 | Removal misc.: decorative well & functioning spigo (202E98100) | EACH | 1 | $4,500.00 | $3,300.00 | $900.00 | $588.00 | $183.00 | $1,000.00 |
| 9 | Excavation (203E10000) | CY | 2,574 | $20.00 | $23.00 | $27.50 | $20.00 | $41.00 | $33.50 |
| 10 | Embankment (203E20000) | CY | 1,324 | $27.00 | $19.50 | $12.25 | $22.00 | $22.00 | $10.00 |
| 11 | Subgrade compaction (204E10000) | SY | 667 | $2.00 | $2.00 | $5.00 | $2.00 | $1.00 | $6.50 |
| 12 | Proof rolling (204E45000) | HR | 4 | $150.00 | $100.00 | $300.00 | $378.00 | $332.00 | $240.00 |
| 13 | Cement (206E10500) | TON | 192 | $190.00 | $203.00 | $190.00 | $214.00 | $235.00 | $203.00 |
| 14 | Curing coat (206E11000) | SY | 7,415 | $1.20 | $1.20 | $1.20 | $1.00 | $1.50 | $1.20 |
| 15 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 7,415 | $4.10 | $4.60 | $4.70 | $5.00 | $5.00 | $5.00 |
| 16 | Pavement planing, asphalt concrete, (1.50") (254E01000) | SY | 1,649 | $7.00 | $6.50 | $7.50 | $4.00 | $3.50 | $5.00 |
| 17 | Guardrail, type 5 (606E13000) | FT | 75 | $24.00 | $24.00 | $24.00 | $26.00 | $24.00 | $21.00 |
| 18 | Guardrail, type MGS (606E15050) | FT | 262.50 | $24.80 | $24.80 | $25.00 | $27.00 | $25.00 | $21.00 |
| 19 | Rounded end section (606E20050) | EACH | 1 | $65.00 | $65.00 | $65.00 | $70.00 | $68.00 | $50.00 |
| 20 | Anchor assembly, MGS type E [MASH 2016] (606E26150) | EACH | 1 | $2,580.00 | $2,580.00 | $2,580.00 | $2,761.00 | $2,580.00 | $2,450.00 |
| 21 | Anchor assembly, type T (606E26500) | EACH | 1 | $985.00 | $985.00 | $985.00 | $1,054.00 | $985.00 | $1,375.00 |
| 22 | Bridge terminal assembly, type 4 (606E35140) | EACH | 2 | $960.00 | $960.00 | $960.00 | $1,028.00 | $960.00 | $1,100.00 |
| 23 | Fence, type CLT, as per plan (607E23001) | FT | 488 | $30.50 | $30.50 | $30.50 | $33.00 | $31.00 | $48.00 |
| 24 | Gate, type CLT, as per plan (607E61201) | EACH | 1 | $12,850 | $12,850 | $12,850 | $13,753 | $12,850 | $21,500 |
| 25 | Fenceline seeding and mulching (607E70000) | FT | 488 | $1.50 | $2.00 | $5.00 | $2.00 | $2.00 | $1.45 |
| 26 | Monument assembly, type C (623E38500) | EACH | 5 | $1,000.00 | $1,200.00 | $2,400.00 | $3,000.00 | $2,272.00 | $1,000.00 |
| 27 | Right-of-way monument, type B (623E40520) | EACH | 9 | $155.00 | $650.00 | $150.00 | $600.00 | $807.00 | $250.00 |
| 28 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,200.00 | $1,250.00 | $5,300.00 | $3,200.00 | $4,298.00 | $2,100.00 |
| 29 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,200.00 | $1,250.00 | $2,700.00 | $3,000.00 | $4,298.00 | $2,100.00 |
| 30 | Special - mailbox support system, single (690E50100) | EACH | 1 | $215.00 | $250.00 | $165.00 | $343.00 | $179.00 | $200.00 |
| 31 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 8 | $195.00 | $175.00 | $98.00 | $200.00 | $197.00 | $150.00 |
| 32 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 48 | $135.00 | $120.00 | $100.00 | $120.00 | $166.00 | $100.00 |
| 33 | Rock channel protection, type C with filter (601E32200) | CY | 3 | $245.00 | $100.00 | $200.00 | $254.00 | $239.00 | $200.00 |
| 34 | Concrete masonry (602E20000) | CY | 1 | $1,750.00 | $2,000.00 | $3,650.00 | $842.00 | $730.00 | $1,200.00 |
| 35 | Soil analysis test (659E00100) | EACH | 2 | $90.00 | $200.00 | $150.00 | $160.00 | $105.00 | $50.00 |
| 36 | Topsoil (659E00300) | CY | 427 | $40.00 | $36.00 | $26.00 | $22.00 | $73.00 | $12.00 |
| 37 | Seeding and mulching (659E10000) | SY | 3,847 | $2.00 | $2.00 | $3.00 | $2.00 | $2.00 | $1.20 |
| 38 | Repair seeding and mulching (659E14000) | SY | 192 | $0.75 | $4.00 | $2.50 | $0.80 | $1.00 | $1.00 |
| 39 | Inter-seeding (659E15000) | SY | 192 | $0.10 | $4.00 | $2.30 | $0.10 | $0.11 | $0.20 |
| 40 | Commercial fertilizer (659E20000) | TON | 0.54 | $645.00 | $1,500.00 | $3,000.00 | $690.00 | $678.00 | $800.00 |
| 41 | Lime (659E31000) | ACRE | 0.79 | $45.00 | $1,500.00 | $500.00 | $48.00 | $47.00 | $5.00 |
| 42 | Water (659E35000) | MGAL | 21 | $1.00 | $20.00 | $80.00 | $1.00 | $1.00 | $10.00 |
| 43 | Slope erosion protection (670E00500) | SY | 1,215 | $2.30 | $2.25 | $5.25 | $2.50 | $2.50 | $2.50 |
| 44 | Ditch erosion protection (670E00700) | SY | 542 | $2.40 | $2.50 | $5.25 | $2.50 | $2.50 | $2.50 |
| 45 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,150.00 | $1,600.00 | $2,185.00 | $1,100.00 | $7,500.00 | $1,025.00 |
| 46 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $3,225.00 | $1,850.00 | $8,160.00 | $9,900.00 | $18,396 | $4,625.25 |
| 47 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,600.00 | $9,925.00 | $8,600.00 | $11,150 | $10,953 | $14,500 |
| 48 | Erosion control (832E30000) | EACH | 56,681 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | 4" unclassified pipe underdrains (605E05200) | FT | 25 | $45.00 | $12.00 | $13.00 | $31.00 | $37.00 | $35.00 |
| 50 | 4" base pipe underdrains (605E06000) | FT | 3,002 | $13.32 | $10.00 | $14.00 | $16.00 | $26.00 | $13.00 |
| 51 | Aggregate drains (605E31100) | FT | 25 | $35.00 | $11.00 | $32.00 | $14.00 | $21.00 | $18.00 |
| 52 | 4" conduit, type F (611E00406) | FT | 25 | $45.00 | $14.00 | $25.00 | $13.00 | $29.00 | $35.00 |
| 53 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 123 | $15.00 | $14.00 | $25.00 | $40.00 | $37.00 | $40.00 |
| 54 | 8" conduit, type C (611E02000) | FT | 5 | $100.00 | $32.00 | $86.00 | $194.00 | $72.00 | $250.00 |
| 55 | 12" conduit, type D (611E04900) | FT | 140 | $80.00 | $34.00 | $45.00 | $56.00 | $90.00 | $90.00 |
| 56 | 15" conduit, type B (611E05900) | FT | 204 | $125.00 | $85.00 | $91.00 | $160.00 | $127.00 | $200.00 |
| 57 | 15" conduit, type C (611E06100) | FT | 26 | $100.00 | $60.00 | $76.00 | $124.00 | $129.00 | $160.00 |
| 58 | 15" conduit, type D (611E06400) | FT | 43 | $100.00 | $60.00 | $42.00 | $79.00 | $100.00 | $120.00 |
| 59 | 24" conduit, type D (611E10900) | FT | 286 | $145.00 | $95.00 | $80.00 | $73.00 | $105.00 | $300.00 |
| 60 | Catch basin, no. 3 (611E98150) | EACH | 3 | $7,800.00 | $5,600.00 | $4,000.00 | $5,000.00 | $5,832.00 | $6,500.00 |
| 61 | Catch basin, no. 2-2B (611E98470) | EACH | 3 | $5,800.00 | $3,200.00 | $2,800.00 | $2,822.00 | $4,614.00 | $4,200.00 |
| 62 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 1 | $2,850.00 | $1,350.00 | $1,200.00 | $985.00 | $1,658.00 | $3,200.00 |
| 63 | Manhole, no. 3 (611E99574) | EACH | 2 | $8,900.00 | $6,450.00 | $3,800.00 | $4,730.00 | $7,042.00 | $6,600.00 |
| 64 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $850.00 | $400.00 | $650.00 | $292.00 | $567.00 | $550.00 |
| 65 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 796 | $200.00 | $166.00 | $199.00 | $178.00 | $166.00 | $215.00 |
| 66 | Aggregate base (304E20000) | CY | 1,380 | $70.00 | $70.00 | $63.00 | $77.00 | $72.00 | $80.00 |
| 67 | Tack coat (407E10000) | GAL | 831 | $2.50 | $2.55 | $3.50 | $3.00 | $3.00 | $2.50 |
| 68 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 11 | $500.00 | $555.00 | $333.00 | $594.00 | $555.00 | $860.00 |
| 69 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 7 | $500.00 | $400.00 | $256.00 | $428.00 | $400.00 | $860.00 |
| 70 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 310 | $315.00 | $364.00 | $330.00 | $390.00 | $364.00 | $449.00 |
| 71 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 315 | $245.00 | $250.00 | $226.00 | $267.00 | $250.00 | $290.00 |
| 72 | 8" reinforced concrete pavement, class QC 1P, as per plan (451E13011) | SY | 148 | $95.00 | $108.00 | $140.00 | $156.00 | $200.00 | $150.00 |
| 73 | 6" non-reinforced concrete pavement, class QC 1P, as per plan (452E10011) | SY | 485 | $84.00 | $77.00 | $145.00 | $105.00 | $105.00 | $79.00 |
| 74 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 362 | $70.00 | $67.00 | $90.00 | $100.00 | $110.00 | $88.00 |
| 75 | Curb, type 2-A (609E14000) | FT | 236 | $10.00 | $13.75 | $6.00 | $21.00 | $12.00 | $5.00 |
| 76 | Combination curb and gutter, type 3 (609E18000) | FT | 1,235 | $15.00 | $23.00 | $30.00 | $40.00 | $32.00 | $22.00 |
| 77 | Curb, type 3-B, as per plan (609E22001) | FT | 327 | $15.00 | $15.50 | $27.00 | $28.00 | $32.00 | $20.50 |
| 78 | Curb, type 4-C (609E24510) | FT | 701 | $12.00 | $16.00 | $33.00 | $37.00 | $42.00 | $20.00 |
| 79 | Curb, type 6 (609E26000) | FT | 695 | $12.00 | $16.00 | $33.00 | $38.00 | $61.00 | $20.00 |
| 80 | 4" conduit, type E (611E00400) | FT | 100 | $2.00 | $16.00 | $10.00 | $5.00 | $2.00 | $40.00 |
| 81 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $800.00 | $400.00 | $650.00 | $375.00 | $800.00 | $425.00 |
| 82 | Connection, fused pull apart (625E00450) | EACH | 72 | $130.00 | $110.00 | $145.00 | $120.00 | $130.00 | $175.00 |
| 83 | Light pole, conventional, 30' pole, 10' bracket AR (625E10490) | EACH | 8 | $3,100.00 | $3,100.00 | $3,200.00 | $3,420.00 | $3,100.00 | $6,000.00 |
| 84 | Light pole, conventional, 30' pole, 15' bracket AR (625E10490) | EACH | 1 | $3,200.00 | $3,300.00 | $3,400.00 | $3,650.00 | $3,200.00 | $6,700.00 |
| 85 | Light pole, conventional, 30' pole, 20' bracket AR (625E10490) | EACH | 1 | $3,400.00 | $3,300.00 | $3,900.00 | $3,200.00 | $3,400.00 | $7,100.00 |
| 86 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 10 | $1,200.00 | $1,565.00 | $1,900.00 | $1,600.00 | $1,200.00 | $2,800.00 |
| 87 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 351 | $4.00 | $3.70 | $4.50 | $4.00 | $4.00 | $13.00 |
| 88 | No. 12 AWG pole and bracket cable (625E23410) | FT | 1,395 | $1.00 | $1.94 | $1.90 | $1.00 | $1.00 | $2.00 |
| 89 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 1,098 | $18.50 | $12.00 | $15.00 | $12.00 | $18.50 | $25.00 |
| 90 | Conduit, 3", 725.04 (625E25500) | FT | 113 | $25.00 | $31.00 | $30.00 | $32.00 | $25.00 | $68.00 |
| 91 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 172 | $45.00 | $50.00 | $125.00 | $50.00 | $45.00 | $85.00 |
| 92 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 10 | $410.00 | $440.00 | $725.00 | $450.00 | $410.00 | $1,100.00 |
| 93 | Trench, 24" deep (625E29002) | FT | 950 | $10.00 | $11.00 | $12.00 | $12.00 | $11.00 | $15.00 |
| 94 | Pull box, 725.08, 18" (625E30700) | EACH | 7 | $1,000.00 | $1,100.00 | $950.00 | $1,200.00 | $1,051.00 | $1,800.00 |
| 95 | Ground rod (625E32000) | EACH | 10 | $300.00 | $265.00 | $350.00 | $270.00 | $315.00 | $350.00 |
| 96 | Power service, as per plan (625E34001) | EACH | 1 | $2,500.00 | $2,396.00 | $6,800.00 | $2,600.00 | $2,628.00 | $10,000 |
| 97 | Control center cabinet, complete (625E34450) | EACH | 1 | $4,400.00 | $8,700.00 | $5,500.00 | $9,000.00 | $4,625.00 | $6,400.00 |
| 98 | Underground warning marking tape (625E36010) | FT | 950 | $2.00 | $3.00 | $3.50 | $3.00 | $2.00 | $4.50 |
| 99 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,000.00 | $300.00 | $900.00 | $320.00 | $1,051.00 | $5,100.00 |
| 100 | Delineator, post surface mounted (620E60000) | EACH | 8 | $165.00 | $165.00 | $125.00 | $128.00 | $200.00 | $95.00 |
| 101 | RPM (621E00100) | EACH | 108 | $61.25 | $61.25 | $61.25 | $69.00 | $68.00 | $67.38 |
| 102 | Raised pavement marker removed (621E54000) | EACH | 48 | $10.00 | $20.00 | $35.00 | $12.00 | $11.00 | $42.00 |
| 103 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 6 | $15.00 | $15.00 | $10.00 | $16.00 | $16.00 | $13.00 |
| 104 | Ground mounted support, no. 3 post (630E03100) | FT | 329.40 | $17.00 | $17.00 | $12.00 | $18.00 | $18.00 | $17.00 |
| 105 | Ground mounted support, no. 4 post (630E04100) | FT | 164.50 | $18.00 | $18.00 | $14.00 | $19.00 | $19.00 | $18.00 |
| 106 | Street name sign support, no. 3 post (630E08520) | FT | 11 | $16.90 | $16.90 | $13.00 | $18.00 | $18.00 | $16.90 |
| 107 | Sign post reflector (630E08600) | EACH | 28 | $45.00 | $45.00 | $65.00 | $48.00 | $47.00 | $45.00 |
| 108 | Sign support assembly, pole mounted (630E79500) | EACH | 4 | $225.00 | $225.00 | $95.00 | $241.00 | $237.00 | $225.00 |
| 109 | Sign, flat sheet (630E80100) | SF | 338.22 | $15.00 | $15.00 | $14.00 | $16.00 | $16.00 | $15.00 |
| 110 | Sign, double faced, street name (630E80500) | EACH | 1 | $195.00 | $195.00 | $145.00 | $209.00 | $205.00 | $195.00 |
| 111 | Removal of ground mounted sign and disposal (630E84900) | EACH | 40 | $10.00 | $10.00 | $45.00 | $11.00 | $11.00 | $10.00 |
| 112 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $65.00 | $65.00 | $125.00 | $70.00 | $68.00 | $65.00 |
| 113 | Removal of ground mounted sign and delivery (630E85200) | EACH | 1 | $50.00 | $50.00 | $55.00 | $54.00 | $53.00 | $50.00 |
| 114 | Removal of ground mounted post support and disposal (630E86002) | EACH | 34 | $15.00 | $15.00 | $60.00 | $16.00 | $21.00 | $15.00 |
| 115 | Signing, misc.: 6" PVC pipe (630E97700) | EACH | 9 | $45.00 | $45.00 | $725.00 | $48.00 | $53.00 | $90.00 |
| 116 | Edge line, 6" (644E00104) | MI | 1.18 | $6,000.00 | $6,000.00 | $2,800.00 | $6,420.00 | $7,359.00 | $7,955.00 |
| 117 | Center line (644E00300) | MI | 0.47 | $10,000 | $10,000 | $7,500.00 | $10,700 | $8,410.00 | $10,320 |
| 118 | Transverse/diagonal line (644E00700) | FT | 166 | $7.00 | $7.00 | $9.00 | $7.00 | $11.00 | $5.50 |
| 119 | Lane arrow (644E01300) | EACH | 4 | $100.00 | $100.00 | $145.00 | $107.00 | $131.00 | $200.00 |
| 120 | Dotted line, 6" (644E01510) | FT | 174 | $3.00 | $3.00 | $5.00 | $3.00 | $2.00 | $1.50 |
| 121 | Yield line (644E20800) | FT | 63 | $10.00 | $10.00 | $15.00 | $11.00 | $21.00 | $8.50 |
| 122 | Special - stone mulch (690E98300) | SY | 453 | $48.00 | $60.00 | $60.00 | $53.00 | $105.00 | $40.00 |
| 123 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 120 | $50.00 | $90.00 | $50.00 | $75.00 | $68.00 | $105.00 |
| 124 | Detour signing (614E12420) | LS | 1 | $10,000 | $10,000 | $22,850 | $12,000 | $15,000 | $15,000 |
| 125 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,150.00 | $1,000.00 | $900.00 | $1,050.00 | $762.00 | $700.00 |
| 126 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.47 | $2,500.00 | $2,500.00 | $2,500.00 | $2,600.00 | $3,926.00 | $3,005.00 |
| 127 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.18 | $1,500.00 | $1,500.00 | $1,100.00 | $1,600.00 | $2,355.00 | $2,415.00 |
| 128 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 174 | $1.00 | $1.00 | $3.00 | $1.00 | $3.00 | $1.00 |
| 129 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 166 | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 | $3.50 |
| 130 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 4 | $40.00 | $40.00 | $85.00 | $43.00 | $102.00 | $100.00 |
| 131 | Roads for maintaining traffic (615E10000) | LS | 1 | $11,330 | $32,000 | $25,000 | $16,000 | $25,848 | $7,500.00 |
| 132 | Water (616E10000) | MGAL | 35 | $25.00 | $15.00 | $80.00 | $65.00 | $43.00 | $150.00 |
| 133 | Temporary lighting (625E39000) | LS | 1 | $20,000 | $15,000 | $30,000 | $9,000.00 | $21,024 | $26,250 |
| 134 | Yield line, type 1 (642E20802) | FT | 64 | $5.00 | $5.00 | $5.00 | $5.00 | $11.00 | $8.50 |
| 135 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $23,500 | $16,000 | $15,000 | $13,000 | $28,000 | $9,000.00 |
| 136 | Maintaining traffic (614E11000) | LS | 1 | $6,000.00 | $15,000 | $12,000 | $24,000 | $21,961 | $67,000 |
| 137 | Field office, type B (619E16010) | MNTH | 10 | $600.00 | $1,200.00 | $2,000.00 | $4,250.00 | $683.00 | $4,800.00 |
| 138 | Construction layout stakes and surveying (623E10000) | LS | 1 | $18,000 | $20,900 | $28,000 | $20,000 | $30,000 | $32,000 |
| 139 | Mobilization (624E10000) | LS | 1 | $67,650 | $100,000 | $73,000 | $88,000 | $49,390 | $102,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way