Cook Paving & Construction Co Inc: ODOT bid record
Cook Paving & Construction Co Inc submitted 18 bids on Ohio DOT contracts in the data, from 09 APR 2020 to 29 OCT 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,572,450
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2022 | 2 | 2 | 100% |
| 2023 | 5 | 2 | 40% |
| 2024 | 1 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 13 | 5 | 38% |
| LAK | 2 | 0 | 0% |
| MED | 1 | 0 | 0% |
| SUM | 1 | 0 | 0% |
| GEA | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 14 | 14 (100%) | $1.00 | $1.00 |
| Topsoil | 659E00300 | CY | 16 | 4 (25%) | $72.50 | $45.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 10 | 4 (40%) | $75.00 | $80.00 |
| Non-tracking tack coat | 407E20000 | GAL | 5 | 4 (80%) | $5.00 | $3.25 |
| Seeding and mulching, class 1 | 659E00500 | SY | 8 | 3 (38%) | $8.25 | $3.00 |
| Water | 616E10000 | MGAL | 7 | 3 (43%) | $55.00 | $20.00 |
| Curb removed | 202E32000 | FT | 7 | 3 (43%) | $11.00 | $10.00 |
| Special - miscellaneous metal | 611E99820 | LB | 7 | 3 (43%) | $1.75 | $2.29 |
| Walk removed | 202E30000 | SF | 6 | 3 (50%) | $4.00 | $4.00 |
| Transverse/diagonal line | 644E00700 | FT | 6 | 3 (50%) | $6.75 | $7.00 |
| Manhole adjusted to grade | 611E99654 | EACH | 5 | 3 (60%) | $815.00 | $950.00 |
| Removal of pole mounted sign and disposal | 630E87500 | EACH | 5 | 3 (60%) | $20.00 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perk Company Inc | 9 | 3 of 9 |
| Terrace Construction Co Inc | 5 | 4 of 5 |
| Eclipse Co LLC | 4 | 1 of 4 |
| Madex Construction Co | 4 | 1 of 4 |
| Digioia-Suburban Excavating LLC | 3 | 2 of 3 |
| D L Smith Concrete LLC | 3 | 3 of 3 |
| Schirmer Construction LLC | 2 | 1 of 2 |
| Chagrin Valley Paving Inc | 2 | 1 of 2 |
| C A Agresta Construction Co | 2 | 1 of 2 |
| Perram Electric Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 264029 | LAK | LAK-SR 283-03.29 Sidewalk (SIDEWALK) | 2 of 4 | $545,972 | +15% |
| 17 SEP 2026 | 260402 | CUY | CUY-Cle Downtown Connector Trl 1 (BIKEWAYS) | 2 of 5 | $1,479,698 | +11% |
| 04 DEC 2025 | 254030 | GEA | GEA-US 322-05.76 Slope (SLIDE REPAIR) | 3 of 3 | $1,121,248 | +12% |
| 17 JUL 2025 | 250349 | SUM | SUM-SR 21-19.57/VAR (TWO LANE RESURFACING) | 6 of 8 | $1,043,925 | +29% |
| 09 MAY 2024 | 240273 | MED | MED-SR 94-07.64 (TWO LANE RESURFACING) | 3 of 4 | $554,463 | +19% |
| 30 NOV 2023 | 230570 | LAK | LAK-SR 84-02.07 Signals (INTERSECTION) | 4 of 6 | $392,243 | +24% |
| 09 MAR 2023 | 230144 | CUY | CUY-Wolf Road Intersection (INTERSECTION) | 1 of 4 | $330,098 | Low, 19% under the second |
| 09 FEB 2023 | 230083 | CUY | CUY-SRTS FY2023 Bay Village (SIDEWALK) | 5 of 5 | $333,764 | +33% |
| 26 JAN 2023 | 230043 | CUY | CUY-Bennett Road Path TLCI (BIKEWAYS) | 4 of 6 | $319,858 | +15% |
| 26 JAN 2023 | 230044 | CUY | CUY-IR 480-05.40/10.54 RampClear (PART 1 AND PART 2) (MINOR WIDENING) | 1 of 3 | $674,600 | Low, 20% under the second |
| 12 MAY 2022 | 220292 | CUY | CUY-SRTS FY2022 Cleveland Hts (SIDEWALK) | 1 of 3 | $199,468 | Low, -11% under the second |
| 28 APR 2022 | 220265 | CUY | CUY-Mayfield Hts TLCI (SIDEWALK) | 1 of 2 | $383,424 | Low, 35% under the second |
| 12 AUG 2021 | 210456 | CUY | CUY-North Royalton TLCI Sidewalk (SIDEWALK) | 4 of 5 | $114,311 | +30% |
| 01 JUL 2021 | 210386 | CUY | CUY-Towpath Trail PH4 Trailhead (BIKEWAYS) | 1 of 1 | $984,861 | Low |
| 15 APR 2021 | 210230 | CUY | CUY-SR 175-08.59 Safety (INTERSECTION) | 3 of 3 | $467,258 | +8.0% |
| 30 JUL 2020 | 200406 | CUY | CUY-SRTS FY2021 Brooklyn (SIDEWALK) | 3 of 3 | $86,845 | +10% |
| 21 MAY 2020 | 200288 | CUY | CUY-SRTS FY2020 Cleveland Hts (SIDEWALK) | 3 of 4 | $178,954 | +26% |
| 09 APR 2020 | 200198 | CUY | CUY-SRTS FY2021 Cleveland (SIDEWALK) | 2 of 6 | $509,235 | +3.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.