Bansal Construction Inc: ODOT bid record

Bansal Construction Inc submitted 42 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 17 SEP 2026, and was the low bidder on 21 of them (50%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$18,014,890
Latest bid
17 SEP 2026
Data through
12 NOV 2026
42Bids
21Low bids
50Win rate, percent
+9.0%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20209556%
202111327%
20227343%
202344100%
20244250%
20254375%
20263133%
Bansal Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 812758%
HAM10330%
MOT7457%
WAR5240%
BUT33100%
CLE3267%
CLI100%
GRE100%
Bansal Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Signal cable, 7 conductor, no. 14 AWG632E40700FT2421 (88%)$2.42$3.25
Erosion control832E30000EACH1818 (100%)$1.00$1.00
Signal cable, 5 conductor, no. 14 AWG632E40500FT1916 (84%)$2.15$2.95
Law enforcement officer with patrol car for assistance614E11110HR3015 (50%)$75.00$80.00
Stop line644E00500FT1815 (83%)$8.40$8.29
Pull box, 725.08, 24"625E30706EACH2414 (58%)$1,130.00$1,229.10
Ground mounted support, no. 3 post630E03100FT2113 (62%)$15.18$15.20
Pull box, 725.08, 18"625E30700EACH1613 (81%)$877.50$1,000.00
Cabinet foundation, as per plan633E67101EACH1312 (92%)$1,500.00$2,635.50
Conduit, 4", 725.051625E25604FT1312 (92%)$10.65$17.50
Signal support foundation632E64010EACH1811 (61%)$5,337.50$6,025.50
Removal of pavement marking644E30000FT1411 (79%)$5.00$5.00
Bansal Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Complete General Construction Company3017 of 30
Miller Cable Company188 of 18
Capital Electric Line Builders Inc187 of 18
Perram Electric Inc137 of 13
Elex Inc53 of 5
Security Fence Group Inc53 of 5
J Ranck Electric Inc40 of 4
Asplundh Construction LLC43 of 4
Gudenkauf Corporation20 of 2
M P Dory Co20 of 2
Bansal Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
17 SEP 2026260404District 8D08-LED LG FY2027 (LIGHTING)2 of 5$2,804,355+22%
09 APR 2026260180MOTMOT-CR 74-08.40 (SIGNALIZATION)3 of 4$868,996+6.0%
26 MAR 2026260165MOTMOT-SR 725/Jamaica TSG (SIGNALIZATION)1 of 6$199,365Low, 1.0% under the second
17 JUL 2025250353District 8D08-ITS Maint FY2026 (SIGNALIZATION)1 of 2$1,300,989Low, 26% under the second
27 MAR 2025250154BUTBUT-Maple Ave NS (RR CROSSING PROTECTION (RRP))1 of 1$394,776Low
27 MAR 2025250175District 8D08-LG LED FY25 (LIGHTING)6 of 6$1,019,754+131%
27 FEB 2025250135WARWAR-S River & S Main NS (RR CROSSING PROTECTION (RRP))1 of 3$624,129Low, 12% under the second
19 DEC 2024240572CLECLE-LMST Crossing Signal (SIGNALIZATION)1 of 2$315,939Low, 8.0% under the second
19 DEC 2024240583HAMHAM-VAR Sharonville Signals (SIGNALIZATION)3 of 4$908,142+9.0%
17 OCT 2024240465HAMHAM-CR 358-04.36 (MISCELLANEOUS)3 of 4$232,531+5.0%
23 MAY 2024240304District 8D08-TSG-SIGNALS W R/W (SIGNALIZATION)1 of 2$1,574,824Low, 6.0% under the second
27 JUL 2023230394BUTBUT-Augspurger Rd NS (RR CROSSING PROTECTION (RRP))1 of 2$400,947Low, 7.0% under the second
08 JUN 2023230362MOTMOT-IR 75-22.92 (SIGNALIZATION)1 of 6$288,388Low, 1.0% under the second
11 MAY 2023230311District 8D08-ITS Maint FY 2023 (SIGNALIZATION)1 of 1$791,646Low
30 MAR 2023230201District 8D08-TSG-FY2023/FY2024 (SIGNALIZATION)1 of 2$1,938,761Low, 9.0% under the second
13 OCT 2022220544CLECLE-SR 125-01.47 (INTERSECTION)1 of 5$279,754Low, 2.0% under the second
29 SEP 2022220516HAMHAM-CR 457-01.52 (INTERSECTION)1 of 4$496,196Low, 4.0% under the second
16 JUN 2022220350MOTMOT-IR 75-VAR (SIGNALIZATION)2 of 4$2,248,287+19%
26 MAY 2022220341District 8D08-TSG-FY2022 (SIGNALIZATION)2 of 3$1,256,150+1.0%
28 APR 2022223004District 8D08-CLE/HAM ITS Interconnect (SIGNALIZATION)1 of 3$1,149,457Low, 0.0% under the second
10 MAR 2022220142HAMHAM-Springdale Signal Upgrades (SIGNALIZATION)3 of 3$730,256+5.0%
13 JAN 2022220011HAMHAM-Eastern Corridor VAR TSG (SIGNALIZATION)2 of 2$394,526+17%
16 DEC 2021210660HAMHAM-E. Sharon Rd NS (SIGNALIZATION)3 of 3$366,024+5.0%
02 DEC 2021210611MOTMOT-Woodman-Burkhardt Signal (SIGNALIZATION)4 of 5$469,460+11%
02 DEC 2021210632GREGRE-SR 235-03.79 (SIGNALIZATION)6 of 6$288,486+17%
Bansal Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy