ODOT contract 250351 bid tabulation
D06-ITS MAINT-FY2026 (SIGNALIZATION). Let by Ohio DOT on July 17, 2025, District 6. 7 bids received; low bid $1,202,169 by Asplundh Construction LLC.
- Owner
- Ohio DOT
- Letting
- 17 JUL 2025
- Pay items
- 54
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asplundh Construction LLC | $1,202,169 | Low |
| 2 | Danbert Electrical Corp | $1,378,437 | +15% |
| 3 | Complete General Construction Company | $1,422,665 | +18% |
| 4 | Ruhlin Company | $1,442,631 | +20% |
| 5 | Capital Electric Line Builders Inc | $2,017,671 | +68% |
| 6 | Perram Electric Inc | $2,142,042 | +78% |
| 7 | Miller Cable Company | $2,227,194 | +85% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asplundh Construction LLC | 2. Danbert Electrical Corp | 3. Complete General Construction Company | 4. Ruhlin Company | 5. Capital Electric Line Builders Inc | 6. Perram Electric Inc |
|---|---|---|---|---|---|---|---|---|---|
| 2 | Excavation (203E10000) | CY | 525 | $110.00 | $76.50 | $50.00 | $102.34 | $155.38 | $102.60 |
| 3 | Subgrade compaction (204E10000) | SY | 2,095 | $50.00 | $6.30 | $6.00 | $2.00 | $5.97 | $3.05 |
| 4 | Proof rolling (204E45000) | HR | 12 | $385.00 | $200.00 | $260.00 | $829.35 | $310.75 | $340.00 |
| 5 | Aggregate base (304E20000) | CY | 525 | $160.00 | $94.80 | $150.00 | $144.44 | $267.25 | $116.25 |
| 6 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 7 | Connection, unfused permanent (625E00480) | EACH | 9 | $56.00 | $210.00 | $150.00 | $288.84 | $108.61 | $280.00 |
| 11 | Conduit, 2", 725.052 (625E25410) | FT | 1,075 | $5.00 | $7.53 | $12.00 | $13.29 | $6.47 | $12.70 |
| 12 | Conduit, 3", 725.052 (625E25506) | FT | 200 | $8.00 | $11.50 | $19.00 | $14.52 | $6.46 | $17.05 |
| 13 | Trench, 30" deep (625E29010) | FT | 4,475 | $8.00 | $7.69 | $12.00 | $14.21 | $21.42 | $26.06 |
| 14 | Median junction box, as per plan (625E29931) | EACH | 7 | $1,720.00 | $4,260.00 | $12,000 | $2,895.54 | $7,679.12 | $5,425.00 |
| 15 | Pull box, 725.08, 18" (625E30700) | EACH | 17 | $1,200.00 | $1,162.00 | $1,400.00 | $1,312.42 | $1,760.36 | $1,485.00 |
| 16 | Pull box removed (625E31510) | EACH | 8 | $324.00 | $232.00 | $350.00 | $473.53 | $1,127.56 | $455.00 |
| 17 | Pull box, misc.:mow pad (625E31600) | EACH | 60 | $857.00 | $748.00 | $1,500.00 | $1,500.00 | $1,863.28 | $2,756.00 |
| 18 | Ground rod, as per plan (625E32001) | EACH | 25 | $200.00 | $381.00 | $350.00 | $517.50 | $232.91 | $340.00 |
| 19 | Underground warning marking tape (625E36010) | FT | 4,475 | $1.40 | $0.12 | $2.00 | $2.91 | $1.36 | $1.95 |
| 20 | Strain pole foundation (632E64000) | EACH | 2 | $2,464.00 | $9,720.00 | $9,800.00 | $8,251.72 | $18,748 | $9,610.00 |
| 21 | Strain pole, type TC-81.11, design 10, as per plan (632E86131) | EACH | 2 | $12,000 | $13,246 | $12,750 | $17,512 | $14,233 | $13,740 |
| 22 | Cabinet foundation, as per plan (633E67101) | EACH | 13 | $2,579.00 | $2,475.00 | $3,900.00 | $2,094.39 | $3,611.12 | $3,805.00 |
| 23 | Controller work pad, as per plan (633E67201) | EACH | 13 | $3,668.00 | $560.00 | $3,700.00 | $4,707.09 | $4,628.12 | $7,277.00 |
| 24 | Controller work pad, as per plan (633E67201) | EACH | 1 | $3,500.00 | $982.00 | $13,500 | $13,504 | $20,200 | $17,385 |
| 25 | 32" ITS pull box with pad and standard lid assembly, type 2 (809E02000) | EACH | 22 | $2,146.00 | $2,580.00 | $3,900.00 | $4,289.89 | $3,431.54 | $4,990.00 |
| 26 | 32" ITS pull box with pad and hinged lid assembly, type 2 (809E02002) | EACH | 11 | $3,200.00 | $4,080.00 | $5,000.00 | $6,460.83 | $4,798.84 | $6,290.00 |
| 27 | Conduit, multicell, misc.:4", install only (809E25000) | FT | 1,000 | $1.50 | $12.10 | $20.00 | $6.31 | $5.33 | $25.80 |
| 28 | Conduit, multicell, misc.:4", jacked or drilled, I (809E25000) | FT | 500 | $55.00 | $22.00 | $19.00 | $55.68 | $45.20 | $52.20 |
| 29 | Conduit, multicell, misc.:install only through exi (809E25000) | FT | 3,000 | $5.50 | $8.80 | $4.00 | $3.03 | $10.15 | $5.16 |
| 30 | ITS power service, ground mounted, 120/240V, 60 amp (809E51000) | EACH | 1 | $5,000.00 | $9,540.00 | $7,700.00 | $7,089.79 | $9,708.24 | $7,620.00 |
| 31 | ITS power service, ground mounted, 240/480V, 100 amp (809E52100) | EACH | 1 | $6,000.00 | $12,540 | $8,700.00 | $9,434.74 | $26,658 | $11,520 |
| 32 | ITS power service, pole mounted, 120/240V, 60 amp (809E55000) | EACH | 1 | $4,000.00 | $8,580.00 | $8,650.00 | $6,340.17 | $7,448.24 | $5,480.00 |
| 33 | ITS power service, pole mounted, 240/480V, 60 amp (809E56000) | EACH | 1 | $4,500.00 | $9,780.00 | $8,650.00 | $6,340.17 | $26,658 | $8,010.00 |
| 34 | CCTV IP-camera system, dome-type (809E60000) | EACH | 1 | $5,000.00 | $12,060 | $10,200 | $9,139.96 | $8,694.13 | $7,522.00 |
| 35 | CCTV IP-camera system, quad multi-view fixed with PTZ (809E60040) | EACH | 3 | $6,530.00 | $10,780 | $10,200 | $13,718 | $7,518.93 | $14,240 |
| 36 | CCTV pole, 70' tall (809E61040) | EACH | 3 | $24,000 | $68,800 | $50,000 | $45,000 | $64,177 | $53,195 |
| 37 | CCTV lowering unit (809E61090) | EACH | 3 | $15,000 | $14,250 | $11,675 | $12,259 | $11,959 | $23,240 |
| 38 | CCTV lowering unit, installation only (809E61100) | EACH | 1 | $1,549.00 | $1,710.00 | $1,900.00 | $1,000.00 | $3,159.12 | $4,765.00 |
| 39 | Ethernet cable, outdoor-rated (809E64550) | FT | 1,050 | $2.20 | $3.51 | $3.00 | $4.76 | $1.79 | $3.66 |
| 40 | ITS cabinet - ground mounted (809E65000) | EACH | 4 | $10,500 | $12,040 | $10,000 | $13,846 | $9,741.37 | $8,255.00 |
| 41 | Step-down transformer, 3KVA (809E65100) | EACH | 1 | $12,000 | $2,800.00 | $11,000 | $2,651.30 | $13,565 | $17,720 |
| 42 | ITS device, misc.:maintenance of existing power SE (809E65990) | EACH | 6 | $9,271.00 | $3,350.00 | $5,000.00 | $9,401.03 | $26,658 | $12,810 |
| 43 | ITS device, misc.:removal and delivery of steel PO (809E65990) | EACH | 4 | $587.00 | $880.00 | $1,400.00 | $1,363.73 | $3,326.18 | $6,510.00 |
| 44 | ITS device, misc.:removal and delivery of wood pol (809E65990) | EACH | 22 | $587.00 | $892.00 | $1,625.00 | $1,363.73 | $2,255.12 | $2,580.00 |
| 45 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $99.00 | $125.00 | $110.00 | $85.00 | $90.40 | $100.00 |
| 46 | Portable changeable message sign (614E18600) | SNMT | 2 | $3,135.00 | $1,200.00 | $2,300.00 | $1,400.00 | $2,144.56 | $2,820.00 |
| 47 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,150.00 | $7,560.00 | $7,000.00 | $6,811.79 | $13,559 | $30,723 |
| 48 | Maintaining traffic (614E11000) | LS | 1 | $42,000 | $97,500 | $60,000 | $37,882 | $77,246 | $202,025 |
| 49 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,500.00 | $45,780 | $10,500 | $2,280.48 | $11,300 | $18,000 |
| 50 | Mobilization (624E10000) | LS | 1 | $70,000 | $90,200 | $50,000 | $67,500 | $115,697 | $100,000 |
| 100 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 100 | $78.00 | $118.60 | $250.00 | $245.56 | $186.45 | $91.65 |
| 101 | Barrier, misc.:concrete encasement box over expose (622E90200) | EACH | 10 | $2,266.00 | $4,080.00 | $1,825.00 | $1,894.11 | $5,303.68 | $11,100 |
| 102 | Distribution cable, misc.:install only (625E23308) | FT | 20,000 | $2.60 | $2.20 | $2.25 | $1.82 | $2.54 | $2.32 |
| 103 | Conduit, misc.:conduit repair (625E25930) | EACH | 1 | $3,774.00 | $1,680.00 | $1,600.00 | $2,799.84 | $2,255.12 | $6,300.00 |
| 104 | Pull box, misc.:install only (625E31600) | EACH | 6 | $647.00 | $788.00 | $1,200.00 | $1,954.75 | $1,579.56 | $4,320.00 |
| 200 | Maintenance of traffic, one lane closure on A 4 lane or greater divided highway (614E13800) | EACH | 10 | $3,300.00 | $6,906.00 | $4,000.00 | $5,000.00 | $6,893.00 | $3,290.00 |
| 201 | Signalization, misc.:clearing of ITS sites (632E90400) | EACH | 10 | $1,911.00 | $2,750.00 | $1,000.00 | $1,578.27 | $3,159.12 | $4,940.00 |
| 202 | ITS device, misc.:removal of cabinet (809E65990) | EACH | 3 | $513.00 | $390.00 | $650.00 | $909.16 | $2,311.62 | $1,290.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.