C A Agresta Construction Co: ODOT bid record
C A Agresta Construction Co submitted 11 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 07 MAY 2026, and was the low bidder on 1 of them (9%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,227,470
- Latest bid
- 07 MAY 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 1 | 1 | 100% |
| 2025 | 3 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 9 | 1 | 11% |
| LAK | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Commercial fertilizer | 659E20000 | TON | 7 | 6 (86%) | $600.00 | $850.00 |
| Erosion control | 832E30000 | EACH | 6 | 6 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 10 | 5 (50%) | $72.50 | $80.00 |
| Erosion control, as per plan | 832E30001 | EACH | 5 | 5 (100%) | $1.00 | $1.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 7 | 4 (57%) | $900.00 | $950.00 |
| Ground rod | 625E32000 | EACH | 5 | 4 (80%) | $265.00 | $285.00 |
| Subgrade compaction | 204E10000 | SY | 10 | 3 (30%) | $1.50 | $3.00 |
| Walk removed, as per plan | 202E30001 | SF | 7 | 3 (43%) | $2.00 | $4.50 |
| Sign, flat sheet | 630E80100 | SF | 6 | 3 (50%) | $19.50 | $24.00 |
| Pavement removed, as per plan | 202E23001 | SY | 6 | 3 (50%) | $15.00 | $20.00 |
| Detector loop, as per plan | 632E26501 | EACH | 5 | 3 (60%) | $1,550.00 | $1,400.00 |
| Water | 659E35000 | MGAL | 8 | 2 (25%) | $25.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perk Company Inc | 10 | 4 of 10 |
| Karvo Companies Inc | 6 | 4 of 6 |
| Tri-Mor Corp | 4 | 2 of 4 |
| Ronyak Paving Inc | 3 | 2 of 3 |
| Barbicas Construction Company Inc | 2 | 1 of 2 |
| Smith Paving & Excavating Inc | 2 | 1 of 2 |
| Catts Construction Inc | 2 | 2 of 2 |
| Terrace Construction Co Inc | 2 | 2 of 2 |
| Digioia-Suburban Excavating LLC | 2 | 2 of 2 |
| Cook Paving & Construction Co Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 MAY 2026 | 260235 | CUY | CUY-SR 8-00.52 Pedestrian (SIDEWALK) | 2 of 6 | $914,474 | +2.0% |
| 04 DEC 2025 | 250560 | LAK | LAK-E 305th St. Resurface (FOUR LANE RESURFACING) | 2 of 5 | $2,740,440 | +3.0% |
| 14 AUG 2025 | 250377 | CUY | CUY-SRTS FY2023 Warrensville Hts (SPOT SAFETY) | 2 of 6 | $667,731 | +7.0% |
| 10 APR 2025 | 250190 | CUY | CUY-Villaview Road (MINOR RECONSTRUCTION) | 3 of 3 | $3,947,764 | +36% |
| 22 FEB 2024 | 240131 | CUY | CUY-SR 237-03.75 (FOUR LANE RESURFACING) | 1 of 6 | $1,227,470 | Low, 8.0% under the second |
| 30 NOV 2023 | 230570 | LAK | LAK-SR 84-02.07 Signals (INTERSECTION) | 3 of 6 | $367,414 | +16% |
| 09 FEB 2023 | 230081 | CUY | CUY-SR 175 Multi-Purpose Trail (SIDEWALK) | 8 of 8 | $834,447 | +20% |
| 12 AUG 2021 | 210456 | CUY | CUY-North Royalton TLCI Sidewalk (SIDEWALK) | 5 of 5 | $127,740 | +46% |
| 28 JAN 2021 | 210046 | CUY | CUY-SR 175-13.31 Safety (TWO LANE RESURFACING) | 6 of 6 | $1,016,790 | +29% |
| 26 MAR 2020 | 200165 | CUY | CUY-SR 175-07.30 (SPOT PATCHING / PAVEMENT REPAIR) | 4 of 8 | $714,497 | +19% |
| 13 FEB 2020 | 200005 | CUY | CUY-East 55th Street (TWO LANE RESURFACING) | 6 of 6 | $1,819,114 | +24% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.