ODOT letting results, May 12, 2022

43 contracts let by Ohio DOT on May 12, 2022, $167,638,279 in low bids, a median of 3 bidders per contract. On the 43 with an engineer's estimate, the low bid came in under it 17 times; median low bid +2.0% against the estimate.

Owner
Ohio DOT
Contracts
43
Low bids, total
$167,638,279
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220256LUC-IR 475-01.85 @20A Interchnge (PART 1, PART 2, PART 3) (MAJOR RECONSTRUCTION)LUC3Kokosing Construction Company Inc$101,983,274$103,707,607+2.0%-8.0%ODOT
223005MAD-IR 70-10.27 Phase 2 (INTERCHANGE)MAD4Eagle Bridge Co$13,174,360$13,509,639+3.0%0.0%ODOT
220290CLI-IR 71-12.13/13.99 (BRIDGE REPLACEMENT (2 BRIDGES))CLI4Shelly & Sands Inc$10,351,991$10,377,3590.0%+18%ODOT
220322GUE-/MUS/COS-SR 662-00.00/00.00/00.00 (MAJOR RECONSTRUCTION)GUE2Shelly & Sands Inc$6,832,488$7,165,843+5.0%+10%ODOT
220304TRU-SR 5/SR 82-13.94/13.88 (PART 1 AND PART 2) (FOUR LANE RESURFACING)TRU2Shelly & Sands Inc$3,509,499$4,675,252+33%+6.0%ODOT
220300MAR-SR 98-06.22 (at SR 529) (INTERSECTION)MAR3Miller Bros Const Inc$2,546,283$3,324,687+31%-13%ODOT
220298LOR-US 6-00.00 (FOUR LANE RESURFACING)LOR3Kokosing Construction Company Inc$2,360,142$2,505,298+6.0%-6.0%ODOT
220302OTT-SR 163-33.85 Roundabout (INTERSECTION)OTT1Great Lakes Demolition Company$2,035,827+2.0%ODOT
220307ASD-/MED-IR 71/IR 76 Truck Parking (PARKING AREAS)ASD3Shelly & Sands Inc$2,006,926$2,147,929+7.0%-1.0%ODOT
220295HAM-US 22/SR 3-09.66 Silverton (SIGNALIZATION)HAM3Complete General Construction Company$1,949,591$2,139,086+10%+4.0%ODOT
220314D04-SP FY2022 (West) (SPOT PATCHING / PAVEMENT REPAIR)District 43Karvo Companies Inc$1,888,000$2,758,700+46%+44%ODOT
220324LAW-SR 378-06.56 Landslide (SLIDE REPAIR)LAW3Alan Stone Co Inc$1,325,261$1,393,044+5.0%-9.0%ODOT
220313D04-SP FY2022 (East) (SPOT PATCHING / PAVEMENT REPAIR)District 43Shelly Company$1,324,544$1,488,000+12%+2.0%ODOT
220305WAS-Start Westward Phase 1 (LIGHTING)WAS2Complete General Construction Company$1,301,556$1,324,339+2.0%+22%ODOT
220319D09-GR-FY2022 (GUARDRAIL REBUILDING)District 92Lake Erie Construction Company$1,186,725$1,269,715+7.0%+9.0%ODOT
220297LOG-SR 347-03.63 (FOUR LANE RESURFACING)LOG1Shelly Company$1,132,004+2.0%ODOT
220303SUM-CR 17-23.27 Brecksville Rd (TWO LANE RESURFACING)SUM6Shelly Company$1,078,757$1,119,000+4.0%-6.0%ODOT
220301MED-SR 3-17.05 (CULVERT REPLACEMENT)MED1Great Lakes Construction Co$1,068,788+9.0%ODOT
220317D05-FY 2022 Signal Upgrade (SIGNALIZATION)District 54Perram Electric Inc$1,057,975$1,079,066+2.0%+4.0%ODOT
220321FAY-/MAD-SP FY22 Gen (SPOT PATCHING / PAVEMENT REPAIR)FAY2Kokosing Construction Company Inc$836,324$999,592+20%+8.0%ODOT
220315D04-CS FY2022 (CRACK SEALING)District 42 of 4$831,417$835,0940.0%-25%ODOT
220308D03-/RIC-SR 95/SR 603-01.46/00.00 (CHIP SEAL)District 33Henry W Bergman Inc$629,065$653,009+4.0%0.0%ODOT
220326MEG-SR 681-04.78 (SLIDE REPAIR)MEG10Allard Excavation LLC$595,484$613,862+3.0%-12%ODOT
220323JEF-SR 7-04.00 Truck Parking Area (PARKING AREAS)JEF5Ohio-West Virginia Excavating Co$594,091$646,616+9.0%-13%ODOT
220291COL-SR 45-03.36 (CULVERT REPLACEMENT)COL6Bog Construction Inc$556,775$615,384+11%-27%ODOT
220263BEL-SR 149-13.63 (SLIDE REPAIR)BEL4Litman Excavating Inc$507,901$547,325+8.0%-20%ODOT
224015ATH-SR 691-05.17 (CULVERT REPLACEMENT)ATH5Parker Corporation$408,462$488,036+19%0.0%ODOT
220310BEL-SR 26-06.92 (SLIDE REPAIR)BEL4Alan Stone Co Inc$390,924$398,219+2.0%-13%ODOT
220320D10-RPM FY2022 (RAISED PAVEMENT MARKERS)District 102W L Markers Inc$347,727$378,131+9.0%+37%ODOT
220299MAH-McGaffney St Extension Ph 2 (NEW CONSTRUCTION)MAH7Shelly & Sands Inc$344,314$383,000+11%-22%ODOT
224017LOR-SR 57-06.58 (CULVERT REPLACEMENT)LOR2Eclipse Co LLC$342,654$382,570+12%+14%ODOT
220312D02-TSG FY2022 (SIGNALIZATION)District 24Miller Cable Company$322,000$327,500+2.0%-1.0%ODOT
220318D06-RPM FY22 (RAISED PAVEMENT MARKERS)District 62W L Markers Inc$309,011$392,052+27%+29%ODOT
220329WAS-Belpre Resurfacing FY2022 (TWO LANE RESURFACING)WAS1Shelly & Sands Inc$308,033+1.0%ODOT
220309BEL-IR 70-VARIOUS (BRIDGE REPAIR)BEL5Ram Construction Services of Michigan, Inc$297,247$309,284+4.0%+12%ODOT
220294GRE-Yellow Springs SRTS 2019 (SIDEWALK)GRE2Fillmore Construction$296,876$384,825+30%+35%ODOT
220330WAY-US 30/SR 57-(06.63)(06.98)/01.80 (CULVERT REPLACEMENT)WAY2Eclipse Co LLC$293,510$232,737-21%+47%ODOT
220306ADA-SR 125-01.34 Slide Repair (SLIDE REPAIR)ADA6Allard Excavation LLC$278,592$296,618+6.0%-13%ODOT
220328SCI-SR 335-09.38 Slide Repair (SLIDE REPAIR)SCI4Allard Excavation LLC$248,874$286,896+15%-16%ODOT
220316D04-LOOP FY2022 (SIGNALIZATION)District 42Miller Cable Company$212,500$229,150+8.0%+8.0%ODOT
220327OTT-SR 105-04.90 Clvt replace (CULVERT REPLACEMENT)OTT3Geo Gradel Co$203,298$265,928+31%-33%ODOT
220292CUY-SRTS FY2022 Cleveland Hts (SIDEWALK)CUY3Cook Paving & Construction Co Inc$199,468$178,000-11%+19%ODOT
220289BRO-US 52-03.63 Geotech/Landslide (SLIDE REPAIR)BRO5Coopers Excavating LLC$169,741$179,885+6.0%+4.0%ODOT
ODOT contracts let on May 12, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy