ODOT contract 250296 bid tabulation
D12-TSG FY2025 (SIGNALIZATION). Let by Ohio DOT on May 22, 2025, District 12. 3 bids received; low bid $174,974 by Perram Electric Inc, -24% against the engineer's estimate of $229,000.
- Owner
- Ohio DOT
- Letting
- 22 MAY 2025
- Pay items
- 46
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perram Electric Inc | $174,974 | Low | -24% |
| 2 | Miller Cable Company | $223,923 | +28% | -2.0% |
| 3 | Ruhlin Company | $246,555 | +41% | +8.0% |
Engineer's estimate: $229,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perram Electric Inc | 2. Miller Cable Company | 3. Ruhlin Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100.00 | $100.00 | $10.00 |
| 2 | 4" concrete walk (608E10000) | SF | 32 | $34.15 | $55.00 | $25.00 |
| 3 | Ground mounted support, no. 3 post (630E03100) | FT | 14.50 | $18.70 | $20.00 | $50.00 |
| 4 | Overhead sign support, type TC-12.30, design 6 (630E20600) | EACH | 1 | $20,405 | $29,750 | $30,917 |
| 5 | Sign attachment assembly (630E75000) | EACH | 2 | $645.00 | $725.00 | $830.00 |
| 6 | Sign attachment assembly, mast arm (630E79200) | EACH | 8 | $265.00 | $480.00 | $575.00 |
| 7 | Sign support assembly, pole mounted (630E79500) | EACH | 8 | $200.00 | $195.00 | $245.00 |
| 8 | Sign, flat sheet (630E80100) | SF | 120 | $26.35 | $17.50 | $50.00 |
| 9 | Sign, overhead extrusheet (630E80224) | SF | 56 | $34.75 | $27.50 | $64.00 |
| 10 | Rigid overhead sign support foundation (630E84510) | EACH | 1 | $4,370.00 | $9,825.00 | $11,008 |
| 11 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 2 | $100.00 | $280.00 | $75.00 |
| 12 | Removal of pole mounted sign and disposal (630E87500) | EACH | 8 | $100.00 | $35.00 | $75.00 |
| 13 | Conduit, 2", 725.04 (625E25400) | FT | 25 | $24.20 | $26.00 | $32.00 |
| 14 | Conduit, 3", 725.04 (625E25500) | FT | 25 | $44.20 | $40.00 | $45.00 |
| 15 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 88 | $67.65 | $58.00 | $80.00 |
| 16 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 139 | $75.30 | $74.00 | $90.00 |
| 17 | Trench (625E29000) | FT | 50 | $13.86 | $18.00 | $17.00 |
| 18 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,210.00 | $1,225.00 | $1,621.00 |
| 19 | Pull box, 725.08, 24" (625E30706) | EACH | 4 | $1,410.00 | $1,520.00 | $1,750.00 |
| 20 | Pull box removed (625E31510) | EACH | 4 | $100.00 | $390.00 | $375.00 |
| 21 | Ground rod (625E32000) | EACH | 3 | $320.00 | $275.00 | $325.00 |
| 22 | Power service (625E34000) | EACH | 2 | $2,590.00 | $1,725.00 | $4,100.00 |
| 23 | Underground warning marking tape (625E36010) | FT | 50 | $1.25 | $2.75 | $3.30 |
| 24 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 5 | $1,005.00 | $1,500.00 | $1,460.00 |
| 25 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 2 | $1,840.00 | $2,400.00 | $2,438.00 |
| 26 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $615.00 | $875.00 | $992.00 |
| 27 | Covering of vehicular signal head (632E25000) | EACH | 8 | $20.00 | $25.00 | $75.00 |
| 28 | Covering of pedestrian signal head (632E25010) | EACH | 2 | $20.00 | $25.00 | $75.00 |
| 29 | Pedestrian pushbutton (632E26000) | EACH | 2 | $325.00 | $300.00 | $350.00 |
| 30 | Signal cable, 4 conductor, no. 14 AWG (632E40400) | FT | 421 | $3.65 | $4.00 | $4.00 |
| 31 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 199 | $3.80 | $4.15 | $4.00 |
| 32 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 701 | $4.20 | $4.35 | $5.00 |
| 33 | Signal cable, 9 conductor, no. 14 AWG (632E40900) | FT | 216 | $4.60 | $5.20 | $7.00 |
| 34 | Signal support foundation, as per plan (632E64011) | EACH | 3 | $6,015.00 | $7,000.00 | $9,420.00 |
| 35 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $9,875.00 | $12,100 | $12,075 |
| 36 | Signal support, type TC-81.22, design 13 (632E72140) | EACH | 2 | $16,325 | $19,500 | $18,900 |
| 37 | Removal of traffic signal installation (632E90100) | EACH | 3 | $980.00 | $1,500.00 | $3,690.00 |
| 38 | Reuse of vehicular signal head, as per plan (632E90201) | EACH | 3 | $585.00 | $900.00 | $550.00 |
| 39 | Signalization, misc.: remove and reuse of existing (632E90300) | LS | 1 | $1,985.00 | $1,700.00 | $2,500.00 |
| 40 | Preempt detector cable (809E69220) | FT | 421 | $3.55 | $3.25 | $3.00 |
| 41 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 8 | $90.00 | $75.00 | $135.00 |
| 42 | Portable changeable message sign, as per plan (614E18601) | SNMT | 3 | $1,595.00 | $1,100.00 | $800.00 |
| 43 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,856.45 | $2,000.00 | $1,200.00 |
| 44 | Maintaining traffic (614E11000) | LS | 1 | $4,000.00 | $22,000 | $4,850.00 |
| 45 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,220.00 | $3,800.00 | $3,000.00 |
| 46 | Mobilization (624E10000) | LS | 1 | $4,000.00 | $4,000.00 | $12,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.