ODOT contract 260051 bid tabulation
CUY-Greenhurst Drive Bridge Demo (MISCELLANEOUS). Let by Ohio DOT on January 29, 2026, CUY. 5 bids received; low bid $333,889 by Daniel R Schmoldt Enterprises Inc, -14% against the engineer's estimate of $390,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 44
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Daniel R Schmoldt Enterprises Inc | $333,889 | Low | -14% |
| 2 | Baumann Enterprises Inc | $343,565 | +3.0% | -12% |
| 3 | Madex Construction Co | $451,381 | +35% | +16% |
| 4 | Matt Winters Excavation LLC | $466,187 | +40% | +20% |
| 5 | Schirmer Construction LLC | $486,503 | +46% | +25% |
Engineer's estimate: $390,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Daniel R Schmoldt Enterprises Inc | 2. Baumann Enterprises Inc | 3. Madex Construction Co | 4. Matt Winters Excavation LLC | 5. Schirmer Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $8,800.00 | $8,000.00 | $15,455 | $30,000 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 825 | $18.00 | $9.25 | $20.66 | $20.00 | $14.00 |
| 3 | Wearing course removed (202E23500) | SY | 152 | $20.75 | $7.50 | $52.11 | $50.00 | $21.00 |
| 4 | Curb removed (202E32000) | FT | 701 | $5.00 | $8.00 | $12.39 | $15.00 | $7.00 |
| 5 | Fence removed (202E75000) | FT | 24 | $10.00 | $15.00 | $11.58 | $20.00 | $27.00 |
| 6 | Excavation (203E10000) | CY | 32 | $50.00 | $35.00 | $68.34 | $25.00 | $90.00 |
| 7 | Embankment (203E20000) | CY | 26 | $60.00 | $40.00 | $82.77 | $90.00 | $100.00 |
| 8 | Subgrade compaction (204E10000) | SY | 1,349 | $3.00 | $5.00 | $4.63 | $8.00 | $2.00 |
| 9 | Proof rolling (204E45000) | HR | 3 | $125.00 | $200.00 | $173.68 | $500.00 | $50.00 |
| 10 | Monument assembly, type C (623E38500) | EACH | 3 | $1,400.00 | $2,000.00 | $2,547.37 | $2,250.00 | $500.00 |
| 11 | Right-of-way monument, type B (623E40520) | EACH | 3 | $1,660.00 | $500.00 | $926.32 | $2,250.00 | $500.00 |
| 12 | Special - mailbox removed and reset (690E50350) | EACH | 1 | $150.00 | $600.00 | $289.47 | $450.00 | $200.00 |
| 13 | Special - bollard, hinged (690E50610) | EACH | 8 | $1,250.00 | $1,400.00 | $1,536.84 | $1,600.00 | $1,600.00 |
| 14 | Soil analysis test (659E00100) | EACH | 1 | $450.00 | $2,000.00 | $73.68 | $200.00 | $10.00 |
| 15 | Topsoil (659E00300) | CY | 23 | $52.00 | $55.00 | $88.42 | $100.00 | $160.00 |
| 16 | Seeding and mulching, class 1 (659E00500) | SY | 207 | $3.25 | $1.25 | $11.58 | $17.00 | $10.00 |
| 17 | Repair seeding and mulching (659E14000) | SY | 11 | $5.00 | $1.50 | $11.58 | $8.00 | $5.00 |
| 18 | Inter-seeding (659E15000) | SY | 11 | $10.00 | $1.50 | $11.58 | $0.25 | $5.00 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.03 | $1,000.00 | $3,000.00 | $2,026.33 | $860.00 | $500.00 |
| 20 | Lime (659E31000) | ACRE | 0.04 | $1,000.00 | $2,000.00 | $447.25 | $100.00 | $500.00 |
| 21 | Water (659E35000) | MGAL | 2 | $2.00 | $38.00 | $17.37 | $1.00 | $10.00 |
| 22 | Erosion control (832E30000) | EACH | 11,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 4 | $200.00 | $200.00 | $169.55 | $1,150.00 | $150.00 |
| 24 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $750.00 | $2,000.00 | $2,315.79 | $1,500.00 | $400.00 |
| 25 | Manhole adjusted to grade (611E99654) | EACH | 2 | $1,200.00 | $2,000.00 | $2,894.74 | $1,500.00 | $600.00 |
| 26 | Pavement planing, asphalt concrete , T=3" (254E01000) | SY | 213 | $3.19 | $8.50 | $40.53 | $22.00 | $30.00 |
| 27 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 235 | $231.00 | $190.00 | $254.74 | $210.00 | $215.00 |
| 28 | Aggregate base (304E20000) | CY | 229 | $98.00 | $85.00 | $128.00 | $130.00 | $110.00 |
| 29 | Tack coat (407E10000) | GAL | 101 | $2.20 | $8.00 | $2.32 | $3.25 | $2.00 |
| 30 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 57 | $374.00 | $220.00 | $405.26 | $520.00 | $345.00 |
| 31 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 78 | $302.50 | $320.00 | $330.00 | $300.00 | $280.00 |
| 32 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 189 | $79.00 | $155.00 | $103.16 | $150.00 | $71.00 |
| 33 | Curb, type 6 (609E26000) | FT | 1,004 | $24.50 | $48.00 | $43.68 | $75.00 | $23.00 |
| 34 | Special - valve box adjusted to grade, city of cle (638E20500) | EACH | 1 | $500.00 | $4,000.00 | $1,042.11 | $1,600.00 | $150.00 |
| 35 | Object marker, one way (614E13350) | EACH | 8 | $35.75 | $50.00 | $46.32 | $65.00 | $35.00 |
| 36 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $27.50 | $250.00 | $173.68 | $21.00 | $50.00 |
| 37 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $27.50 | $200.00 | $173.68 | $26.00 | $50.00 |
| 38 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $50,000 | $35,000 | $52,064 | $58,980 | $222,500 |
| 39 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,750.00 | $11,797 | $9,957.89 | $8,800.00 | $11,000 |
| 40 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $1,000.00 | $1,500.00 | $5,789.47 | $2,500.00 | $1,000.00 |
| 41 | Maintaining traffic (614E11000) | LS | 1 | $2,750.00 | $2,000.00 | $8,137.14 | $3,000.00 | $1,000.00 |
| 42 | Field office, type A (619E16000) | MNTH | 3 | $1,200.00 | $1,200.00 | $736.84 | $250.00 | $800.00 |
| 43 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,604 | $7,000.00 | $17,474 | $3,600.00 | $8,000.00 |
| 44 | Mobilization (624E10000) | LS | 1 | $20,000 | $20,000 | $32,439 | $10,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.