UNI-US 42-03.91 (MINOR RECONSTRUCTION). Let by Ohio DOT on May 22, 2025, UNI. 6 bids received; low bid $7,959,354 by Shelly Company, -13% against the engineer's estimate of $9,133,000.
- Owner
- Ohio DOT
- Letting
- 22 MAY 2025
- Pay items
- 171
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $7,959,354 | Low | -13% |
| 2 | Shelly & Sands Inc | $8,372,353 | +5.0% | -8.0% |
| 3 | Trucco Construction Co Inc | $8,383,722 | +5.0% | -8.0% |
| 4 | Strawser Paving Co Inc | $8,388,383 | +5.0% | -8.0% |
| 5 | Complete General Construction Company | $8,489,688 | +7.0% | -7.0% |
| 6 | Danbert Incorporated | $9,066,319 | +14% | -1.0% |
Engineer's estimate: $9,133,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Shelly & Sands Inc | 3. Trucco Construction Co Inc | 4. Strawser Paving Co Inc | 5. Complete General Construction Company | 6. Danbert Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $40,000 | $31,230 | $35,800 | $26,500 | $48,000 | $3,500.00 |
| 3 | Pavement removed (202E23000) | SY | 42,055.30 | $7.05 | $5.00 | $8.50 | $9.25 | $16.00 | $9.31 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 99 | $28.00 | $13.00 | $22.00 | $13.00 | $40.00 | $30.05 |
| 5 | Guardrail removed (202E38000) | FT | 737 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $3.00 |
| 6 | Special - parking block removed (202E52990) | EACH | 8 | $52.50 | $32.00 | $61.00 | $100.00 | $78.80 | $144.23 |
| 7 | Fence removed (202E75000) | FT | 1,094 | $0.75 | $4.80 | $5.00 | $4.25 | $4.25 | $10.91 |
| 8 | Removal misc.: bird bath (202E98100) | EACH | 1 | $105.00 | $98.00 | $114.00 | $400.00 | $400.00 | $626.01 |
| 9 | Removal misc.: flag (202E98100) | EACH | 3 | $35.00 | $32.00 | $38.00 | $150.00 | $62.00 | $438.21 |
| 10 | Removal misc.: landscaping removal (202E98400) | SF | 4,041 | $0.45 | $0.50 | $2.80 | $0.25 | $2.50 | $1.34 |
| 11 | Excavation (203E10000) | CY | 16,829 | $42.25 | $28.50 | $31.00 | $24.00 | $20.00 | $33.45 |
| 12 | Embankment (203E20000) | CY | 4,474 | $30.00 | $11.50 | $6.70 | $8.50 | $9.00 | $22.62 |
| 13 | Subgrade compaction (204E10000) | SY | 1,141.90 | $3.65 | $2.75 | $4.20 | $1.00 | $4.00 | $5.36 |
| 14 | Excavation of subgrade (204E13000) | CY | 380.60 | $43.00 | $34.00 | $24.00 | $50.00 | $40.00 | $37.52 |
| 15 | Proof rolling (204E45000) | HR | 23 | $250.00 | $555.00 | $336.00 | $100.00 | $350.00 | $200.00 |
| 16 | Cement (206E10500) | TON | 1,339 | $205.15 | $205.00 | $205.00 | $205.15 | $205.15 | $214.44 |
| 17 | Curing coat (206E11000) | SY | 45,098.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.25 |
| 18 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 45,098.20 | $2.63 | $2.63 | $3.80 | $2.63 | $4.72 | $2.75 |
| 19 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $16,449 | $16,449 | $16,400 | $16,449 | $16,500 | $17,194 |
| 20 | Preparing subgrade for shoulder paving (209E72050) | MI | 3.23 | $1,725.00 | $3,000.00 | $1,660.00 | $300.00 | $6,200.00 | $3,054.26 |
| 21 | Guardrail, type MGS (606E15050) | FT | 287.50 | $21.20 | $21.20 | $21.00 | $24.80 | $21.20 | $30.00 |
| 22 | Guardrail, type MGS, long-span (606E17360) | FT | 100 | $24.80 | $24.80 | $25.00 | $24.80 | $24.80 | $30.00 |
| 23 | Anchor assembly, MGS type E(MASH 2016) (606E26150) | EACH | 4 | $2,520.00 | $2,520.00 | $2,520.00 | $2,520.00 | $2,520.00 | $2,700.00 |
| 24 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,360.00 | $1,360.00 | $1,360.00 | $1,360.00 | $1,360.00 | $1,250.00 |
| 25 | Special - mailbox support (690E50000) | EACH | 4 | $219.00 | $219.00 | $219.00 | $500.00 | $216.00 | $443.64 |
| 26 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $65,000 | $36,000 | $58,000 | $12,500 | $22,500 | $65,860 |
| 27 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 39.60 | $435.00 | $167.00 | $165.00 | $175.00 | $75.00 | $152.38 |
| 28 | Topsoil (659E00300) | CY | 2,336 | $64.50 | $37.00 | $16.00 | $60.00 | $24.00 | $29.33 |
| 29 | Seeding and mulching (659E10000) | SY | 21,040 | $0.77 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 30 | Repair seeding and mulching (659E14000) | SY | 1,052 | $0.73 | $0.80 | $1.20 | $0.80 | $0.80 | $0.80 |
| 31 | Inter-seeding (659E15000) | SY | 1,052 | $0.73 | $0.80 | $1.20 | $0.80 | $0.80 | $0.80 |
| 32 | Commercial fertilizer (659E20000) | TON | 2.84 | $898.11 | $1,250.00 | $1,430.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 33 | Lime (659E31000) | ACRE | 4.35 | $154.73 | $150.00 | $820.00 | $150.00 | $150.00 | $150.00 |
| 34 | Water (659E35000) | MGAL | 57 | $1.00 | $1.00 | $140.00 | $1.00 | $1.00 | $1.00 |
| 35 | Mowing (659E40000) | MSF | 47 | $25.00 | $50.00 | $72.00 | $50.00 | $50.00 | $50.00 |
| 36 | Sodding staked (660E25000) | SY | 199 | $18.00 | $15.00 | $32.00 | $15.00 | $15.00 | $15.00 |
| 37 | Slope erosion protection (670E00500) | SY | 3,233 | $1.12 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 38 | Ditch erosion protection (670E00700) | SY | 1,172 | $1.15 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 39 | Ditch erosion protection mat, type B (670E00720) | SY | 598 | $1.15 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 40 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,135.00 | $4,500.00 | $4,140.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 41 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,080.00 | $19,000 | $17,300 | $31,500 | $31,500 | $31,500 |
| 42 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $15,045 | $15,000 | $21,000 | $15,044 | $15,043 | $5,000.00 |
| 43 | Erosion control (832E30000) | EACH | 147,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 44 | Rock channel protection, type A with filter (601E32000) | CY | 24 | $170.00 | $131.00 | $178.00 | $275.00 | $260.00 | $205.37 |
| 45 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 45 | $102.00 | $135.00 | $194.00 | $102.00 | $175.00 | $194.05 |
| 46 | Rock channel protection, type B with filter (601E32100) | CY | 34 | $138.75 | $147.00 | $193.00 | $360.00 | $190.00 | $195.17 |
| 47 | Rock channel protection, type C with filter (601E32200) | CY | 185 | $118.50 | $126.00 | $193.00 | $230.00 | $177.00 | $201.77 |
| 49 | Masonry, misc.:masonry collar per DM-1.1 (602E98300) | EACH | 2 | $1,385.00 | $1,600.00 | $3,520.00 | $1,800.00 | $740.00 | $2,150.08 |
| 50 | 4" shallow pipe underdrains (605E05100) | FT | 11,950 | $13.50 | $14.00 | $9.40 | $9.00 | $14.00 | $19.26 |
| 51 | 4" base pipe underdrains (605E06000) | FT | 13,139 | $13.50 | $13.00 | $7.90 | $9.00 | $13.00 | $16.30 |
| 52 | 6" shallow pipe underdrains (605E11100) | FT | 4,424 | $13.50 | $18.00 | $11.00 | $10.00 | $15.00 | $21.28 |
| 53 | 4" conduit, type E (611E00400) | FT | 50 | $25.00 | $18.00 | $13.00 | $40.00 | $35.00 | $66.48 |
| 54 | 4" conduit, type F (611E00406) | FT | 50 | $25.00 | $19.00 | $14.00 | $40.00 | $35.00 | $66.48 |
| 55 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 163 | $75.50 | $34.00 | $15.00 | $25.00 | $31.00 | $38.08 |
| 56 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 50 | $74.50 | $29.00 | $18.00 | $75.00 | $46.00 | $40.51 |
| 57 | 12" conduit, type B (611E04400) | FT | 1,496 | $57.50 | $98.00 | $102.00 | $120.00 | $105.00 | $106.80 |
| 58 | 12" conduit, type D (611E04900) | FT | 20 | $47.50 | $74.00 | $207.00 | $130.00 | $93.01 | $121.82 |
| 59 | 15" conduit, type B (611E05900) | FT | 599 | $62.00 | $111.00 | $120.00 | $125.00 | $130.00 | $126.07 |
| 60 | 15" conduit, type C (611E06100) | FT | 108 | $67.50 | $104.00 | $83.00 | $130.00 | $109.00 | $96.22 |
| 61 | 21" conduit, type A (611E08700) | FT | 66 | $123.25 | $195.00 | $305.00 | $230.00 | $185.00 | $244.39 |
| 62 | 21" conduit, type D (611E09400) | FT | 23 | $84.00 | $192.00 | $205.00 | $200.00 | $145.00 | $175.08 |
| 63 | 24" conduit, type A (611E10200) | FT | 67 | $164.50 | $185.00 | $336.00 | $240.00 | $200.00 | $255.11 |
| 64 | 24" conduit, type B (611E10400) | FT | 59 | $93.00 | $170.00 | $308.00 | $150.00 | $185.00 | $221.41 |
| 65 | 24" conduit, type C (611E10600) | FT | 18 | $108.25 | $173.00 | $131.00 | $250.00 | $135.00 | $206.57 |
| 66 | 54" conduit, type A (611E22200) | FT | 70 | $465.00 | $740.00 | $600.00 | $500.00 | $477.00 | $819.00 |
| 67 | 8' X 4' conduit, type A, 706.05, as per plan (611E94801) | FT | 90 | $2,010.00 | $1,622.00 | $1,600.00 | $1,800.00 | $1,250.00 | $1,672.36 |
| 68 | Conduit reconstructed, 12" CMP (611E96500) | FT | 5 | $315.00 | $319.00 | $870.00 | $315.00 | $145.00 | $1,533.79 |
| 69 | Catch basin, no. 3A (611E98180) | EACH | 18 | $2,900.00 | $3,900.00 | $4,300.00 | $3,600.00 | $4,400.00 | $4,610.43 |
| 70 | Catch basin, no. 6 (611E98370) | EACH | 1 | $2,750.00 | $3,600.00 | $3,820.00 | $3,500.00 | $4,500.00 | $7,153.18 |
| 71 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,675.00 | $3,580.00 | $8,100.00 | $3,400.00 | $3,800.00 | $3,587.85 |
| 72 | Manhole, no. 3 (611E99574) | EACH | 1 | $2,975.00 | $3,900.00 | $4,770.00 | $3,500.00 | $5,000.00 | $6,403.11 |
| 73 | Manhole reconstructed to grade (611E99660) | EACH | 10 | $1,300.00 | $1,790.00 | $3,610.00 | $2,500.00 | $2,400.00 | $2,545.72 |
| 74 | Precast reinforced concrete outlet (611E99710) | EACH | 22 | $330.00 | $575.00 | $411.00 | $700.00 | $511.00 | $478.11 |
| 75 | Pavement planing, asphalt concrete(1.5" max) (254E01000) | SY | 11,038.90 | $2.90 | $4.50 | $3.10 | $3.00 | $3.05 | $3.05 |
| 76 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 9,779.50 | $137.00 | $169.00 | $137.00 | $165.00 | $137.00 | $147.00 |
| 77 | Aggregate base (304E20000) | CY | 7,708.90 | $45.75 | $70.00 | $75.00 | $59.00 | $60.00 | $75.17 |
| 78 | Non-tracking tack coat (407E20000) | GAL | 11,302 | $4.05 | $3.25 | $4.10 | $3.00 | $4.05 | $4.05 |
| 79 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 2,439.60 | $165.00 | $190.00 | $165.00 | $195.00 | $165.00 | $175.00 |
| 80 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 2,314.80 | $210.00 | $236.00 | $210.00 | $260.00 | $210.00 | $220.00 |
| 81 | Curb, type 4-C (609E24510) | FT | 3,447 | $19.50 | $21.00 | $27.00 | $22.00 | $22.00 | $34.41 |
| 82 | Light pole removed (625E75400) | EACH | 4 | $300.00 | $300.00 | $210.00 | $210.00 | $300.00 | $210.00 |
| 83 | Ground mounted support, no. 2 post (630E02100) | FT | 527.50 | $14.00 | $14.00 | $14.00 | $13.55 | $14.00 | $14.00 |
| 84 | Ground mounted support, no. 3 post (630E03100) | FT | 438 | $15.00 | $15.00 | $15.00 | $15.46 | $15.00 | $15.50 |
| 85 | Ground mounted support, no. 4 post (630E04100) | FT | 54 | $17.60 | $17.60 | $18.00 | $23.10 | $17.60 | $20.00 |
| 86 | Sign, flat sheet (630E80100) | SF | 478.10 | $16.00 | $16.00 | $16.00 | $19.09 | $16.00 | $24.00 |
| 87 | Removal of ground mounted sign and disposal (630E84900) | EACH | 38 | $10.00 | $10.00 | $10.00 | $16.56 | $10.00 | $25.00 |
| 88 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $65.00 | $65.00 | $65.00 | $61.15 | $65.00 | $150.00 |
| 89 | Removal of ground mounted post support and disposal (630E86002) | EACH | 40 | $15.00 | $15.00 | $15.00 | $22.08 | $15.00 | $25.00 |
| 90 | Edge line, 6" (644E00104) | MI | 2.94 | $4,725.00 | $4,725.00 | $4,730.00 | $4,170.00 | $4,725.00 | $4,170.00 |
| 91 | Lane line, 6" (644E00204) | MI | 1.12 | $2,250.00 | $2,250.00 | $2,250.00 | $1,970.00 | $2,250.00 | $1,970.00 |
| 92 | Center line (644E00300) | MI | 2.19 | $5,519.00 | $5,519.00 | $5,500.00 | $4,795.00 | $5,519.00 | $4,795.00 |
| 93 | Channelizing line, 8" (644E00400) | FT | 4,642 | $1.70 | $1.70 | $1.70 | $1.35 | $1.70 | $1.35 |
| 94 | Stop line (644E00500) | FT | 396 | $8.80 | $8.80 | $8.80 | $5.05 | $8.80 | $5.05 |
| 95 | Lane arrow (644E01300) | EACH | 72 | $105.00 | $105.00 | $105.00 | $125.00 | $105.00 | $125.00 |
| 96 | Dotted line, 6" (644E01510) | FT | 1,256 | $0.90 | $0.90 | $0.90 | $1.20 | $0.90 | $1.20 |
| 97 | Bracket arm, 30' (625E18510) | EACH | 2 | $2,750.00 | $2,674.00 | $2,670.00 | $2,675.50 | $2,750.00 | $2,674.50 |
| 98 | Conduit, 2", 725.04 (625E25400) | FT | 13 | $32.00 | $46.50 | $46.00 | $46.35 | $32.00 | $46.35 |
| 99 | Conduit, 3", 725.04 (625E25500) | FT | 72 | $39.50 | $40.75 | $41.00 | $40.76 | $39.50 | $40.76 |
| 100 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 2 | $600.00 | $666.00 | $670.00 | $666.00 | $600.00 | $666.00 |
| 101 | Trench (625E29000) | FT | 24 | $10.00 | $11.00 | $11.00 | $10.94 | $10.00 | $10.94 |
| 102 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,600.00 | $1,196.00 | $1,200.00 | $1,196.00 | $1,600.00 | $1,196.00 |
| 103 | Ground rod (625E32000) | EACH | 4 | $325.00 | $355.50 | $356.00 | $355.50 | $325.00 | $355.50 |
| 104 | Underground warning marking tape (625E36010) | FT | 24 | $1.00 | $0.25 | $0.20 | $0.22 | $1.00 | $0.22 |
| 105 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 6 | $900.00 | $1,224.00 | $1,220.00 | $1,224.00 | $900.00 | $1,224.00 |
| 106 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 6 | $1,600.00 | $1,884.00 | $1,880.00 | $1,884.00 | $1,600.00 | $1,884.00 |
| 107 | Covering of vehicular signal head (632E25000) | EACH | 12 | $40.00 | $69.00 | $69.00 | $69.00 | $40.00 | $69.00 |
| 108 | Messenger wire, 7 strand, 3/8" diameter with accessories (632E30200) | FT | 415 | $20.00 | $16.66 | $17.00 | $16.66 | $20.00 | $16.66 |
| 109 | Tether wire, with accessories (632E30600) | FT | 415 | $22.50 | $17.90 | $18.00 | $17.83 | $22.50 | $17.83 |
| 110 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,565 | $3.00 | $3.67 | $3.70 | $3.67 | $3.00 | $3.67 |
| 111 | Signal cable, 3 conductor, no. 12 AWG (632E42300) | FT | 690 | $2.50 | $3.10 | $3.10 | $3.10 | $2.50 | $3.10 |
| 112 | Strain pole foundation (632E64000) | EACH | 4 | $9,200.00 | $7,412.00 | $7,400.00 | $7,412.50 | $9,100.00 | $7,412.50 |
| 113 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 103 | $6.00 | $5.56 | $5.60 | $5.56 | $6.00 | $5.56 |
| 114 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 134 | $6.00 | $4.79 | $4.80 | $4.79 | $6.00 | $4.79 |
| 115 | Power service (632E70000) | EACH | 1 | $2,500.00 | $3,501.00 | $3,500.00 | $3,501.50 | $2,500.00 | $3,501.50 |
| 116 | Conduit riser, 2" diameter (632E70400) | EACH | 2 | $1,000.00 | $982.00 | $980.00 | $982.00 | $1,000.00 | $982.00 |
| 117 | Strain pole, type TC-81.11, design 13 (632E86150) | EACH | 2 | $15,100 | $15,909 | $15,900 | $15,909 | $15,100 | $15,909 |
| 118 | Combination strain pole, type TC-81.11, design 13 (632E87150) | EACH | 2 | $16,500 | $17,759 | $17,800 | $17,759 | $16,500 | $17,759 |
| 119 | Removal of traffic signal installation (632E90100) | EACH | 1 | $3,000.00 | $1,575.00 | $1,580.00 | $1,575.00 | $3,000.00 | $1,575.00 |
| 120 | Signalization, misc.: cdma modem, furnish only (632E90400) | EACH | 1 | $3,000.00 | $3,020.00 | $3,020.00 | $3,020.00 | $3,000.00 | $3,020.00 |
| 121 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $17,600 | $17,234 | $17,200 | $17,234 | $17,600 | $17,234 |
| 122 | Cabinet foundation (633E67100) | EACH | 1 | $4,400.00 | $3,302.00 | $3,300.00 | $3,302.00 | $4,400.00 | $3,302.00 |
| 123 | Controller work pad (633E67200) | EACH | 1 | $2,200.00 | $535.00 | $540.00 | $535.00 | $2,200.00 | $535.00 |
| 124 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $7,200.00 | $7,671.00 | $7,700.00 | $7,671.00 | $7,200.00 | $7,671.00 |
| 125 | Controller item, misc.: ethernet radio (ubiquity) (633E99000) | EACH | 1 | $1,400.00 | $1,522.00 | $1,520.00 | $1,522.00 | $1,400.00 | $1,522.00 |
| 126 | Controller item, misc.: unmanaged ethernet switch (633E99000) | EACH | 1 | $1,600.00 | $1,600.00 | $1,510.00 | $1,513.00 | $1,600.00 | $1,513.00 |
| 127 | Ethernet cable, outdoor-rated (809E64550) | FT | 30 | $3.00 | $11.60 | $12.00 | $11.60 | $3.00 | $11.60 |
| 128 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $8,300.00 | $8,935.00 | $8,900.00 | $8,935.00 | $8,750.00 | $8,935.00 |
| 129 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,200.00 | $8,605.00 | $8,600.00 | $8,605.00 | $8,500.00 | $8,605.00 |
| 130 | Atc controller, as per plan (809E69123) | EACH | 1 | $1,000.00 | $1,015.00 | $1,020.00 | $1,015.00 | $1,000.00 | $1,015.00 |
| 131 | Traffic compacted surface, type A, as per plan (410E10001) | CY | 100 | $110.00 | $72.60 | $117.00 | $75.00 | $160.00 | $152.81 |
| 132 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $80.00 | $104.00 | $135.00 | $75.00 | $96.00 | $150.00 |
| 133 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 15 | $2,300.00 | $2,150.00 | $2,200.00 | $1,941.85 | $2,320.00 | $1,941.85 |
| 134 | Detour signing (614E12420) | LS | 1 | $16,000 | $12,000 | $17,200 | $9,716.42 | $83,000 | $9,716.42 |
| 135 | Replacement sign (614E12500) | EACH | 5 | $250.00 | $225.00 | $269.00 | $149.99 | $400.00 | $149.99 |
| 136 | Replacement drum (614E12600) | EACH | 50 | $55.00 | $48.50 | $59.00 | $54.99 | $80.00 | $54.99 |
| 137 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 80 | $17.99 | $10.00 | $16.00 | $11.64 | $12.00 | $11.64 |
| 138 | Object marker, two way (614E13360) | EACH | 80 | $17.99 | $14.00 | $27.00 | $19.88 | $20.00 | $19.88 |
| 139 | Work zone lane line, class I, 4" (614E20000) | MI | 0.48 | $785.00 | $575.00 | $790.00 | $375.00 | $785.00 | $375.00 |
| 140 | Work zone center line, class I (614E21000) | MI | 3.35 | $1,450.00 | $1,575.00 | $1,450.00 | $2,660.00 | $1,450.00 | $2,660.00 |
| 141 | Work zone edge line, class I, 4" (614E22000) | MI | 12.81 | $785.00 | $900.00 | $790.00 | $1,500.00 | $785.00 | $1,500.00 |
| 142 | Work zone channelizing line, class I, 8" (614E23000) | FT | 971 | $0.95 | $0.55 | $1.00 | $0.75 | $0.95 | $0.75 |
| 143 | Work zone dotted line, class I (614E24000) | FT | 1,734 | $0.80 | $0.50 | $0.80 | $0.65 | $0.80 | $0.65 |
| 144 | Work zone stop line, class I (614E26000) | FT | 423 | $3.50 | $3.50 | $3.50 | $4.00 | $3.50 | $4.00 |
| 145 | Work zone arrow, class I (614E30000) | EACH | 8 | $80.00 | $60.00 | $80.00 | $75.00 | $80.00 | $75.00 |
| 146 | Roads for maintaining traffic (615E10000) | LS | 1 | $230,000 | $140,000 | $215,000 | $280,000 | $275,000 | $526,510 |
| 147 | Pavement for maintaining traffic, class A (615E20000) | SY | 12,286.90 | $51.00 | $65.00 | $83.97 | $55.00 | $45.00 | $46.75 |
| 148 | Portable barrier, unanchored (622E41100) | FT | 3,837 | $14.25 | $15.00 | $19.00 | $32.53 | $26.00 | $32.53 |
| 149 | Structure removed (202E11000) | LS | 1 | $25,000 | $20,000 | $17,400 | $25,000 | $50,000 | $22,713 |
| 150 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $12,000 | $38,000 | $40,300 | $12,000 | $10,000 | $23,123 |
| 151 | Unclassified excavation (503E21300) | LS | 1 | $16,500 | $20,000 | $17,400 | $17,500 | $8,200.00 | $6,683.86 |
| 152 | Epoxy coated steel reinforcement (509E10000) | LB | 5,700 | $2.85 | $4.25 | $1.80 | $2.05 | $2.51 | $7.60 |
| 153 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 17.40 | $1,730.00 | $4,000.00 | $2,650.00 | $1,800.00 | $2,400.00 | $3,420.43 |
| 154 | Class QC1 concrete, footing (511E46510) | CY | 43 | $1,025.00 | $986.00 | $1,040.00 | $985.00 | $650.00 | $741.29 |
| 155 | Class QC1 concrete, headwall (511E46610) | CY | 3.60 | $2,850.00 | $3,077.00 | $3,270.00 | $2,200.00 | $4,500.00 | $2,915.18 |
| 156 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 61 | $31.00 | $65.00 | $65.00 | $29.00 | $40.00 | $65.00 |
| 157 | Type 2 waterproofing (512E33000) | SY | 163 | $20.00 | $26.00 | $26.00 | $20.00 | $25.00 | $32.55 |
| 158 | 1" preformed expansion joint filler (516E13600) | SF | 28 | $18.00 | $1.50 | $6.00 | $18.00 | $15.00 | $22.86 |
| 159 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $12,000 | $3,000.00 | $8,800.00 | $11,000 | $5,800.00 | $7,098.22 |
| 160 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $35,000 | $42,000 | $45,500 | $45,000 | $99,057 |
| 161 | Maintaining traffic (614E11000) | LS | 1 | $292,000 | $175,000 | $203,000 | $300,000 | $250,000 | $306,254 |
| 162 | Field office, type B (619E16010) | MNTH | 6 | $4,500.00 | $5,700.00 | $4,170.00 | $3,500.00 | $2,500.00 | $3,000.00 |
| 163 | Construction layout stakes and surveying (623E10000) | LS | 1 | $60,000 | $82,731 | $68,000 | $50,000 | $126,000 | $53,200 |
| 164 | Mobilization (624E10000) | LS | 1 | $200,000 | $275,000 | $200,000 | $200,000 | $424,000 | $232,660 |
| 200 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $3,750.00 | $5,500.00 | $8,500.00 | $3,500.00 | $4,800.00 | $6,635.66 |
| 201 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.12 | $625.00 | $665.00 | $630.00 | $470.00 | $625.00 | $470.00 |
| 202 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.19 | $980.00 | $1,275.00 | $980.00 | $1,050.00 | $980.00 | $1,050.00 |
| 203 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 2.94 | $690.00 | $750.00 | $690.00 | $935.00 | $690.00 | $935.00 |
| 204 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 4,642 | $0.80 | $0.55 | $0.80 | $0.70 | $0.80 | $0.70 |
| 205 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 1,256 | $0.80 | $0.45 | $0.80 | $0.60 | $0.80 | $0.60 |
| 206 | Work zone stop line, class III, 642 paint (614E26610) | FT | 396 | $3.75 | $4.00 | $3.80 | $3.95 | $3.75 | $3.95 |
| 207 | Special - maintain existing lighting (625E40000) | LS | 1 | $15,000 | $5,723.00 | $5,400.00 | $5,350.00 | $18,000 | $5,350.00 |
| 208 | Special - work zone traffic signal (614E11300) | EACH | 1 | $20,000 | $20,000 | $26,600 | $26,600 | $25,000 | $26,600 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way