ODOT contract 250135 bid tabulation
WAR-S River & S Main NS (RR CROSSING PROTECTION (RRP)). Let by Ohio DOT on February 27, 2025, WAR. 3 bids received; low bid $624,129 by Bansal Construction Inc, +3.0% against the engineer's estimate of $606,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 82
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bansal Construction Inc | $624,129 | Low | +3.0% |
| 2 | Complete General Construction Company | $696,472 | +12% | +15% |
| 3 | Sunesis Construction Co | $801,924 | +28% | +32% |
Engineer's estimate: $606,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bansal Construction Inc | 2. Complete General Construction Company | 3. Sunesis Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,500.00 | $3,000.00 | $2,577.90 |
| 2 | Pavement removed (202E23000) | SY | 7 | $205.00 | $75.00 | $344.82 |
| 3 | Walk removed (202E30000) | SF | 832 | $9.25 | $10.00 | $4.17 |
| 4 | Curb removed (202E32000) | FT | 83 | $28.00 | $10.00 | $28.71 |
| 5 | Curb removed, as per plan (202E32001) | FT | 2 | $300.00 | $95.00 | $316.45 |
| 6 | Excavation (203E10000) | CY | 5 | $275.00 | $1,250.00 | $574.79 |
| 7 | Embankment (203E20000) | CY | 5 | $200.00 | $90.00 | $359.99 |
| 8 | 4" concrete walk (608E10000) | SF | 399 | $12.25 | $14.25 | $50.66 |
| 9 | Curb ramp, as per plan (608E52001) | SF | 515 | $33.25 | $17.00 | $65.01 |
| 10 | Detectable warning (608E53020) | SF | 10 | $125.00 | $78.00 | $821.47 |
| 11 | Crushed aggregate slope protection, as per plan (601E20001) | SY | 9 | $165.00 | $97.00 | $290.46 |
| 12 | Topsoil (659E00300) | CY | 4 | $200.00 | $84.00 | $876.04 |
| 13 | Seeding and mulching (659E10000) | SY | 30 | $50.00 | $49.50 | $78.43 |
| 14 | Repair seeding and mulching (659E14000) | SY | 2 | $45.00 | $15.00 | $50.00 |
| 15 | Inter-seeding (659E15000) | SY | 2 | $45.00 | $1.00 | $50.00 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.01 | $550.00 | $1,500.00 | $10,000 |
| 17 | Lime (659E31000) | ACRE | 0.01 | $75.00 | $200.00 | $10,000 |
| 18 | Water (659E35000) | MGAL | 1 | $245.00 | $1.00 | $100.00 |
| 19 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 20 | 4" non-reinforced concrete pavement, class QC 1P (452E09010) | SY | 5 | $185.00 | $450.00 | $718.04 |
| 21 | Curb, type 4-C (609E24510) | FT | 54 | $40.00 | $85.00 | $241.03 |
| 22 | Curb, type 6 (609E26000) | FT | 20 | $40.00 | $103.00 | $461.31 |
| 23 | Ground mounted support, no. 3 post (630E03100) | FT | 53 | $23.14 | $35.00 | $23.14 |
| 24 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 7 | $440.97 | $343.56 | $440.97 |
| 25 | Sign, flat sheet (630E80100) | SF | 35 | $25.20 | $39.00 | $25.20 |
| 26 | Removal of ground mounted sign and disposal (630E84900) | EACH | 18 | $16.55 | $15.00 | $16.55 |
| 27 | Removal of ground mounted post support and disposal (630E86002) | EACH | 10 | $22.07 | $20.00 | $22.07 |
| 28 | Internally illuminated fixed message sign, as per plan (631E90501) | EACH | 7 | $2,800.00 | $3,100.00 | $2,919.20 |
| 29 | Removal of pavement marking (642E30000) | FT | 873 | $2.35 | $2.35 | $4.88 |
| 30 | Removal of pavement marking (642E30020) | EACH | 5 | $255.00 | $150.00 | $255.00 |
| 31 | Edge line, 4" (644E00100) | MI | 0.01 | $7,610.00 | $10,000 | $7,610.00 |
| 32 | Edge line, 6" (644E00104) | MI | 0.03 | $9,555.00 | $7,500.00 | $9,555.00 |
| 33 | Center line (644E00300) | MI | 0.13 | $11,595 | $10,000 | $28,278 |
| 34 | Stop line (644E00500) | FT | 63 | $7.50 | $8.00 | $7.50 |
| 35 | Crosswalk line, 12" (644E00620) | FT | 345 | $6.50 | $4.00 | $6.50 |
| 36 | Railroad symbol marking (644E01000) | EACH | 2 | $450.00 | $751.00 | $450.00 |
| 37 | Lane arrow (644E01300) | EACH | 4 | $175.00 | $334.00 | $175.00 |
| 38 | Dotted line, 6" (644E01510) | FT | 114 | $2.50 | $2.50 | $2.50 |
| 39 | 4" conduit, type E (611E00400) | FT | 100 | $12.15 | $16.50 | $12.67 |
| 40 | Conduit, 4", 725.051 (625E25604) | FT | 113 | $12.15 | $28.00 | $12.67 |
| 41 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 275 | $95.00 | $205.00 | $99.04 |
| 42 | Trench (625E29000) | FT | 82 | $12.50 | $15.00 | $13.03 |
| 43 | Pull box, 725.08, 24" (625E30706) | EACH | 8 | $1,450.00 | $1,650.00 | $1,511.73 |
| 44 | Ground rod (625E32000) | EACH | 9 | $485.00 | $350.00 | $505.65 |
| 45 | Underground warning marking tape (625E36010) | FT | 82 | $1.70 | $2.00 | $1.77 |
| 46 | Arc flash calculations and label - (signal control (625E76000) | EACH | 2 | $600.00 | $2,300.00 | $625.55 |
| 47 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 11 | $1,225.00 | $1,000.00 | $1,277.15 |
| 48 | Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064) | EACH | 2 | $1,530.00 | $1,225.00 | $1,595.14 |
| 49 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 11 | $615.00 | $825.00 | $641.18 |
| 50 | Accessible pedestrian pushbutton (632E20750) | EACH | 6 | $990.00 | $1,225.00 | $1,032.15 |
| 51 | Covering of vehicular signal head (632E25000) | EACH | 14 | $80.00 | $40.00 | $83.41 |
| 52 | Covering of pedestrian signal head (632E25010) | EACH | 12 | $80.00 | $35.00 | $83.41 |
| 53 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,873 | $2.30 | $2.75 | $2.40 |
| 54 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,595 | $2.55 | $3.25 | $2.66 |
| 55 | Signal support foundation (632E64010) | EACH | 4 | $7,350.00 | $9,800.00 | $7,662.90 |
| 56 | Pedestal foundation (632E64020) | EACH | 4 | $1,465.00 | $1,950.00 | $1,527.37 |
| 57 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 893 | $2.05 | $2.50 | $2.14 |
| 58 | Power cable, 2 conductor, no. 4 AWG (632E69200) | FT | 59 | $5.50 | $6.75 | $5.73 |
| 59 | Service cable, 3 conductor, no. 4 AWG (632E69900) | FT | 180 | $8.25 | $7.50 | $8.60 |
| 60 | Power service (632E70000) | EACH | 2 | $5,975.00 | $3,000.00 | $6,229.36 |
| 61 | Signal support, type TC-12.31, design 6, as per plan (632E71101) | EACH | 2 | $25,360 | $25,000 | $375.33 |
| 63 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 4 | $15,500 | $18,750 | $521.29 |
| 64 | Pedestal, 11', transformer base, as per plan (632E90001) | EACH | 5 | $1,295.00 | $2,000.00 | $1,350.13 |
| 65 | Removal of traffic signal installation (632E90100) | EACH | 1 | $4,925.00 | $3,300.00 | $5,134.66 |
| 66 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 2 | $21,850 | $21,000 | $22,780 |
| 67 | Cabinet foundation, as per plan (633E67101) | EACH | 2 | $1,950.00 | $5,100.00 | $2,033.02 |
| 68 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 2 | $8,575.00 | $8,000.00 | $8,940.05 |
| 69 | Ethernet cable, outdoor-rated (809E64550) | FT | 120 | $3.05 | $2.50 | $3.18 |
| 70 | ITS device, misc.: high-speed ethernet radio (809E65990) | EACH | 2 | $10,650 | $9,475.00 | $11,103 |
| 71 | Stop line radar detection, as per plan (809E69101) | EACH | 6 | $9,725.00 | $8,700.00 | $10,139 |
| 72 | Atc controller, as per plan (809E69123) | EACH | 2 | $5,725.00 | $5,400.00 | $5,968.72 |
| 73 | Railroad preemption interface, (locate on prop. SI (819E10000) | EACH | 2 | $10,525 | $13,680 | $10,973 |
| 74 | LED blankout sign, ("no left turn -train", 30"X24" (828E00100) | EACH | 1 | $4,125.00 | $3,925.00 | $4,300.60 |
| 75 | LED blankout sign, ("no right turn -train", 30"X24 (828E00100) | EACH | 3 | $4,125.00 | $3,925.00 | $4,300.60 |
| 76 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 48 | $75.00 | $100.00 | $100.00 |
| 77 | Water (616E10000) | MGAL | 1 | $245.00 | $1.00 | $69.10 |
| 78 | Railroad flagging services (900E00100) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 79 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,150.00 | $3,100.00 | $5,737.14 |
| 80 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,257.52 | $5,400.00 | $5,121.67 |
| 81 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $30,000 | $54,985 |
| 82 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $6,000.00 | $3,700.00 |
| 83 | Mobilization (624E10000) | LS | 1 | $40,000 | $40,000 | $204,138 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.