| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 1,230 | $16.50 |
| 3 | Wearing course removed (202E23500) | SY | 5,255 | $4.00 |
| 4 | Walk removed (202E30000) | SF | 4,215 | $2.40 |
| 5 | Concrete barrier removed (202E30700) | FT | 1,137 | $20.00 |
| 6 | Curb removed (202E32000) | FT | 683 | $8.00 |
| 7 | Gutter removed (202E32700) | SY | 2 | $250.00 |
| 8 | Pipe removed, 24" and under (202E35100) | FT | 176 | $19.00 |
| 9 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 185 | $45.00 |
| 10 | Guardrail removed (202E38000) | FT | 487.50 | $3.75 |
| 11 | Catch basin removed (202E58100) | EACH | 1 | $845.00 |
| 12 | Removal misc.: asphalt curb (202E98200) | FT | 225 | $10.00 |
| 13 | Excavation (203E10000) | CY | 507 | $40.00 |
| 14 | Embankment (203E20000) | CY | 37 | $20.00 |
| 15 | Subgrade compaction (204E10000) | SY | 1,433 | $8.00 |
| 16 | Ditch cleanout (209E10000) | FT | 255 | $10.00 |
| 17 | Linear grading (209E60200) | STA | 8 | $600.00 |
| 18 | Guardrail, type MGS (606E15050) | FT | 537.50 | $22.50 |
| 19 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,675.00 |
| 20 | Anchor assembly, MGS type T (606E26550) | EACH | 3 | $1,340.00 |
| 21 | MGS bridge terminal assembly, type 1, as per plan (606E35003) | EACH | 1 | $2,835.00 |
| 22 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $535.00 |
| 23 | Impact attenuator, type 2 (bidirectional) (45 MPH/ (606E60028) | EACH | 1 | $26,750 |
| 24 | Fence, type CLT (607E23000) | FT | 420 | $31.00 |
| 25 | Gate, type CLT (607E61200) | EACH | 1 | $2,675.00 |
| 26 | 4" concrete walk (608E10000) | SF | 7,629 | $10.00 |
| 27 | Curb ramp (608E52000) | SF | 1,735 | $30.00 |
| 28 | Curb, type 6 (609E26000) | FT | 2,924 | $50.00 |
| 29 | Curb, type 6, as per plan (609E26001) | FT | 225 | $45.00 |
| 30 | 8" concrete traffic island, as per plan (609E57001) | SY | 113 | $260.00 |
| 31 | Concrete barrier, single slope, type B (622E10060) | FT | 902 | $100.00 |
| 32 | Barrier transition (622E10200) | EACH | 1 | $8,000.00 |
| 33 | Concrete barrier end section, type B (622E24840) | EACH | 1 | $8,000.00 |
| 34 | Concrete barrier, end anchorage, reinforced, type B (622E25004) | EACH | 7 | $4,500.00 |
| 35 | Riprap, type D (601E11000) | SY | 3 | $600.00 |
| 36 | Seeding and mulching, as per plan (659E10001) | SY | 637 | $9.50 |
| 37 | Erosion control (832E30000) | EACH | 7,000 | $1.00 |
| 38 | Concrete, misc.:conduit backfill (511E71100) | CY | 24 | $300.00 |
| 39 | Concrete masonry (602E20000) | CY | 1 | $3,500.00 |
| 40 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 1,117 | $20.00 |
| 41 | 4" conduit, type C (611E00200) | FT | 14 | $36.00 |
| 42 | 12" conduit, type B (611E04400) | FT | 99 | $103.90 |
| 43 | 12" conduit, type C (611E04600) | FT | 21 | $141.10 |
| 44 | 15" conduit, type A (611E05700) | FT | 123 | $192.10 |
| 45 | 15" conduit, type B (611E05900) | FT | 85 | $130.60 |
| 46 | 18" conduit, type A (611E07200) | FT | 62 | $196.90 |
| 47 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $3,000.00 |
| 48 | Catch basin adjusted to grade (611E98630) | EACH | 12 | $1,000.00 |
| 49 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 11 | $4,000.00 |
| 50 | Inlet, no. 3 for single slope barrier, type B (611E99094) | EACH | 3 | $12,000 |
| 51 | Inlet adjusted to grade (611E99150) | EACH | 1 | $800.00 |
| 52 | Manhole, no. 3, as per plan (611E99575) | EACH | 1 | $4,500.00 |
| 53 | Manhole adjusted to grade (611E99654) | EACH | 18 | $1,000.00 |
| 54 | Full depth pavement sawing (252E01500) | FT | 5,181 | $4.30 |
| 55 | Pavement repair (253E02000) | CY | 360 | $435.00 |
| 56 | Pavement planing, asphalt concrete, 0.5" avg (254E01000) | SY | 25,906 | $1.50 |
| 57 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 25,905 | $3.60 |
| 58 | Pavement planing, asphalt concrete, 2" (254E01000) | SY | 6,137 | $3.60 |
| 59 | Pavement planing, asphalt concrete, 3.25" (254E01000) | SY | 10,434 | $4.25 |
| 60 | Pavement planing, asphalt concrete, 3.75" (254E01000) | SY | 22,431 | $4.25 |
| 61 | Pavement planing, asphalt concrete, as per plan, 3 (254E01001) | SY | 1,125 | $4.25 |
| 62 | Pavement planing, portland cement concrete, 1.5" M (254E01010) | SY | 1,478 | $5.70 |
| 63 | Patching planed surface (254E01600) | SY | 571 | $10.00 |
| 64 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 250 | $214.10 |
| 65 | Aggregate base (304E20000) | CY | 521 | $170.00 |
| 66 | Non-tracking tack coat (407E20000) | GAL | 13,171 | $3.50 |
| 67 | Prime coat (408E10000) | GAL | 2,121 | $5.00 |
| 68 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 22 | $700.00 |
| 69 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 5,033 | $190.00 |
| 70 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 4,583 | $265.00 |
| 71 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 359 | $260.00 |
| 72 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 9 | $800.00 |
| 73 | Asphalt concrete intermediate course, 19 MM, type A (449) (442E22400) | CY | 1 | $800.00 |
| 74 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 620 | $110.00 |
| 75 | 10" non-reinforced concrete pavement, class QC MS (452E14050) | SY | 85 | $230.00 |
| 76 | Compacted aggregate (617E10100) | CY | 552 | $100.00 |
| 77 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 3.08 | $5,000.00 |
| 78 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 1.54 | $3,700.00 |
| 79 | Longitudinal joint preparation (874E21000) | MI | 1.54 | $10,360 |
| 80 | Valve box adjusted to grade (638E10800) | EACH | 13 | $750.00 |
| 81 | RPM (621E00100) | EACH | 403 | $37.00 |
| 82 | Raised pavement marker removed (621E54000) | EACH | 403 | $9.00 |
| 83 | Ground mounted support, no. 3 post (630E03100) | FT | 14 | $21.50 |
| 84 | Sign, flat sheet (630E80100) | SF | 6.25 | $26.80 |
| 85 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $21.40 |
| 86 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $110.00 |
| 87 | Removal of structure mounted sign and reerection, as per plan (630E86321) | EACH | 1 | $620.00 |
| 88 | Signing, misc.:solar powered RRFB (630E97700) | EACH | 2 | $11,775 |
| 89 | Edge line, 6", type 1 (642E00104) | MI | 0.72 | $6,500.00 |
| 90 | Lane line, 6", type 1 (642E00204) | MI | 0.36 | $3,200.00 |
| 91 | Edge line, 6" (644E00104) | MI | 8.44 | $4,800.00 |
| 92 | Lane line, 6" (644E00204) | MI | 0.38 | $2,350.00 |
| 93 | Center line (644E00300) | MI | 5.15 | $5,600.00 |
| 94 | Channelizing line, 8" (644E00400) | FT | 200 | $2.60 |
| 95 | Channelizing line, 12" (644E00404) | FT | 561 | $3.00 |
| 96 | Stop line (644E00500) | FT | 579 | $9.75 |
| 97 | Crosswalk line, 12" (644E00620) | FT | 308 | $4.85 |
| 98 | Crosswalk line, 24" (644E00630) | FT | 155 | $9.65 |
| 99 | Transverse/diagonal line (644E00700) | FT | 981 | $9.65 |
| 100 | Island marking (644E00900) | SF | 112 | $3.55 |
| 101 | Lane arrow (644E01300) | EACH | 6 | $120.00 |
| 102 | Work zone marking sign (614E12460) | EACH | 84 | $100.00 |
| 103 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 0.99 | $1,875.00 |
| 104 | Work zone lane line, class II, 4", 642 paint (614E20500) | MI | 1.17 | $500.00 |
| 105 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.39 | $2,400.00 |
| 106 | Work zone center line, class I, 642 paint (614E21100) | MI | 10.32 | $1,600.00 |
| 107 | Work zone center line, class II, 642 paint (614E21500) | MI | 12.26 | $300.00 |
| 108 | Work zone center line, class III, 642 paint (614E21550) | MI | 9.86 | $1,100.00 |
| 109 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 3.49 | $1,525.00 |
| 110 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 1.66 | $8,185.00 |
| 111 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.86 | $1,952.00 |
| 112 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 2,184 | $1.10 |
| 113 | Work zone dotted line, class I, 4", 740.06, type I (614E24400) | FT | 4,845 | $0.75 |
| 114 | Work zone stop line, class III, 642 paint (614E26610) | FT | 239 | $7.50 |
| 115 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 |
| 116 | Maintaining traffic (614E11000) | LS | 1 | $248,900 |
| 117 | Construction layout stakes and surveying (623E10000) | LS | 1 | $21,130 |
| 118 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $12,500 |
| 119 | Mobilization (624E10000) | LS | 1 | $225,000 |