ODOT contract 250288 bid tabulation

WAS-SR 26-18.45 (TWO LANE RESURFACING). Let by Ohio DOT on May 22, 2025, WAS. 1 bid received; low bid $4,844,844 by Shelly & Sands Inc, +5.4% against the engineer's estimate of $4,595,000.

Owner
Ohio DOT
Letting
22 MAY 2025
Pay items
22
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$4,844,844Low+5.0%
ODOT contract 250288: bids by rank

Engineer's estimate: $4,595,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc
1Wearing course removed (202E23500)SY186$5.00
2Preparing subgrade for shoulder paving (209E72050)MI21.82$3,000.00
3Pavement repair (253E02000)CY2,537$340.00
4Pavement planing, asphalt concrete 1.25" (254E01000)SY2,134$5.00
5Tack coat, 702.13 (407E13900)GAL15$3.25
6Non-tracking tack coat (407E20000)GAL18,593$3.25
7Prime coat (408E10000)GAL10,241$4.25
8Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY6,230$250.00
9Asphalt concrete intermediate course, type 2, (448) (441E50300)CY6,953$220.00
10Compacted aggregate (617E10100)CY2,311$105.00
11RPM (621E00100)EACH1,397$37.00
12Raised pavement marker removed (621E54000)EACH1,397$12.00
13Edge line, 6", type 1 (642E00104)MI21.82$970.00
14Center line, type 1 (642E00300)MI10.91$1,200.00
15Stop line (644E00500)FT204$16.00
16Work zone marking sign (614E12460)EACH38$100.00
17Work zone center line, class I, 642 paint (614E21100)MI21.82$1,525.00
18Work zone center line, class II, 642 paint (614E21500)MI21.82$275.00
19Premium for contract performance bond and for payment bond (103E05000)LS1$15,500
20Maintaining traffic (614E11000)LS1$231,350
21Construction layout stakes and surveying, as per plan (623E10001)LS1$10,488
22Mobilization (624E10000)LS1$65,000
ODOT contract 250288: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy