Terrace Construction Co Inc: ODOT bid record

Terrace Construction Co Inc submitted 17 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 26 MAY 2022, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$4,714,496
Latest bid
26 MAY 2022
Data through
12 NOV 2026
17Bids
6Low bids
35Win rate, percent
+6.0%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20206350%
202110330%
2022100%
Terrace Construction Co Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY14536%
LAK11100%
GEA100%
POR100%
Terrace Construction Co Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1010 (100%)$1.00$1.00
Trench625E29000FT117 (64%)$10.25$12.00
Ground rod625E32000EACH126 (50%)$203.00$285.00
Curb removed202E32000FT96 (67%)$6.30$10.00
Cabinet foundation633E67100EACH66 (100%)$1,389.65$2,760.00
Pedestrian signal head (LED), type D2, countdown, as per plan632E20731EACH85 (63%)$412.38$650.00
Excavation203E10000CY75 (71%)$24.50$27.00
Subgrade compaction204E10000SY75 (71%)$1.15$3.00
Manhole adjusted to grade611E99654EACH75 (71%)$310.00$950.00
Valve box adjusted to grade638E10800EACH55 (100%)$126.00$500.00
Topsoil659E00300CY154 (27%)$63.00$45.00
Law enforcement officer with patrol car for assistance614E11110HR114 (36%)$68.25$80.00
Terrace Construction Co Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Perk Company Inc105 of 10
Cook Paving & Construction Co Inc51 of 5
Perram Electric Inc53 of 5
Eclipse Co LLC40 of 4
Miller Cable Company42 of 4
Karvo Companies Inc41 of 4
Catts Construction Inc31 of 3
Lakeland Electric Inc31 of 3
Chagrin Valley Paving Inc30 of 3
S E T Inc21 of 2
Terrace Construction Co Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
26 MAY 2022220339CUYCUY-US 6/US 20-21.10 Safety (SPOT SAFETY)2 of 4$967,700+3.0%
12 AUG 2021210456CUYCUY-North Royalton TLCI Sidewalk (SIDEWALK)1 of 5$87,595Low, 14% under the second
12 AUG 2021210457CUYCUY-US 422-04.34 Safety (INTERSECTION)1 of 3$2,499,582Low, 17% under the second
29 JUL 2021210433CUYCUY-US 42-11.01 (FOUR LANE RESURFACING)4 of 6$2,368,189+7.0%
29 APR 2021210192CUYCUY-Cleveland PSIP (SPOT SAFETY)2 of 5$1,431,322+2.0%
15 APR 2021210230CUYCUY-SR 175-08.59 Safety (INTERSECTION)1 of 3$433,652Low, 4.0% under the second
11 FEB 2021210082CUYCUY-US 322-15.59 Safety (INTERSECTION)2 of 3$583,774+8.0%
28 JAN 2021210046CUYCUY-SR 175-13.31 Safety (TWO LANE RESURFACING)3 of 6$948,328+20%
28 JAN 2021210047CUYCUY-Union Avenue (FOUR LANE RESURFACING)3 of 6$4,242,442+4.0%
28 JAN 2021210070PORPOR-Aurora Signals (SIGNALIZATION)2 of 5$2,856,350+16%
14 JAN 2021210038GEAGEA-SR 87-02.73 Signals (SIGNALIZATION)6 of 6$289,542+31%
30 JUL 2020200406CUYCUY-SRTS FY2021 Brooklyn (SIDEWALK)1 of 3$79,044Low, 5.0% under the second
21 MAY 2020200288CUYCUY-SRTS FY2020 Cleveland Hts (SIDEWALK)1 of 4$141,901Low, 18% under the second
23 APR 2020200227CUYCUY-East 116th/Harvard Signal (SIGNALIZATION)2 of 3$206,325+6.0%
23 APR 2020200229CUYCUY-SR 43-10.61 (FOUR LANE RESURFACING)3 of 4$6,198,468+3.0%
09 APR 2020200198CUYCUY-SRTS FY2021 Cleveland (SIDEWALK)3 of 6$521,616+5.0%
26 MAR 2020200175LAKLAK-IR 90-13.63 VSL Upgrade (SIGNING)1 of 2$1,472,722Low, 9.0% under the second
Terrace Construction Co Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.