| 1 | Guardrail removed, as per plan (202E38001) | FT | 15,175 | $2.00 | $2.00 | $1.80 |
| 2 | Anchor assembly removed, type E, as per plan (202E42011) | EACH | 17 | $150.00 | $150.00 | $100.00 |
| 3 | Impact attenuator removed, as per plan (202E47801) | EACH | 5 | $220.00 | $220.00 | $250.00 |
| 4 | Embankment, as per plan (203E20001) | CY | 352 | $68.75 | $68.75 | $1.00 |
| 5 | Linear grading (209E60200) | STA | 162.60 | $50.00 | $50.00 | $125.00 |
| 6 | Linear grading (209E60500) | MI | 3.24 | $1,600.00 | $1,500.00 | $5,050.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 14,162.50 | $19.60 | $19.60 | $19.50 |
| 8 | Guardrail, barrier design, type MGS (606E15550) | FT | 200 | $34.40 | $34.40 | $35.00 |
| 9 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,470.00 | $2,470.00 | $2,450.00 |
| 10 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 16 | $2,395.00 | $2,395.00 | $2,450.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 16 | $1,320.00 | $1,320.00 | $1,200.00 |
| 12 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 23 | $2,550.00 | $2,550.00 | $2,600.00 |
| 13 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 13 | $525.00 | $525.00 | $500.00 |
| 14 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 5 | $8,950.00 | $8,950.00 | $8,000.00 |
| 15 | Guardrail, misc.: alternative guardrail placement (606E98000) | FT | 200 | $9.20 | $9.20 | $10.00 |
| 16 | Topsoil (659E00300) | CY | 200 | $89.00 | $25.00 | $20.00 |
| 17 | Seeding and mulching (659E10000) | SY | 1,807 | $3.25 | $2.00 | $2.00 |
| 18 | Repair seeding and mulching (659E14000) | SY | 90 | $1.40 | $2.00 | $2.00 |
| 19 | Inter-seeding (659E15000) | SY | 90 | $0.10 | $2.00 | $2.00 |
| 20 | Commercial fertilizer (659E20000) | TON | 0.24 | $575.00 | $1,250.00 | $1,250.00 |
| 21 | Lime (659E31000) | ACRE | 0.37 | $25.00 | $150.00 | $150.00 |
| 22 | Water (659E35000) | MGAL | 10 | $1.00 | $10.00 | $1.00 |
| 23 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 24 | Catch basin adjusted to grade (611E98630) | EACH | 4 | $1,000.00 | $1,000.00 | $2,350.00 |
| 25 | Manhole adjusted to grade (611E99654) | EACH | 4 | $1,000.00 | $500.00 | $2,550.00 |
| 26 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 4,047 | $39.25 | $58.00 | $80.00 |
| 27 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 3,118 | $49.50 | $80.00 | $90.00 |
| 28 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 261,379 | $2.85 | $2.60 | $3.60 |
| 29 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 56,679 | $2.35 | $2.60 | $3.60 |
| 30 | Non-tracking tack coat (407E20000) | GAL | 27,035 | $3.90 | $2.75 | $3.50 |
| 31 | Anti-segregation equipment (442E00100) | CY | 10,373 | $14.00 | $0.50 | $12.00 |
| 32 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 11,291 | $230.00 | $263.00 | $260.00 |
| 33 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 1,965 | $278.00 | $358.00 | $305.00 |
| 34 | Compacted aggregate (617E10100) | CY | 214 | $120.00 | $40.00 | $185.00 |
| 35 | Shoulder preparation (617E20000) | SY | 3,833 | $1.45 | $0.75 | $6.00 |
| 36 | Water (617E25000) | MGAL | 8 | $1.00 | $10.00 | $200.00 |
| 37 | Void reducing asphalt membrane (vram) (872E10000) | FT | 67,153 | $5.00 | $2.00 | $2.50 |
| 38 | Delineator, misc.: diamond grade linear delineatio (620E70000) | EACH | 499 | $35.00 | $38.15 | $85.00 |
| 39 | RPM (621E00100) | EACH | 1,517 | $41.50 | $35.00 | $35.00 |
| 40 | Raised pavement marker removed (621E54000) | EACH | 1,517 | $5.50 | $1.00 | $10.00 |
| 41 | Barrier reflector, type 1, 1-way (626E00102) | EACH | 80 | $11.10 | $11.64 | $12.00 |
| 42 | Barrier reflector, type 2, 1-way (626E00110) | EACH | 216 | $12.00 | $11.64 | $12.00 |
| 43 | Detector loop, as per plan (632E26501) | EACH | 4 | $2,200.00 | $2,200.00 | $2,450.00 |
| 44 | Loop detector tie in (632E27200) | EACH | 4 | $100.00 | $100.00 | $125.00 |
| 45 | Stop line (644E00500) | FT | 39 | $9.00 | $9.00 | $9.00 |
| 46 | Crosswalk line, 12" (644E00620) | FT | 96 | $6.50 | $6.50 | $6.50 |
| 47 | Chevron marking (644E00720) | FT | 977 | $9.50 | $9.50 | $9.50 |
| 48 | Lane arrow (644E01300) | EACH | 4 | $125.00 | $125.00 | $125.00 |
| 49 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 1.41 | $7,150.00 | $7,150.00 | $7,150.00 |
| 50 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 1.51 | $3,550.00 | $3,550.00 | $3,550.00 |
| 51 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 1,136 | $3.50 | $3.50 | $3.50 |
| 52 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 1,031 | $2.00 | $2.00 | $2.00 |
| 53 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 20.27 | $4,450.00 | $4,450.00 | $4,450.00 |
| 54 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 17.05 | $1,828.00 | $1,828.00 | $1,828.00 |
| 55 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 13,565 | $2.25 | $2.25 | $2.25 |
| 56 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 11,058 | $0.85 | $0.85 | $0.85 |
| 57 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 37.32 | $1,450.00 | $1,450.00 | $1,450.00 |
| 58 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 10,591 | $1.00 | $1.00 | $1.00 |
| 59 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 13,565 | $1.50 | $1.50 | $1.50 |
| 60 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 2.92 | $2,190.00 | $2,190.00 | $2,190.00 |
| 61 | Grooving for 6" recessed pavement marking, (concrete) (850E20110) | FT | 1,031 | $1.50 | $1.50 | $1.50 |
| 62 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 1,136 | $1.85 | $1.85 | $1.85 |
| 63 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,200 | $80.00 | $125.00 | $85.00 |
| 64 | Detour signing, as per plan (614E12421) | LS | 1 | $25,000 | $1,500.00 | $20,740 |
| 65 | Work zone marking sign (614E12460) | EACH | 36 | $125.00 | $225.00 | $125.00 |
| 66 | Portable changeable message sign, as per plan (614E18601) | SNMT | 20 | $900.00 | $650.00 | $650.00 |
| 67 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 18.56 | $610.00 | $610.00 | $495.00 |
| 68 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 21.68 | $785.00 | $785.00 | $960.00 |
| 69 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 14,636 | $0.80 | $0.80 | $0.60 |
| 70 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 11,622 | $0.75 | $0.75 | $0.40 |
| 71 | Work zone stop line, class III, 642 paint (614E26610) | FT | 39 | $3.00 | $3.00 | $2.70 |
| 72 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 4 | $75.00 | $75.00 | $120.00 |
| 73 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 40 | $650.00 | $475.00 | $475.00 |
| 74 | Portable non-intrusive traffic sensor, class II (896E00012) | SNMT | 20 | $1,200.00 | $1,000.00 | $745.00 |
| 75 | Portable changeable message sign (896E00020) | SNMT | 10 | $1,800.00 | $650.00 | $730.00 |
| 76 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,956 | $18.50 | $20.00 | $18.50 |
| 77 | Removal of existing pavement marking (512E74500) | FT | 1,452 | $1.25 | $1.25 | $1.25 |
| 78 | Patching concrete bridge deck - type B (519E12300) | SY | 24 | $950.00 | $175.00 | $950.00 |
| 79 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 4,022 | $18.50 | $20.00 | $18.50 |
| 80 | Removal of existing pavement marking (512E74500) | FT | 3,110 | $1.25 | $1.25 | $1.25 |
| 81 | Patching concrete bridge deck - type B (519E12300) | SY | 24 | $950.00 | $175.00 | $950.00 |
| 82 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,655 | $18.50 | $20.00 | $18.50 |
| 83 | Removal of existing pavement marking (512E74500) | FT | 1,729 | $1.25 | $1.25 | $1.25 |
| 84 | Patching concrete bridge deck - type B (519E12300) | SY | 24 | $950.00 | $175.00 | $950.00 |
| 85 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 2,250 | $18.50 | $20.00 | $18.50 |
| 86 | Removal of existing pavement marking (512E74500) | FT | 1,376 | $1.25 | $1.25 | $1.25 |
| 87 | Patching concrete bridge deck - type B (519E12300) | SY | 12 | $950.00 | $225.00 | $950.00 |
| 88 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 2,648 | $18.50 | $20.00 | $18.50 |
| 89 | Removal of existing pavement marking (512E74500) | FT | 1,720 | $1.25 | $1.25 | $1.25 |
| 90 | Patching concrete bridge deck - type B (519E12300) | SY | 12 | $1,100.00 | $225.00 | $1,100.00 |
| 91 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 2,933 | $18.50 | $20.00 | $18.50 |
| 92 | Removal of existing pavement marking (512E74500) | FT | 1,891 | $1.25 | $1.25 | $1.25 |
| 93 | Patching concrete bridge deck - type B (519E12300) | SY | 12 | $1,100.00 | $225.00 | $1,100.00 |
| 94 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 2,379 | $18.50 | $20.00 | $18.50 |
| 95 | Removal of existing pavement marking (512E74500) | FT | 1,376 | $1.25 | $1.25 | $1.25 |
| 96 | Patching concrete bridge deck - type B (519E12300) | SY | 12 | $1,100.00 | $225.00 | $1,100.00 |
| 97 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,858 | $18.50 | $20.00 | $18.50 |
| 98 | Removal of existing pavement marking (512E74500) | FT | 2,352 | $1.25 | $1.25 | $1.25 |
| 99 | Patching concrete bridge deck - type B (519E12300) | SY | 24 | $950.00 | $175.00 | $950.00 |
| 100 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $18,000 | $35,906 |
| 101 | Maintaining traffic (614E11000) | LS | 1 | $320,500 | $406,148 | $479,951 |
| 102 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,000.00 | $8,400.00 | $6,000.00 |
| 103 | Mobilization (624E10000) | LS | 1 | $335,000 | $360,000 | $200,000 |