Schirmer Construction LLC: ODOT bid record
Schirmer Construction LLC submitted 16 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 19 FEB 2026, and was the low bidder on 3 of them (19%). When it was not low, its total sat a median +38% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,827,262
- Latest bid
- 19 FEB 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 2 | 40% |
| 2021 | 3 | 0 | 0% |
| 2022 | 3 | 1 | 33% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 12 | 3 | 25% |
| District 12 | 2 | 0 | 0% |
| LOR | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 13 | 13 (100%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 10 | 8 (80%) | $550.00 | $850.00 |
| Soil analysis test | 659E00100 | EACH | 6 | 5 (83%) | $10.00 | $115.50 |
| Water | 659E35000 | MGAL | 11 | 2 (18%) | $18.00 | $1.00 |
| Excavation | 203E10000 | CY | 11 | 2 (18%) | $60.00 | $27.00 |
| Lime | 659E31000 | ACRE | 8 | 2 (25%) | $150.00 | $150.00 |
| Subgrade compaction | 204E10000 | SY | 8 | 2 (25%) | $3.00 | $3.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 6 | 2 (33%) | $57.50 | $80.00 |
| Tack coat | 407E10000 | GAL | 6 | 2 (33%) | $3.50 | $3.25 |
| Water | 616E10000 | MGAL | 5 | 2 (40%) | $10.00 | $20.00 |
| Topsoil | 659E00300 | CY | 11 | 1 (9%) | $110.00 | $45.00 |
| Embankment | 203E20000 | CY | 10 | 1 (10%) | $70.00 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perk Company Inc | 8 | 6 of 8 |
| Eclipse Co LLC | 5 | 3 of 5 |
| Suburban Maintenance & Construction Inc | 4 | 3 of 4 |
| Union Industrial Contractors Inc | 3 | 2 of 3 |
| Great Lakes Construction Co | 3 | 2 of 3 |
| Madex Construction Co | 3 | 3 of 3 |
| Cook Paving & Construction Co Inc | 2 | 1 of 2 |
| Ohio Concrete Paving LLC | 2 | 2 of 2 |
| Vasta Construction Company Inc | 2 | 1 of 2 |
| DOT Construction Corp | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 FEB 2026 | 260102 | CUY | CUY-York Rd/Bennett Road (MISCELLANEOUS) | 7 of 7 | $179,504 | +54% |
| 29 JAN 2026 | 260051 | CUY | CUY-Greenhurst Drive Bridge Demo (MISCELLANEOUS) | 5 of 5 | $486,503 | +46% |
| 27 FEB 2025 | 250125 | LOR | LOR-US 20-24.97 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $4,084,776 | +49% |
| 19 DEC 2024 | 240573 | CUY | CUY-Middleburg Hts TLCI FY2023 (MISCELLANEOUS) | 5 of 5 | $614,190 | +86% |
| 26 JAN 2023 | 230043 | CUY | CUY-Bennett Road Path TLCI (BIKEWAYS) | 2 of 6 | $293,796 | +6.0% |
| 03 NOV 2022 | 220570 | CUY | CUY-Independence Blvd Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $1,017,463 | +12% |
| 17 MAR 2022 | 220171 | CUY | CUY-Interurban Pedestrian Bridge (NEW CONSTRUCTION) | 1 of 2 | $626,467 | Low, 42% under the second |
| 27 JAN 2022 | 220042 | CUY | CUY-Ashton Lane Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 6 | $797,757 | +16% |
| 02 DEC 2021 | 210629 | CUY | CUY-Main Avenue Connector TLCI (MISCELLANEOUS) | 2 of 3 | $647,735 | +53% |
| 27 MAY 2021 | 210361 | LOR | LOR-SR 252-01.90 (SLIDE REPAIR) | 6 of 6 | $176,993 | +93% |
| 11 MAR 2021 | 210145 | CUY | CUY-IR 480-22.41 Subdeck (BRIDGE REPAIR) | 5 of 13 | $206,772 | +26% |
| 18 JUN 2020 | 200346 | CUY | CUY-SR 174-03.75 Slide (SLIDE REPAIR) | 1 of 4 | $189,607 | Low, 5.0% under the second |
| 23 APR 2020 | 200233 | District 12 | D12-BH FY2020 Deck Sealing (BRIDGE REPAIR) | 8 of 8 | $1,325,250 | +35% |
| 09 APR 2020 | 200198 | CUY | CUY-SRTS FY2021 Cleveland (SIDEWALK) | 6 of 6 | $684,100 | +38% |
| 09 APR 2020 | 200219 | District 12 | D12-BC FY2020 (BRIDGE CLEANING) | 4 of 5 | $1,481,075 | +23% |
| 13 FEB 2020 | 200051 | CUY | CUY-SR 14-06.20/06.70 (BRIDGE REPAIR) | 1 of 1 | $2,011,189 | Low |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.