A P O'Horo Company: ODOT bid record

A P O'Horo Company submitted 24 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 14 of them (58%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$28,154,000
Latest bid
12 NOV 2026
Data through
12 NOV 2026
24Bids
14Low bids
58Win rate, percent
+6.0%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20205480%
2021200%
2022300%
20236467%
202422100%
20254250%
202622100%
A P O'Horo Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
COL5360%
TRU5240%
MAH4250%
ATB33100%
JEF3267%
POR3267%
LAK100%
A P O'Horo Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2727 (100%)$1.00$1.00
Topsoil659E00300CY2414 (58%)$30.00$45.00
Portable changeable message sign, as per plan614E18601SNMT1514 (93%)$500.00$950.00
Water659E35000MGAL2512 (48%)$1.00$1.00
Guardrail removed202E38000FT1812 (67%)$2.00$2.50
Porous backfill with geotextile fabric518E21200CY1712 (71%)$85.00$125.00
Excavation203E10000CY2711 (41%)$22.00$27.00
Geotextile fabric204E50000SY2111 (52%)$2.00$2.12
Sign, flat sheet630E80100SF1811 (61%)$22.50$24.00
Guardrail, type MGS606E15050FT1311 (85%)$20.40$22.73
Center line646E10200MI1311 (85%)$15,567$12,144
2" preformed expansion joint filler516E13900SF1211 (92%)$8.50$12.00
A P O'Horo Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

A P O'Horo Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260512TRUTRU-SR 534-22.36/26.04 (BRIDGE REPAIR)1 of 5$1,613,000Low, 1.0% under the second
11 JUN 2026260282ATBATB-/TRU-SR 7/VAR-18.62/VAR (PART 1, 2, 3) (BRIDGE REPAIR)1 of 4$3,814,000Low, 2.0% under the second
23 OCT 2025250490COLCOL-SR 164-01.66 (CULVERT REPLACEMENT)4 of 9$491,000+3.0%
09 OCT 2025250467MAHMAH-US 422-03.13 (BRIDGE REPAIR)1 of 4$2,084,000Low, 24% under the second
25 SEP 2025250441PORPOR-SR 305-02.43/02.58 (BRIDGE REPAIR)1 of 9$1,212,000Low, 4.0% under the second
28 AUG 2025250398TRUTRU-SR 46-07.81 (PARTS 1-4) (INTERSECTION)2 of 6$6,417,000+3.0%
12 SEP 2024240419MAHMAH-IR 680-09.30 Noise Walls (NOISE WALLS)1 of 7$3,984,000Low, 2.0% under the second
04 APR 2024240168COLCOL-US 30-34.07 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 3$3,748,000Low, 12% under the second
27 APR 2023230252COLCOL-Park Drive Bridge (BRIDGE REPLACEMENT (1 BRIDGE))1 of 2$936,000Low, 10% under the second
27 APR 2023230261JEFJEF-SR 164-08.80 (SLIDE REPAIR)5 of 5$598,000+40%
23 FEB 2023233001ATBATB-SR 534-12.06 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 3$1,833,000Low, 3.0% under the second
26 JAN 2023230059PORPOR-IR 76-20.05 Slide (SLIDE REPAIR)1 of 5$2,454,000Low, 6.0% under the second
26 JAN 2023230061TRUTRU-US 62-07.47 (INTERSECTION)1 of 5$1,929,000Low, 12% under the second
26 JAN 2023230071MAHMAH-IR 76-06.04 (INTERCHANGE)2 of 4$1,279,000+5.0%
12 MAY 2022220299MAHMAH-McGaffney St Extension Ph 2 (NEW CONSTRUCTION)2 of 7$383,000+11%
28 APR 2022220276LAKLAK-SR 2-11.41 Deck (BRIDGE REPAIR)2 of 3$1,684,000+2.0%
13 JAN 2022223001TRUTRU-SR 46-25.07 (BRIDGE REPAIR)2 of 5$893,893+4.0%
11 FEB 2021210100TRUTRU-Warner Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))2 of 7$1,244,000+6.0%
28 JAN 2021210075PORPOR-D04 POR IR-76 RA Parking Lots (SPOT SAFETY)5 of 12$3,620,000+12%
30 JUL 2020200411JEFJEF-SR 164-09.40 (SLIDE REPAIR)1 of 9$209,000Low, 19% under the second
18 JUN 2020200351JEFJEF-SR 213-18.43 (BRIDGE REPAIR)1 of 5$634,000Low, 15% under the second
27 FEB 2020200048COLCOL-SR 7-26.34 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 4$2,417,000Low, 17% under the second
13 FEB 2020200045ATBATB-US 20/SR 45-19.13/08.28 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 8$1,287,000Low, 4.0% under the second
23 JAN 2020207002COLCOL-US 30-33.26 (SLIDE REPAIR)8 of 11$676,000+102%
A P O'Horo Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy