ODOT contract 250298 bid tabulation
ROS-Tar Hollow SF Culverts FY25 (CULVERT REPLACEMENT). Let by Ohio DOT on May 22, 2025, ROS. 5 bids received; low bid $193,222 by Parker Corporation, -18% against the engineer's estimate of $235,000.
- Owner
- Ohio DOT
- Letting
- 22 MAY 2025
- Pay items
- 25
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Parker Corporation | $193,222 | Low | -18% |
| 2 | Fillmore Construction | $194,816 | +1.0% | -17% |
| 3 | Heavy Highway Construction Company LLC | $215,157 | +11% | -8.0% |
| 4 | D G M Inc | $243,210 | +26% | +3.0% |
| 5 | Axis Civil Construction LLC | $356,390 | +84% | +52% |
Engineer's estimate: $235,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parker Corporation | 2. Fillmore Construction | 3. Heavy Highway Construction Company LLC | 4. D G M Inc | 5. Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 | $2,500.00 | $15,000 | $20,000 | $8,000.00 |
| 2 | Headwall removed (202E20010) | EACH | 14 | $500.00 | $1,000.00 | $700.00 | $300.00 | $400.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 480 | $20.00 | $10.00 | $15.00 | $10.00 | $20.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 200 | $30.00 | $15.00 | $20.00 | $15.00 | $50.00 |
| 5 | Granular embankment (203E35000) | CY | 19 | $100.00 | $100.00 | $65.00 | $100.00 | $145.00 |
| 6 | Subgrade compaction (204E10000) | SY | 115 | $0.50 | $5.00 | $25.00 | $15.00 | $10.00 |
| 7 | Aggregate base (304E20000) | CY | 32 | $100.00 | $100.00 | $55.00 | $125.00 | $120.00 |
| 8 | Unclassified excavation, including rock (503E21104) | CY | 43 | $50.00 | $100.00 | $75.00 | $100.00 | $125.00 |
| 9 | Seeding and mulching (659E10000) | SY | 510 | $2.00 | $3.00 | $6.50 | $12.00 | $4.00 |
| 10 | Repair seeding and mulching (659E14000) | SY | 51 | $0.05 | $3.00 | $6.50 | $0.05 | $4.00 |
| 11 | Commercial fertilizer (659E20000) | TON | 0.06 | $4,167.00 | $1,000.00 | $1,200.00 | $2,000.00 | $1,377.00 |
| 12 | Lime (659E31000) | ACRE | 0.11 | $2,273.00 | $1,000.00 | $155.00 | $500.00 | $1,200.00 |
| 13 | Water (659E35000) | MGAL | 2.80 | $0.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Erosion control (832E30000) | EACH | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | Rock channel protection, type C with filter (601E32200) | CY | 6.20 | $100.00 | $500.00 | $400.00 | $300.00 | $250.00 |
| 16 | Rock channel protection, type D with filter (601E32300) | CY | 52.70 | $100.00 | $300.00 | $90.00 | $250.00 | $170.00 |
| 17 | Concrete masonry, as per plan (602E20001) | CY | 20 | $1,800.00 | $1,500.00 | $1,800.00 | $2,000.00 | $4,200.00 |
| 18 | 18" conduit, type A, as per plan, 707.33 (611E07201) | FT | 320 | $100.00 | $100.00 | $70.00 | $90.00 | $110.00 |
| 19 | 24" conduit, type A, as per plan (611E10201) | FT | 160 | $130.00 | $120.00 | $90.00 | $110.00 | $410.00 |
| 20 | 30" conduit, type A, as per plan, 707.33 (611E13201) | FT | 170 | $160.00 | $140.00 | $120.00 | $125.00 | $325.00 |
| 21 | Delineator, post ground mounted (620E00500) | EACH | 19 | $100.00 | $225.00 | $100.00 | $200.00 | $250.00 |
| 22 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,500.00 | $6,500.00 | $20,500 | $20,000 | $2,800.00 |
| 23 | Maintaining traffic (614E11000) | LS | 1 | $6,000.00 | $6,500.00 | $4,000.00 | $20,000 | $12,500 |
| 24 | Construction layout stakes and surveying (623E10000) | LS | 1 | $6,000.00 | $5,000.00 | $17,000 | $4,000.00 | $4,500.00 |
| 25 | Mobilization (624E10000) | LS | 1 | $13,000 | $10,000 | $20,000 | $20,000 | $30,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.