ODOT contract 260402 bid tabulation
CUY-Cle Downtown Connector Trl 1 (BIKEWAYS). Let by Ohio DOT on September 17, 2026, CUY. 5 bids received; low bid $1,330,135 by Catts Construction Inc, -2.2% against the engineer's estimate of $1,360,000.
- Owner
- Ohio DOT
- Letting
- 17 SEP 2026
- Pay items
- 132
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Catts Construction Inc | $1,330,135 | Low | -2.0% |
| 2 | Cook Paving & Construction Co Inc | $1,479,698 | +11% | +9.0% |
| 3 | S E T Inc | $1,600,330 | +20% | +18% |
| 4 | Madex Construction Co | $1,699,621 | +28% | +25% |
| 5 | Northeast Ohio Trenching Service Inc | $1,798,242 | +35% | +32% |
Engineer's estimate: $1,360,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Catts Construction Inc | 2. Cook Paving & Construction Co Inc | 3. S E T Inc | 4. Madex Construction Co | 5. Northeast Ohio Trenching Service Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,500.00 | $6,500.00 | $15,000 | $12,469 | $10,000 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 1,977 | $21.00 | $30.00 | $28.00 | $29.84 | $40.00 |
| 3 | Walk removed, as per plan (202E30001) | SF | 7,816 | $2.00 | $2.00 | $2.00 | $4.71 | $3.00 |
| 4 | Curb removed, as per plan (202E32001) | FT | 2,044 | $5.00 | $10.00 | $5.00 | $10.41 | $5.00 |
| 5 | Pipe removed (202E34900) | FT | 23 | $50.00 | $25.00 | $106.00 | $70.53 | $40.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 124 | $50.00 | $55.00 | $135.00 | $70.53 | $35.00 |
| 7 | Catch basin removed (202E58100) | EACH | 3 | $500.00 | $400.00 | $1,084.00 | $601.65 | $950.00 |
| 8 | Monument assembly removed (202E60010) | EACH | 2 | $30.00 | $200.00 | $866.00 | $405.26 | $300.00 |
| 9 | Excavation (203E10000) | CY | 770 | $41.00 | $60.00 | $80.00 | $34.74 | $45.00 |
| 10 | Embankment (203E20000) | CY | 1,011 | $38.00 | $60.00 | $45.00 | $39.37 | $55.00 |
| 11 | Subgrade compaction (204E10000) | SY | 1,565 | $1.00 | $3.00 | $10.00 | $4.63 | $5.00 |
| 12 | Proof rolling (204E45000) | HR | 8 | $150.00 | $150.00 | $850.00 | $173.68 | $200.00 |
| 13 | Cement (206E10500) | TON | 13 | $325.00 | $250.00 | $700.00 | $289.47 | $230.00 |
| 14 | Curing coat (206E11000) | SY | 412 | $3.00 | $2.00 | $4.00 | $3.47 | $3.00 |
| 15 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 412 | $73.00 | $55.00 | $76.00 | $46.32 | $40.00 |
| 16 | 6" concrete walk, as per plan (608E13001) | SF | 4,906 | $11.25 | $12.50 | $9.00 | $18.53 | $19.00 |
| 17 | Curb ramp, as per plan (608E52001) | SF | 2,020 | $22.00 | $25.00 | $24.00 | $27.79 | $32.00 |
| 18 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 5 | $275.00 | $900.00 | $300.00 | $1,736.84 | $500.00 |
| 19 | Monument, misc.: city of cleveland centerline monu (623E40900) | EACH | 1 | $1,000.00 | $1,200.00 | $2,000.00 | $1,736.84 | $850.00 |
| 20 | Monument, misc.: city of cleveland monument box (623E40900) | EACH | 1 | $950.00 | $1,200.00 | $1,200.00 | $1,736.84 | $750.00 |
| 21 | Monument, misc.: monument referencing (623E40900) | EACH | 5 | $250.00 | $175.00 | $525.00 | $1,157.89 | $500.00 |
| 22 | Soil analysis test (659E00100) | EACH | 2 | $1.00 | $250.00 | $275.00 | $89.47 | $350.00 |
| 23 | Topsoil (659E00300) | CY | 376 | $90.00 | $60.00 | $60.00 | $81.05 | $62.00 |
| 24 | Seeding and mulching (659E10000) | SY | 3,377 | $2.25 | $3.50 | $3.00 | $4.63 | $3.00 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.48 | $1.00 | $500.00 | $850.00 | $2,315.79 | $1,260.00 |
| 26 | Lime (659E31000) | ACRE | 0.70 | $1.00 | $1,000.00 | $250.00 | $1,157.89 | $1,820.00 |
| 27 | Erosion control (832E30000) | EACH | 24,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | 6" base pipe underdrains with geotextile fabric, as per plan (605E14021) | FT | 1,115 | $16.00 | $30.00 | $30.00 | $27.79 | $28.00 |
| 29 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 110 | $25.00 | $55.00 | $40.00 | $46.32 | $28.00 |
| 30 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 10 | $1,050.00 | $1,200.00 | $3,200.00 | $1,822.85 | $1,000.00 |
| 31 | Catch basin, misc.:CB-1, city of cleveland standar (611E98690) | EACH | 3 | $6,285.00 | $5,700.00 | $7,000.00 | $4,052.63 | $7,850.00 |
| 32 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 6 | $1,050.00 | $950.00 | $3,000.00 | $2,084.21 | $1,100.00 |
| 33 | Special - miscellaneous metal (611E99820) | LB | 11,775 | $1.25 | $1.50 | $3.00 | $1.00 | $4.00 |
| 35 | 12" conduit, type B (611E04400) | FT | 111 | $350.00 | $230.00 | $330.00 | $89.53 | $200.00 |
| 36 | Pavement planing, asphalt concrete, as per plan (2 (254E01001) | SY | 532 | $10.50 | $9.50 | $9.00 | $8.11 | $10.00 |
| 37 | Pavement planing, asphalt concrete, as per plan (3 (254E01001) | SY | 3,828 | $7.00 | $9.50 | $9.00 | $6.95 | $6.50 |
| 38 | Aggregate base, as per plan (304E20001) | CY | 330 | $100.00 | $130.00 | $160.00 | $115.79 | $110.00 |
| 39 | 9" concrete base, class QC 1P (305E13010) | SY | 456 | $145.00 | $120.00 | $100.00 | $155.16 | $165.00 |
| 40 | Tack coat, 702.13 (407E13900) | GAL | 482 | $4.50 | $8.00 | $5.00 | $6.95 | $4.00 |
| 41 | Non-tracking tack coat (407E20000) | GAL | 559 | $4.50 | $4.00 | $5.00 | $3.47 | $4.00 |
| 42 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 27 | $522.00 | $515.00 | $385.00 | $1,071.70 | $450.00 |
| 43 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 168 | $555.00 | $420.00 | $325.00 | $648.42 | $475.00 |
| 44 | Asphalt concrete intermediate course, type 1, (449), as per plan (441E70201) | CY | 5 | $1,050.00 | $400.00 | $1,000.00 | $752.63 | $1,000.00 |
| 45 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 274 | $340.00 | $345.00 | $235.00 | $405.26 | $265.00 |
| 46 | 6" non-reinforced concrete pavement, class QC 1P, as per plan (452E10011) | SY | 12 | $155.00 | $105.00 | $130.00 | $173.68 | $130.00 |
| 47 | 12" non-reinforced concrete pavement, class QC 1P with QC/QA (452E15020) | SY | 378 | $150.00 | $170.00 | $150.00 | $176.00 | $220.00 |
| 48 | Curb, type 2-A (609E14000) | FT | 176 | $15.00 | $35.00 | $14.00 | $63.68 | $45.00 |
| 49 | Curb, type 6 (609E26000) | FT | 1,258 | $40.00 | $57.00 | $50.00 | $57.89 | $63.00 |
| 50 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $750.00 | $950.00 | $800.00 | $2,084.21 | $2,000.00 |
| 51 | 6" fire hydrant, as per plan (638E10201) | EACH | 2 | $9,950.00 | $10,500 | $12,000 | $15,053 | $11,650 |
| 52 | Fire hydrant removed (638E10480) | EACH | 2 | $195.00 | $1,800.00 | $525.00 | $1,736.84 | $2,400.00 |
| 53 | Valve box adjusted to grade (638E10800) | EACH | 3 | $850.00 | $950.00 | $300.00 | $578.95 | $500.00 |
| 54 | Service box adjusted to grade (638E10900) | EACH | 1 | $151.00 | $300.00 | $175.00 | $578.95 | $800.00 |
| 55 | Water work, misc.:6" water main dip class 52 push (638E98600) | FT | 35 | $337.00 | $325.00 | $425.00 | $463.16 | $334.00 |
| 56 | Ground mounted support, no. 3 post (630E03100) | FT | 135 | $22.00 | $16.00 | $14.00 | $32.42 | $30.00 |
| 57 | Sign, flat sheet (630E80100) | SF | 71.40 | $48.00 | $35.00 | $32.00 | $34.74 | $31.00 |
| 58 | Sign, double faced, street name (630E80500) | EACH | 2 | $322.00 | $235.00 | $210.00 | $318.42 | $285.00 |
| 59 | Removal of ground mounted sign and disposal (630E84900) | EACH | 22 | $40.00 | $29.00 | $26.00 | $34.74 | $32.00 |
| 60 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $241.00 | $175.00 | $155.00 | $115.79 | $79.00 |
| 61 | Removal of ground mounted post support and disposal (630E86002) | EACH | 14 | $40.00 | $29.00 | $26.00 | $52.11 | $36.00 |
| 62 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $88.00 | $65.00 | $60.00 | $34.74 | $26.00 |
| 63 | Removal of pavement marking (642E30000) | FT | 496 | $5.00 | $3.50 | $3.00 | $6.95 | $6.00 |
| 64 | Removal of pavement marking (642E30020) | EACH | 10 | $259.00 | $190.00 | $165.00 | $115.79 | $94.00 |
| 65 | Stop line (644E00500) | FT | 116 | $16.00 | $11.00 | $11.00 | $11.58 | $11.00 |
| 66 | Crosswalk line, 12" (644E00620) | FT | 196 | $11.50 | $8.00 | $7.00 | $8.11 | $8.00 |
| 67 | Crosswalk line, 12", as per plan (644E00621) | FT | 301 | $11.50 | $8.00 | $7.00 | $8.11 | $8.00 |
| 68 | Crosswalk line, 24", as per plan (644E00631) | FT | 418 | $16.00 | $11.00 | $11.00 | $11.58 | $11.00 |
| 69 | Transverse/diagonal line (644E00700) | FT | 26 | $16.00 | $11.00 | $11.00 | $12.74 | $12.00 |
| 70 | Lane arrow (644E01300) | EACH | 12 | $194.00 | $140.00 | $125.00 | $173.68 | $140.00 |
| 71 | Edge line, 4" (646E10000) | MI | 0.03 | $136,900 | $100,000 | $90,000 | $8,105.33 | $7,000.00 |
| 72 | Lane line, 4" (646E10100) | MI | 0.08 | $32,211 | $23,000 | $21,000 | $3,473.63 | $3,000.00 |
| 73 | Center line (646E10200) | MI | 0.10 | $28,990 | $20,000 | $19,000 | $16,211 | $15,000 |
| 74 | Channelizing line, 8" (646E10300) | FT | 195 | $8.00 | $5.50 | $5.00 | $4.63 | $4.00 |
| 75 | Stop line (646E10400) | FT | 45 | $93.00 | $23.00 | $21.00 | $34.74 | $31.00 |
| 76 | Crosswalk line, 12", as per plan (646E10511) | FT | 119 | $24.00 | $16.00 | $16.00 | $16.21 | $15.00 |
| 77 | Crosswalk line, 24", as per plan (646E10521) | FT | 182 | $32.00 | $23.00 | $21.00 | $19.68 | $18.00 |
| 78 | Transverse/diagonal line (646E10600) | FT | 29 | $32.00 | $23.00 | $21.00 | $32.42 | $30.00 |
| 79 | Lane arrow (646E20300) | EACH | 2 | $402.00 | $275.00 | $275.00 | $463.16 | $345.00 |
| 80 | Dotted line, 4" (646E20502) | FT | 99 | $11.50 | $8.00 | $7.00 | $1.74 | $2.00 |
| 81 | Conduit, 2", 725.051, as per plan (625E25409) | FT | 132 | $12.00 | $12.50 | $7.00 | $12.74 | $12.00 |
| 82 | Conduit, 4", 725.051, as per plan (625E25605) | FT | 66 | $25.00 | $33.00 | $12.00 | $34.74 | $34.00 |
| 83 | Trench (625E29000) | FT | 198 | $13.00 | $17.00 | $20.00 | $18.53 | $20.00 |
| 84 | Pull box, misc.: 17" X 30" (625E31600) | EACH | 1 | $1,521.00 | $1,250.00 | $1,400.00 | $1,273.68 | $1,250.00 |
| 85 | Ground rod, as per plan (625E32001) | EACH | 7 | $415.00 | $417.00 | $500.00 | $434.21 | $375.00 |
| 86 | Underground warning/marking tape, as per plan (625E36011) | FT | 198 | $2.50 | $4.00 | $1.00 | $4.63 | $4.00 |
| 87 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 2 | $677.00 | $650.00 | $475.00 | $694.74 | $570.00 |
| 88 | Sign, flat sheet (630E80100) | SF | 18.75 | $22.00 | $21.00 | $26.00 | $34.74 | $30.00 |
| 89 | Sign, street name, as per plan (630E80511) | EACH | 1 | $523.00 | $500.00 | $116.00 | $578.95 | $450.00 |
| 90 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 2 | $1,697.00 | $1,250.00 | $1,300.00 | $1,273.68 | $1,150.00 |
| 91 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $1,183.00 | $850.00 | $750.00 | $868.42 | $720.00 |
| 92 | Covering of vehicular signal head (632E25000) | EACH | 4 | $55.00 | $180.00 | $65.00 | $231.58 | $160.00 |
| 93 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $55.00 | $120.00 | $50.00 | $144.74 | $110.00 |
| 94 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 10 | $489.00 | $1,400.00 | $350.00 | $1,447.37 | $1,230.00 |
| 95 | Detector loop (632E26500) | EACH | 3 | $2,350.00 | $2,150.00 | $2,100.00 | $2,200.00 | $1,830.00 |
| 96 | Signal cable, 2 conductor, no. 14 AWG (632E40200) | FT | 1,437 | $3.25 | $2.25 | $2.00 | $2.32 | $3.00 |
| 97 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,284 | $4.50 | $3.50 | $3.00 | $3.47 | $4.00 |
| 98 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 360 | $5.00 | $4.00 | $5.00 | $4.63 | $4.00 |
| 99 | Signal support foundation, as per plan (632E64011) | EACH | 1 | $9,658.00 | $9,300.00 | $8,000.00 | $9,263.16 | $8,300.00 |
| 100 | Pedestal foundation (632E64020) | EACH | 6 | $2,281.00 | $2,925.00 | $1,200.00 | $2,894.74 | $2,500.00 |
| 101 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 225 | $3.25 | $1.75 | $3.00 | $2.32 | $2.00 |
| 102 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 1 | $21,676 | $20,000 | $20,000 | $20,263 | $18,500 |
| 103 | Pedestal, 10.7' tall, transformer base, as per plan (632E89921) | EACH | 6 | $3,114.00 | $2,500.00 | $2,500.00 | $2,605.26 | $2,500.00 |
| 104 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 2 | $1,493.41 | $4,000.00 | $2,500.00 | $4,168.42 | $3,600.00 |
| 105 | Reuse of vehicular signal head (632E90200) | EACH | 2 | $788.00 | $500.00 | $600.00 | $578.95 | $470.00 |
| 106 | Reuse of controller (632E90212) | EACH | 2 | $829.00 | $3,300.00 | $1,500.00 | $3,357.89 | $2,900.00 |
| 107 | Signalization, misc.:foundation test hole (632E90400) | EACH | 8 | $898.00 | $715.00 | $500.00 | $694.74 | $850.00 |
| 108 | Deciduous tree, 1-1/2" caliperamelanchier lavis, A (661E40060) | EACH | 4 | $497.00 | $480.00 | $600.00 | $1,157.89 | $430.00 |
| 109 | Deciduous tree, 2" caliperplatanus occidentalis AM (661E40080) | EACH | 13 | $577.00 | $560.00 | $650.00 | $1,157.89 | $480.00 |
| 110 | Special - 6' metal bench, complete in place (690E98000) | EACH | 1 | $4,176.00 | $5,000.00 | $6,500.00 | $5,210.53 | $5,000.00 |
| 111 | Special - bike repair station, complete in place (690E98000) | EACH | 1 | $3,528.00 | $2,800.00 | $4,500.00 | $3,473.68 | $3,400.00 |
| 112 | Special - waste receptacle, complete in place (690E98000) | EACH | 1 | $3,556.00 | $3,300.00 | $4,500.00 | $3,473.68 | $3,500.00 |
| 113 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $111.00 | $85.00 | $90.00 | $115.79 | $65.00 |
| 114 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $295.00 | $200.00 | $300.00 | $118.95 | $150.00 |
| 115 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.08 | $64,423 | $45,000 | $42,000 | $17,368 | $14,300 |
| 116 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 0.59 | $4,831.00 | $3,000.00 | $3,500.00 | $3,473.68 | $2,400.00 |
| 117 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.12 | $64,423 | $45,000 | $42,000 | $10,421 | $8,500.00 |
| 118 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 30 | $6.50 | $4.50 | $4.00 | $4.63 | $4.00 |
| 119 | Work zone stop line, class I, 642 paint (614E26200) | FT | 117 | $11.25 | $8.00 | $7.00 | $19.68 | $18.00 |
| 120 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 3 | $161.00 | $110.00 | $105.00 | $173.68 | $140.00 |
| 121 | Water (616E10000) | MGAL | 10 | $251.00 | $150.00 | $70.00 | $57.89 | $305.00 |
| 122 | Calcium chloride (616E20000) | TON | 1 | $31.00 | $1,500.00 | $1,200.00 | $578.95 | $1,500.00 |
| 123 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $1,500.00 | $3,500.00 | $20,000 | $6,409.64 | $5,500.00 |
| 124 | Epoxy coated steel reinforcement (509E10000) | LB | 424 | $10.00 | $5.00 | $5.00 | $6.95 | $8.00 |
| 125 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 32 | $41.00 | $15.00 | $40.00 | $52.11 | $22.00 |
| 126 | Class QC2 concrete, sidewalk (511E51510) | CY | 2 | $1,500.00 | $980.00 | $2,500.00 | $4,052.63 | $1,175.00 |
| 127 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 6 | $257.00 | $165.00 | $50.00 | $173.68 | $205.00 |
| 128 | 1/4" preformed expansion joint filler (516E13000) | SF | 9 | $98.00 | $10.00 | $25.00 | $10.42 | $17.00 |
| 129 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,300 | $15,000 | $29,730 | $56,254 | $26,000 |
| 130 | Maintaining traffic (614E11000) | LS | 1 | $50,000 | $78,000 | $138,000 | $76,383 | $75,000 |
| 131 | Field office, type B, as per plan (619E16011) | MNTH | 8 | $3,155.00 | $2,000.00 | $2,000.00 | $1,136.84 | $2,200.00 |
| 132 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $30,000 | $40,000 | $55,526 | $25,000 |
| 133 | Mobilization (624E10000) | LS | 1 | $15,000 | $50,000 | $80,000 | $63,687 | $284,504 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 17, 2026. Compiled by Mirage Metrics.