ODOT contract 260235 bid tabulation
CUY-SR 8-00.52 Pedestrian (SIDEWALK). Let by Ohio DOT on May 7, 2026, CUY. 6 bids received; low bid $899,183 by R M H Concrete & Foundations Inc, -12% against the engineer's estimate of $1,018,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 95
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | R M H Concrete & Foundations Inc | $899,183 | Low | -12% |
| 2 | C A Agresta Construction Co | $914,474 | +2.0% | -10% |
| 3 | Karvo Companies Inc | $1,075,062 | +20% | +6.0% |
| 4 | Perk Company Inc | $1,204,428 | +34% | +18% |
| 5 | Ruhlin Company | $1,219,305 | +36% | +20% |
| 6 | Madex Construction Co | $1,593,159 | +77% | +56% |
Engineer's estimate: $1,018,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R M H Concrete & Foundations Inc | 2. C A Agresta Construction Co | 3. Karvo Companies Inc | 4. Perk Company Inc | 5. Ruhlin Company | 6. Madex Construction Co |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,750.00 | $500.00 | $35,000 | $9,125.00 | $3,500.00 | $11,600 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 1,420 | $12.70 | $12.00 | $20.00 | $25.00 | $26.00 | $52.11 |
| 3 | Walk removed, as per plan (202E30001) | SF | 2,505 | $1.80 | $1.00 | $5.00 | $2.65 | $4.35 | $5.79 |
| 4 | Curb removed, as per plan (202E32001) | FT | 25 | $15.00 | $10.00 | $40.00 | $12.70 | $65.00 | $16.06 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 42 | $12.75 | $5.00 | $80.00 | $35.10 | $45.00 | $104.21 |
| 6 | Guardrail removed (202E38000) | FT | 8 | $80.00 | $75.00 | $200.00 | $6.30 | $125.00 | $86.84 |
| 7 | Catch basin removed (202E58100) | EACH | 2 | $400.00 | $500.00 | $825.00 | $400.00 | $500.00 | $1,316.66 |
| 8 | Excavation (203E10000) | CY | 107 | $55.00 | $40.00 | $125.00 | $63.15 | $40.00 | $110.00 |
| 9 | Embankment (203E20000) | CY | 86 | $65.00 | $15.00 | $75.00 | $71.50 | $135.00 | $114.63 |
| 10 | Subgrade compaction (204E10000) | SY | 1,420 | $1.10 | $1.00 | $2.00 | $1.50 | $5.00 | $4.63 |
| 11 | Reshaping under guardrail (209E15050) | MI | 0.06 | $33,000 | $2,000.00 | $18,000 | $44,575 | $30,000 | $2,894.67 |
| 12 | Linear grading, misc.: cuyahoga county (209E98300) | SY | 4,394 | $3.85 | $5.00 | $5.00 | $7.10 | $4.25 | $5.79 |
| 13 | 4" concrete walk (608E10000) | SF | 24,599 | $7.25 | $9.50 | $6.75 | $12.00 | $10.50 | $11.58 |
| 14 | Curb ramp (608E52000) | SF | 1,300 | $13.50 | $23.00 | $15.00 | $35.95 | $28.50 | $33.58 |
| 15 | Right-of-way monument, type B (623E40520) | EACH | 24 | $110.00 | $350.00 | $200.00 | $315.00 | $615.00 | $1,013.15 |
| 16 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $3,200.00 | $2,500.00 | $1,200.00 | $1,000.00 | $5,500.00 | $8,684.21 |
| 17 | Soil analysis test (659E00100) | EACH | 2 | $275.00 | $100.00 | $250.00 | $500.00 | $400.00 | $289.47 |
| 18 | Topsoil (659E00300) | CY | 488 | $79.00 | $40.00 | $65.00 | $96.00 | $51.00 | $75.26 |
| 19 | Seeding and mulching, as per plan (659E10001) | SY | 4,394 | $2.95 | $3.50 | $1.00 | $2.75 | $3.00 | $4.63 |
| 20 | Commercial fertilizer (659E20000) | TON | 0.62 | $1,700.00 | $600.00 | $1,125.00 | $1,250.00 | $1,500.00 | $2,894.74 |
| 21 | Lime (659E31000) | ACRE | 0.91 | $1,100.00 | $50.00 | $1,625.00 | $1,250.00 | $1.00 | $1,389.47 |
| 22 | Water (659E35000) | MGAL | 25 | $150.00 | $25.00 | $150.00 | $65.00 | $25.00 | $70.53 |
| 23 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,100.00 | $3,000.00 | $5,000.00 | $2,800.00 | $2,800.00 | $2,894.74 |
| 24 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,500.00 | $500.00 | $15,000 | $4,960.00 | $4,494.00 | $5,789.47 |
| 25 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $7,500.00 | $500.00 | $5,000.00 | $5,210.00 | $3,846.53 | $4,515.79 |
| 26 | Erosion control, as per plan (832E30001) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | 12" conduit, type B (611E04400) | FT | 42 | $51.00 | $120.00 | $500.00 | $117.00 | $400.00 | $202.63 |
| 28 | 15" conduit, type B (611E05900) | FT | 30 | $60.00 | $75.00 | $275.00 | $135.00 | $450.00 | $220.00 |
| 29 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,800.00 | $2,500.00 | $3,500.00 | $4,380.00 | $4,500.00 | $3,357.89 |
| 30 | Catch basin adjusted to grade (611E98630) | EACH | 6 | $950.00 | $650.00 | $1,250.00 | $1,600.00 | $500.00 | $1,621.05 |
| 31 | Catch basin reconstructed to grade (611E98634) | EACH | 2 | $1,300.00 | $750.00 | $2,000.00 | $2,195.00 | $4,500.00 | $2,547.37 |
| 32 | Manhole adjusted to grade (611E99654) | EACH | 1 | $470.00 | $650.00 | $1,250.00 | $1,605.00 | $750.00 | $2,894.74 |
| 33 | Special - miscellaneous metal (611E99820) | LB | 10,000 | $2.65 | $2.00 | $3.00 | $0.75 | $3.00 | $1.00 |
| 34 | Manufactured water quality structure, type 2 (895E10020) | EACH | 1 | $33,500 | $48,000 | $25,000 | $31,550 | $80,000 | $56,538 |
| 35 | Full depth pavement removal and rigid replacement, type 1, class QC MS (255E15000) | SY | 72 | $210.00 | $170.00 | $150.00 | $250.00 | $220.00 | $94.32 |
| 36 | Full depth pavement sawing (255E20000) | FT | 104 | $2.75 | $3.00 | $3.00 | $1.80 | $3.00 | $6.95 |
| 37 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 6 | $1,600.00 | $500.00 | $750.00 | $1,070.00 | $1,500.00 | $2,315.79 |
| 38 | Aggregate base, as per plan (304E20001) | CY | 171 | $80.00 | $85.00 | $125.00 | $86.75 | $240.00 | $149.37 |
| 39 | Tack coat, 702.13 (407E13900) | GAL | 8 | $3.50 | $20.00 | $3.00 | $5.25 | $5.00 | $11.58 |
| 40 | Non-tracking tack coat (407E20000) | GAL | 2 | $3.50 | $20.00 | $3.00 | $5.00 | $5.00 | $11.58 |
| 41 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 3 | $3,200.00 | $700.00 | $525.00 | $1,290.00 | $2,600.00 | $5,789.47 |
| 42 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 4 | $1,600.00 | $700.00 | $525.00 | $680.00 | $2,600.00 | $5,789.47 |
| 43 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 9 | $1,300.00 | $700.00 | $575.00 | $1,180.00 | $500.00 | $1,157.89 |
| 44 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 1,420 | $95.00 | $110.00 | $75.00 | $135.00 | $100.00 | $156.32 |
| 45 | Curb, type 6 (609E26000) | FT | 25 | $45.00 | $40.00 | $35.00 | $100.00 | $115.00 | $115.79 |
| 46 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 8 | $475.00 | $650.00 | $1,250.00 | $1,600.00 | $750.00 | $2,894.74 |
| 47 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 9 | $365.00 | $300.00 | $500.00 | $1,130.00 | $450.00 | $926.32 |
| 48 | Service box adjusted to grade, as per plan (638E10901) | EACH | 1 | $365.00 | $200.00 | $500.00 | $450.00 | $375.00 | $1,146.32 |
| 49 | Ground mounted support, no. 3 post (630E03100) | FT | 72 | $16.00 | $15.00 | $14.50 | $15.00 | $24.45 | $34.74 |
| 50 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 2 | $600.00 | $550.00 | $375.00 | $550.00 | $419.29 | $578.95 |
| 51 | Sign support assembly, pole mounted (630E79500) | EACH | 4 | $135.00 | $125.00 | $130.00 | $125.00 | $130.00 | $144.74 |
| 52 | Sign, flat sheet (630E80100) | SF | 37 | $19.00 | $18.00 | $28.09 | $18.00 | $28.00 | $34.74 |
| 53 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $100.00 | $95.00 | $23.10 | $95.00 | $23.00 | $86.84 |
| 54 | Removal of pole mounted sign and reerection (630E87520) | EACH | 3 | $135.00 | $125.00 | $55.12 | $125.00 | $55.00 | $162.11 |
| 55 | Removal of pavement marking (642E30000) | FT | 112 | $21.00 | $20.00 | $19.00 | $20.00 | $10.00 | $17.37 |
| 56 | Removal of pavement marking (642E30020) | EACH | 3 | $275.00 | $250.00 | $150.00 | $250.00 | $50.00 | $63.68 |
| 57 | Stop line (644E00500) | FT | 81 | $10.50 | $10.00 | $12.00 | $10.00 | $9.00 | $11.58 |
| 58 | Crosswalk line, 12" (644E00620) | FT | 887 | $5.50 | $5.00 | $6.00 | $5.00 | $7.00 | $9.26 |
| 59 | Crosswalk line, 24" (644E00630) | FT | 230 | $10.00 | $9.50 | $8.75 | $9.50 | $9.00 | $11.58 |
| 60 | Lane arrow (644E01300) | EACH | 3 | $145.00 | $135.00 | $150.00 | $135.00 | $120.00 | $144.74 |
| 61 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 169 | $9.00 | $8.50 | $8.50 | $8.50 | $14.50 | $28.95 |
| 62 | Conduit, 3", 725.051, as per plan (625E25505) | FT | 4 | $11.00 | $10.00 | $10.00 | $10.00 | $37.00 | $34.74 |
| 63 | Conduit, jacked or drilled, 4" (625E25900) | FT | 53 | $124.25 | $115.00 | $115.00 | $115.00 | $100.00 | $127.37 |
| 64 | Trench (625E29000) | FT | 183 | $17.00 | $15.00 | $15.00 | $15.00 | $20.00 | $38.21 |
| 65 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,000.00 | $1,000.00 | $950.00 | $950.00 | $1,600.00 | $1,852.63 |
| 66 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,350.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,750.00 | $2,142.11 |
| 67 | Ground rod, as per plan (625E32001) | EACH | 8 | $350.00 | $300.00 | $300.00 | $300.00 | $315.00 | $405.26 |
| 68 | Underground warning/marking tape, as per plan (625E36011) | FT | 183 | $4.00 | $3.50 | $3.50 | $3.50 | $1.50 | $4.63 |
| 69 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $750.00 | $645.00 | $645.00 | $645.00 | $875.00 | $1,736.84 |
| 70 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 8 | $300.00 | $275.00 | $275.00 | $275.00 | $320.50 | $984.21 |
| 71 | Signal cable, 2 conductor, no. 14 AWG (632E40200) | FT | 1,686 | $1.75 | $1.75 | $1.60 | $1.60 | $3.25 | $5.79 |
| 72 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,711 | $2.85 | $2.75 | $2.55 | $2.55 | $4.90 | $6.95 |
| 73 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 515 | $3.65 | $3.25 | $3.25 | $3.25 | $5.00 | $8.11 |
| 74 | Signal support foundation, as per plan (632E64011) | EACH | 2 | $8,775.00 | $8,200.00 | $8,200.00 | $8,200.00 | $6,070.00 | $11,579 |
| 75 | Pedestal foundation (632E64020) | EACH | 5 | $1,500.00 | $1,300.00 | $1,300.00 | $1,300.00 | $1,165.00 | $2,894.74 |
| 76 | Power cable, 3 conductor, no. 8 AWG (632E67300) | FT | 13 | $6.50 | $6.00 | $6.00 | $6.00 | $24.00 | $17.37 |
| 77 | Service cable, 3 conductor, no. 8 AWG (632E69700) | FT | 30 | $6.50 | $6.00 | $6.00 | $6.00 | $12.65 | $17.37 |
| 78 | Power service, as per plan (632E70001) | EACH | 1 | $4,000.00 | $3,800.00 | $3,800.00 | $3,800.00 | $6,015.00 | $6,947.37 |
| 79 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $375.00 | $350.00 | $350.00 | $350.00 | $1,220.00 | $1,273.68 |
| 80 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 2 | $15,000 | $14,000 | $13,750 | $13,750 | $15,515 | $23,158 |
| 81 | Pedestal, 10.7' tall, transformer base, as per plan (632E89921) | EACH | 5 | $2,300.00 | $2,100.00 | $2,100.00 | $2,100.00 | $2,435.00 | $4,052.63 |
| 82 | Signalization, misc.: foundation test hole (632E90400) | EACH | 2 | $1,300.00 | $600.00 | $600.00 | $600.00 | $375.00 | $868.42 |
| 83 | Signalization, misc.: pedestrian hybrid beacon (632E90400) | EACH | 5 | $1,400.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,795.00 | $4,978.95 |
| 84 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $4,000.00 | $3,400.00 | $3,400.00 | $3,400.00 | $1,424.50 | $5,326.32 |
| 85 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,000.00 | $900.00 | $900.00 | $900.00 | $515.00 | $1,968.42 |
| 86 | Uninterruptible power supply (UPS), as per plan (633E74001) | EACH | 1 | $10,500 | $10,000 | $9,700.00 | $9,700.00 | $11,925 | $23,158 |
| 87 | Controller item, misc.: controller, actuated, 8 PH (633E99000) | EACH | 1 | $30,200 | $30,000 | $28,750 | $28,750 | $36,900 | $63,684 |
| 88 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $95.00 | $90.00 | $125.00 | $125.00 | $150.00 | $115.79 |
| 89 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $2,800.00 | $1,000.00 | $800.00 | $900.00 | $850.00 | $1,389.47 |
| 90 | Water (616E10000) | MGAL | 10 | $210.00 | $10.00 | $5.00 | $100.00 | $100.00 | $70.53 |
| 91 | Calcium chloride (616E20000) | TON | 1 | $1,100.00 | $10.00 | $250.00 | $260.00 | $1,350.00 | $1,157.89 |
| 92 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,500.00 | $12,000 | $15,000 | $12,000 | $6,232.87 | $38,280 |
| 93 | Maintaining traffic (614E11000) | LS | 1 | $24,000 | $28,750 | $150,000 | $57,000 | $43,500 | $34,800 |
| 94 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,000.00 | $9,000.00 | $13,955 | $10,000 | $15,250 | $28,947 |
| 95 | Mobilization (624E10000) | LS | 1 | $19,000 | $17,985 | $48,000 | $60,000 | $60,000 | $68,924 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.