ODOT letting results, August 10, 2023
17 contracts let by Ohio DOT on August 10, 2023, $31,863,074 in low bids, a median of 3 bidders per contract. On the 17 with an engineer's estimate, the low bid came in under it 8 times; median low bid +2.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 17
- Low bids, total
- $31,863,074
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230407 | WAR-SR 73-14.58/14.62 (BRIDGE REPLACEMENT (1 BRIDGE)) | WAR | 5 | Double Z Construction Company | $4,099,409 | $4,105,993 | 0.0% | +10% | ODOT |
| 230404 | MED-SR 18-01.72/01.93/02.42 (BRIDGE REPLACEMENT (3 BRIDGES)) | MED | 5 | J D Williamson Construction Co Inc | $4,023,006 | $4,031,445 | 0.0% | -5.0% | ODOT |
| 230420 | PRE-US 35-01.76 (BRIDGE REPAIR) | PRE | 2 | Eagle Bridge Co | $2,895,873 | $2,928,317 | +1.0% | +10% | ODOT |
| 230414 | DEL-US 23-08.96 (CULVERT REPLACEMENT) | DEL | 2 | Shelly & Sands Inc | $2,880,300 | $3,047,511 | +6.0% | +49% | ODOT |
| 230417 | LAK-SR 306-04.33 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | LAK | 2 | J D Williamson Construction Co Inc | $2,819,676 | $3,717,289 | +32% | -6.0% | ODOT |
| 234019 | FAI-SR 159-07.90 (BRIDGE REPLACEMENT (1 BRIDGE)) | FAI | 1 | Axis Civil Construction LLC | $2,553,174 | +25% | ODOT | ||
| 230418 | MER-US 33-10.42 (TWO LANE RESURFACING) | MER | 1 | Shelly Company | $2,528,054 | +18% | ODOT | ||
| 230416 | HUR-SR 303-00.00 (TWO LANE RESURFACING) | HUR | 3 | Erie Blacktop Inc | $2,080,255 | $2,162,267 | +4.0% | -9.0% | ODOT |
| 230424 | D07-/D08 GR FY2024 (GUARDRAIL REBUILDING) | District 7 | 1 | Lake Erie Construction Company | $1,748,880 | -4.0% | ODOT | ||
| 238006 | MOE-SR 7-07.51 (SLIDE REPAIR) | MOE | 3 | Shelly & Sands Inc | $1,526,055 | $1,673,674 | +10% | +3.0% | ODOT |
| 230421 | TUS-IR 77-07.12 (CULVERT REPLACEMENT) | TUS | 3 | Ohio-West Virginia Excavating Co | $1,489,238 | $1,897,421 | +27% | +2.0% | ODOT |
| 230412 | BEL-SR 7-14.49 (CULVERT REPLACEMENT) | BEL | 3 | Ohio-West Virginia Excavating Co | $1,429,386 | $1,472,054 | +3.0% | -33% | ODOT |
| 230423 | D02-GR FY2024 (GUARDRAIL REBUILDING) | District 2 | 1 | Lake Erie Construction Company | $1,042,220 | -7.0% | ODOT | ||
| 230415 | HAN-US 224-17.67 Signal (SIGNALIZATION) | HAN | 4 | Miller Cable Company | $252,300 | $252,961 | 0.0% | -2.0% | ODOT |
| 238007 | LOR-SR 2-06.49 (BRIDGE REPAIR) | LOR | 3 | Ruhlin Company | $197,180 | $217,669 | +10% | +11% | ODOT |
| 238008 | ROS-Tar Hollow Rd (CULVERT REPLACEMENT) | ROS | 3 | D G M Inc | $154,752 | $176,946 | +14% | +12% | ODOT |
| 230426 | LUC-/OTT-IR 280/SR 65/SR 163-FY24 Elec Mnt (BRIDGE REPAIR) | LUC | 2 | U S Utility Electrical Services Corp | $143,316 | $149,764 | +4.0% | -17% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.