ODOT contract 260165 bid tabulation
MOT-SR 725/Jamaica TSG (SIGNALIZATION). Let by Ohio DOT on March 26, 2026, MOT. 6 bids received; low bid $199,365 by Bansal Construction Inc, -1.8% against the engineer's estimate of $203,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 42
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bansal Construction Inc | $199,365 | Low | -2.0% |
| 2 | Complete General Construction Company | $200,490 | +1.0% | -1.0% |
| 3 | Perram Electric Inc | $203,633 | +2.0% | 0.0% |
| 4 | Security Fence Group Inc | $207,508 | +4.0% | +2.0% |
| 5 | Capital Electric Line Builders Inc | $253,314 | +27% | +25% |
| 6 | Miller Cable Company | $399,023 | +100% | +97% |
Engineer's estimate: $203,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bansal Construction Inc | 2. Complete General Construction Company | 3. Perram Electric Inc | 4. Security Fence Group Inc | 5. Capital Electric Line Builders Inc | 6. Miller Cable Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Seeding and mulching (659E10000) | SY | 50 | $5.00 | $51.00 | $15.00 | $25.00 | $44.90 | $48.00 |
| 2 | Erosion control (832E30000) | EACH | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 3 | Ground mounted support, no. 3 post (630E03100) | FT | 54 | $25.33 | $25.33 | $22.90 | $17.05 | $29.90 | $37.00 |
| 4 | Sign support assembly, pole mounted (630E79500) | EACH | 2 | $152.82 | $152.82 | $157.50 | $60.50 | $175.95 | $400.00 |
| 5 | Sign, flat sheet (630E80100) | SF | 36 | $27.21 | $27.21 | $32.00 | $17.60 | $32.20 | $40.00 |
| 6 | Removal of ground mounted sign and disposal (630E84900) | EACH | 20 | $17.02 | $17.02 | $107.50 | $16.50 | $19.55 | $18.00 |
| 7 | Removal of ground mounted post support and disposal (630E86002) | EACH | 20 | $22.70 | $22.70 | $107.50 | $22.00 | $26.45 | $25.00 |
| 8 | Removal of pole mounted sign and reerection (630E87520) | EACH | 2 | $166.61 | $166.61 | $215.00 | $49.50 | $192.05 | $300.00 |
| 9 | Stop line (644E00500) | FT | 42 | $29.95 | $57.54 | $30.00 | $32.95 | $66.70 | $42.00 |
| 10 | Removal of pavement marking (644E30000) | FT | 218 | $12.00 | $15.90 | $12.00 | $13.20 | $18.40 | $16.00 |
| 11 | Bracket arm, 15' (625E18200) | EACH | 1 | $1,530.00 | $1,100.00 | $895.00 | $999.00 | $1,151.73 | $1,800.00 |
| 12 | Conduit, 2", 725.04 (625E25400) | FT | 11 | $19.40 | $30.00 | $34.35 | $42.25 | $43.82 | $45.00 |
| 13 | Conduit, 4", 725.04 (625E25600) | FT | 14 | $47.30 | $62.00 | $93.75 | $94.85 | $73.06 | $65.00 |
| 14 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 1 | $515.00 | $550.00 | $545.00 | $489.00 | $447.93 | $850.00 |
| 15 | Trench (625E29000) | FT | 25 | $16.10 | $10.00 | $17.20 | $13.65 | $47.24 | $32.00 |
| 16 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,290.00 | $1,700.00 | $2,825.00 | $1,428.00 | $1,784.80 | $2,400.00 |
| 17 | Ground rod (625E32000) | EACH | 3 | $490.00 | $325.00 | $340.00 | $270.00 | $338.10 | $350.00 |
| 18 | Underground warning marking tape (625E36010) | FT | 25 | $1.65 | $1.00 | $1.30 | $1.90 | $1.94 | $5.00 |
| 19 | Arc flash calculations and label (SR-725/jamaica R (625E76000) | EACH | 1 | $500.00 | $3,600.00 | $2,000.00 | $2,320.00 | $4,917.40 | $6,500.00 |
| 20 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 8 | $1,400.00 | $1,100.00 | $1,100.00 | $1,365.00 | $1,261.55 | $1,950.00 |
| 21 | Covering of vehicular signal head (632E25000) | EACH | 8 | $80.50 | $40.00 | $20.00 | $41.00 | $19.44 | $150.00 |
| 22 | Signal cable, 4 conductor, no. 14 AWG (632E40400) | FT | 78 | $2.40 | $2.50 | $2.95 | $2.80 | $6.08 | $5.50 |
| 23 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 506 | $2.60 | $3.50 | $4.10 | $4.00 | $6.42 | $7.50 |
| 24 | Signal support foundation, as per plan (632E64011) | EACH | 1 | $9,850.00 | $12,750 | $13,385 | $9,600.00 | $12,084 | $19,000 |
| 25 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 55 | $4.75 | $5.50 | $4.75 | $5.20 | $7.46 | $8.00 |
| 26 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 26 | $7.15 | $7.00 | $8.35 | $6.60 | $8.72 | $12.00 |
| 27 | Power service (632E70000) | EACH | 1 | $6,625.00 | $3,450.00 | $3,175.00 | $4,670.00 | $3,569.60 | $8,500.00 |
| 28 | Combination signal support, misc.: type TC-81.22, (632E81700) | EACH | 1 | $27,570 | $27,100 | $24,350 | $28,425 | $30,139 | $36,000 |
| 29 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $21,850 | $20,300 | $20,508 | $21,880 | $22,540 | $30,000 |
| 30 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $1,850.00 | $4,000.00 | $3,750.00 | $1,990.00 | $3,974.40 | $4,500.00 |
| 31 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,350.00 | $1,600.00 | $945.00 | $1,290.00 | $3,859.40 | $2,000.00 |
| 32 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,700.00 | $7,500.00 | $7,950.00 | $8,440.00 | $8,252.40 | $10,500 |
| 33 | CCTV IP-camera system, dome-type (809E60000) | EACH | 1 | $7,500.00 | $7,700.00 | $6,065.00 | $7,970.00 | $6,872.40 | $10,000 |
| 34 | Ethernet cable, outdoor-rated (809E64550) | FT | 63 | $3.20 | $2.50 | $3.05 | $4.00 | $5.89 | $9.00 |
| 35 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $10,860 | $9,550.00 | $10,385 | $10,420 | $10,780 | $18,000 |
| 36 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $10,750 | $9,300.00 | $10,055 | $10,090 | $10,435 | $19,000 |
| 37 | Atc controller, as per plan (809E69123) | EACH | 1 | $700.00 | $850.00 | $565.00 | $2,470.00 | $949.90 | $2,500.00 |
| 38 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $75.00 | $110.00 | $80.00 | $135.00 | $143.75 | $250.00 |
| 39 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,405.45 | $1,000.00 | $4,017.35 | $2,850.00 | $1,735.35 | $900.00 |
| 40 | Maintaining traffic (614E11000) | LS | 1 | $6,000.00 | $3,200.00 | $8,140.00 | $9,800.00 | $41,099 | $45,000 |
| 41 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $1,000.00 | $2,000.00 | $2,200.00 | $3,105.00 | $32,000 |
| 42 | Mobilization (624E10000) | LS | 1 | $4,000.00 | $15,000 | $10,000 | $7,680.00 | $4,379.20 | $27,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.