ODOT contract 260512 bid tabulation
TRU-SR 534-22.36/26.04 (BRIDGE REPAIR). Let by Ohio DOT on November 12, 2026, TRU. 5 bids received; low bid $1,613,000 by A P O'Horo Company, -2.2% against the engineer's estimate of $1,650,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 118
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A P O'Horo Company | $1,613,000 | Low | -2.0% |
| 2 | Marucci & Gaffney Excavating Co | $1,637,017 | +1.0% | -1.0% |
| 3 | J D Williamson Construction Co Inc | $1,844,671 | +14% | +12% |
| 4 | S E T Inc | $1,970,364 | +22% | +19% |
| 5 | Perk Company Inc | $2,086,073 | +29% | +26% |
Engineer's estimate: $1,650,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A P O'Horo Company | 2. Marucci & Gaffney Excavating Co | 3. J D Williamson Construction Co Inc | 4. S E T Inc | 5. Perk Company Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,000.00 | $40,000 | $12,000 | $2,000.00 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 1,220 | $10.00 | $18.35 | $12.00 | $10.00 | $47.10 |
| 3 | Guardrail removed (202E38000) | FT | 950 | $5.00 | $5.00 | $2.00 | $5.25 | $6.74 |
| 4 | Anchor assembly removed (202E42206) | EACH | 8 | $200.00 | $200.00 | $160.00 | $210.00 | $613.79 |
| 5 | Removal misc.: inspection well (202E98100) | EACH | 1 | $300.00 | $100.00 | $110.00 | $100.00 | $423.21 |
| 6 | Removal misc.: conduit (202E98200) | FT | 10 | $15.00 | $10.00 | $30.00 | $10.00 | $29.98 |
| 7 | Excavation (203E10000) | CY | 820 | $25.00 | $33.00 | $37.00 | $49.00 | $65.11 |
| 8 | Embankment (203E20000) | CY | 315 | $25.00 | $42.00 | $19.00 | $49.00 | $83.92 |
| 9 | Embankment, as per plan (203E20001) | CY | 30 | $40.00 | $10.00 | $19.00 | $30.00 | $111.31 |
| 10 | Subgrade compaction (204E10000) | SY | 2,022 | $2.00 | $3.00 | $5.00 | $2.25 | $1.83 |
| 11 | Excavation of subgrade (204E13000) | CY | 25 | $35.00 | $20.00 | $45.00 | $55.00 | $58.64 |
| 12 | Granular material, type B (204E30010) | CY | 25 | $80.00 | $50.00 | $85.00 | $100.00 | $125.40 |
| 13 | Proof rolling (204E45000) | HR | 1 | $100.00 | $80.00 | $400.00 | $500.00 | $600.38 |
| 14 | Geotextile fabric (204E50000) | SY | 76 | $3.00 | $3.00 | $7.00 | $2.75 | $4.15 |
| 15 | Reshaping under guardrail, as per plan (209E15001) | STA | 6 | $250.00 | $500.00 | $400.00 | $900.00 | $384.93 |
| 16 | Guardrail, type MGS with long posts (606E15100) | FT | 475 | $28.00 | $28.00 | $30.00 | $29.50 | $28.00 |
| 17 | Rounded end section (606E20050) | EACH | 3 | $75.00 | $75.00 | $100.00 | $79.00 | $75.00 |
| 18 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,650.00 | $2,650.00 | $2,690.00 | $2,800.00 | $2,650.00 |
| 19 | Anchor assembly, MGS type T (606E26550) | EACH | 3 | $1,400.00 | $1,400.00 | $1,450.00 | $1,500.00 | $1,400.00 |
| 20 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 8 | $2,375.00 | $2,375.00 | $2,750.00 | $2,500.00 | $2,375.00 |
| 21 | Special - as-built construction plans (690E20010) | LS | 1 | $500.00 | $2,000.00 | $2,600.00 | $2,000.00 | $5,000.00 |
| 22 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $300.00 | $300.00 | $165.00 | $225.00 | $599.70 |
| 23 | Special - survey control verification (690E98400) | LS | 1 | $1,500.00 | $1,500.00 | $3,750.00 | $6,000.00 | $8,400.00 |
| 24 | Rock channel protection, type C with filter (601E32200) | CY | 1 | $350.00 | $150.00 | $860.00 | $60.00 | $220.61 |
| 25 | Rock channel protection, type B without filter (601E34100) | CY | 150 | $115.00 | $175.00 | $150.00 | $180.00 | $219.86 |
| 26 | Soil analysis test (659E00100) | EACH | 4 | $50.00 | $10.00 | $150.00 | $53.00 | $500.00 |
| 27 | Topsoil (659E00300) | CY | 142 | $35.00 | $69.00 | $75.00 | $80.00 | $100.36 |
| 28 | Seeding and mulching (659E10000) | SY | 1,277 | $3.00 | $4.00 | $2.50 | $3.15 | $3.43 |
| 29 | Commercial fertilizer (659E20000) | TON | 0.18 | $600.00 | $400.00 | $450.00 | $120.00 | $1,321.33 |
| 30 | Lime (659E31000) | ACRE | 0.27 | $0.11 | $40.00 | $30.00 | $1.00 | $1,321.30 |
| 31 | Water (659E35000) | MGAL | 4 | $0.10 | $0.01 | $2.00 | $1.00 | $66.07 |
| 32 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | Aggregate drains (605E31100) | FT | 247 | $22.00 | $40.00 | $18.00 | $21.00 | $25.62 |
| 34 | 8" conduit, type B (611E01800) | FT | 30 | $15.00 | $5.00 | $70.00 | $45.00 | $53.30 |
| 35 | 8" conduit, type E (611E02500) | FT | 15 | $10.00 | $5.00 | $15.00 | $25.00 | $53.31 |
| 36 | 8" conduit, type F (611E02600) | FT | 15 | $10.00 | $5.00 | $30.00 | $25.00 | $53.31 |
| 37 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 10 | $20.00 | $5.00 | $40.00 | $70.00 | $92.64 |
| 38 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 10 | $20.00 | $5.00 | $40.00 | $70.00 | $92.64 |
| 39 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 10 | $20.00 | $5.00 | $45.00 | $70.00 | $92.64 |
| 40 | Inspection well (611E99720) | EACH | 2 | $100.00 | $10.00 | $760.00 | $400.00 | $777.99 |
| 41 | Pavement planing, asphalt concrete, as per plan (T (254E01001) | SY | 398 | $12.00 | $40.00 | $16.00 | $12.50 | $25.00 |
| 42 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 360 | $261.00 | $276.24 | $275.00 | $275.00 | $310.00 |
| 43 | Aggregate base (304E20000) | CY | 346 | $95.00 | $120.00 | $110.00 | $160.00 | $91.15 |
| 44 | Tack coat, 702.13 (407E13900) | GAL | 18 | $10.00 | $3.50 | $10.00 | $10.50 | $50.00 |
| 45 | Non-tracking tack coat (407E20000) | GAL | 346 | $2.00 | $3.05 | $2.00 | $2.10 | $5.00 |
| 46 | Stabilized crushed aggregate (411E10000) | CY | 1 | $300.00 | $150.00 | $520.00 | $310.00 | $885.91 |
| 47 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 190 | $375.00 | $405.52 | $390.00 | $395.00 | $385.00 |
| 48 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 0.05 | $100,000 | $110,000 | $150,000 | $157,500 | $159,000 |
| 49 | Longitudinal joint preparation (874E20000) | FT | 277 | $3.00 | $30.00 | $3.00 | $3.20 | $15.00 |
| 50 | RPM (621E00100) | EACH | 7 | $845.00 | $844.30 | $880.00 | $890.00 | $150.00 |
| 51 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 23 | $13.00 | $12.84 | $15.00 | $13.50 | $13.00 |
| 52 | Ground mounted support, no. 2 post (630E02100) | FT | 84 | $21.00 | $21.03 | $22.00 | $22.00 | $25.00 |
| 53 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 12.50 | $23.00 | $23.24 | $24.00 | $24.50 | $30.00 |
| 54 | Sign, flat sheet (630E80100) | SF | 24 | $27.00 | $27.11 | $28.00 | $28.50 | $25.00 |
| 55 | Sign, flat sheet (630E80100) | SF | 4 | $27.00 | $27.11 | $28.00 | $28.50 | $30.00 |
| 56 | Removal of ground mounted sign and disposal (630E84900) | EACH | 12 | $17.00 | $17.17 | $17.00 | $28.00 | $30.00 |
| 57 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $106.00 | $106.07 | $115.00 | $110.00 | $95.00 |
| 58 | Removal of ground mounted post support and disposal (630E86002) | EACH | 9 | $23.00 | $22.85 | $24.00 | $46.00 | $40.00 |
| 59 | Removal of pavement marking (644E30000) | FT | 285 | $6.75 | $6.75 | $7.00 | $1.50 | $10.00 |
| 60 | Edge line, 6" (646E10010) | MI | 0.28 | $15,430 | $15,430 | $16,000 | $16,200 | $25,000 |
| 61 | Center line (646E10200) | MI | 0.11 | $19,870 | $19,870 | $21,000 | $21,000 | $45,000 |
| 62 | Detour signing (614E12420) | LS | 1 | $15,000 | $10,000 | $10,000 | $20,000 | $10,000 |
| 63 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $500.00 | $1,300.00 | $1,300.00 | $900.00 | $1,356.59 |
| 64 | Water (616E10000) | MGAL | 2 | $10.00 | $1.00 | $5.00 | $10.00 | $120.50 |
| 65 | Calcium chloride (616E20000) | TON | 60 | $250.00 | $5.00 | $10.00 | $20.00 | $266.22 |
| 66 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $100,000 | $66,000 | $90,000 | $90,000 | $58,838 |
| 67 | Approach slab removed (202E22900) | SY | 134 | $25.00 | $35.00 | $120.00 | $58.00 | $44.16 |
| 68 | Wearing course removed (202E23500) | SY | 356 | $10.00 | $10.00 | $13.00 | $17.50 | $9.32 |
| 69 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 8,505 | $1.40 | $1.50 | $1.40 | $1.45 | $1.61 |
| 70 | Uncoated steel reinforcement (509E25000) | LB | 131 | $2.00 | $1.50 | $2.10 | $1.65 | $2.57 |
| 71 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 48 | $30.00 | $65.00 | $30.00 | $32.00 | $53.33 |
| 72 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 49 | $1,000.00 | $1,340.00 | $1,300.00 | $1,250.00 | $1,807.50 |
| 73 | Class QC1 concrete, abutment (511E45710) | CY | 1 | $2,400.00 | $1,000.00 | $5,000.00 | $1,800.00 | $8,590.27 |
| 74 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 65 | $39.00 | $50.00 | $37.00 | $30.00 | $57.28 |
| 75 | Concrete repair by epoxy injection (512E10600) | FT | 40 | $196.00 | $100.00 | $100.00 | $68.00 | $150.00 |
| 76 | Type 2 waterproofing (512E33000) | SY | 3 | $200.00 | $40.00 | $160.00 | $70.00 | $221.91 |
| 77 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 35 | $90.00 | $25.00 | $40.00 | $55.00 | $21.87 |
| 78 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 10 | $17,000 | $16,180 | $22,500 | $20,500 | $21,935 |
| 79 | 2" preformed expansion joint filler (516E13900) | SF | 9 | $10.00 | $20.00 | $15.00 | $15.50 | $14.01 |
| 80 | Integral abutment expansion joint seal (516E14014) | FT | 93 | $30.00 | $40.00 | $50.00 | $44.00 | $59.26 |
| 81 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 20 | $25.00 | $30.00 | $60.00 | $65.00 | $191.97 |
| 82 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 40 | $125.00 | $150.00 | $110.00 | $120.00 | $380.95 |
| 83 | Railing (three steel tube bridge railing) (517E70100) | FT | 112 | $476.25 | $480.00 | $500.00 | $500.00 | $499.94 |
| 84 | Porous backfill with geotextile fabric (518E21200) | CY | 17 | $125.00 | $150.00 | $240.00 | $190.00 | $986.36 |
| 85 | Special - steel drip strip (518E22300) | FT | 123.56 | $30.00 | $25.00 | $30.00 | $19.50 | $30.43 |
| 86 | Patching concrete structure (519E11100) | SF | 60 | $225.00 | $100.00 | $100.00 | $117.00 | $139.60 |
| 87 | Reinforced concrete approach slabs (T=12") (526E10000) | SY | 134 | $300.00 | $336.00 | $350.00 | $430.00 | $371.18 |
| 88 | Type B installation (526E90020) | SY | 45 | $90.00 | $80.00 | $70.00 | $104.00 | $257.32 |
| 89 | Structure grounding system (625E33000) | EACH | 1 | $5,000.00 | $12,000 | $13,000 | $14,200 | $13,500 |
| 90 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $115,000 | $76,000 | $95,000 | $100,000 | $54,244 |
| 91 | Approach slab removed (202E22900) | SY | 178 | $25.00 | $33.00 | $70.00 | $61.00 | $44.65 |
| 92 | Wearing course removed (202E23500) | SY | 429 | $10.00 | $10.00 | $13.00 | $20.00 | $9.32 |
| 93 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 11,132 | $1.40 | $1.50 | $1.40 | $1.45 | $1.59 |
| 94 | Uncoated steel reinforcement (509E25000) | LB | 195 | $2.00 | $1.50 | $2.10 | $1.65 | $3.80 |
| 95 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 52 | $30.00 | $65.00 | $30.00 | $31.50 | $53.21 |
| 96 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 64 | $900.00 | $1,150.00 | $1,330.00 | $1,150.00 | $1,585.81 |
| 97 | Class QC1 concrete, abutment (511E45710) | CY | 2 | $1,800.00 | $2,500.00 | $3,000.00 | $1,600.00 | $7,333.20 |
| 98 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 77 | $39.00 | $50.00 | $42.00 | $30.00 | $57.26 |
| 99 | Concrete repair by epoxy injection (512E10600) | FT | 10 | $196.00 | $120.00 | $100.00 | $58.00 | $150.00 |
| 100 | Type 2 waterproofing (512E33000) | SY | 4 | $200.00 | $40.00 | $160.00 | $58.00 | $221.86 |
| 101 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 35 | $90.00 | $25.00 | $40.00 | $55.00 | $21.87 |
| 102 | Prestressed concrete composite box beam bridge members, level 1, CB27-48 (515E12070) | EACH | 10 | $22,000 | $20,100 | $25,000 | $27,000 | $26,947 |
| 103 | 2" preformed expansion joint filler (516E13900) | SF | 19 | $10.00 | $20.00 | $10.00 | $15.00 | $14.06 |
| 104 | Integral abutment expansion joint seal (516E14014) | FT | 99 | $30.00 | $40.00 | $47.00 | $23.00 | $59.70 |
| 105 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 20 | $20.00 | $70.00 | $60.00 | $65.00 | $191.97 |
| 106 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 40 | $125.00 | $150.00 | $115.00 | $130.00 | $380.95 |
| 107 | Railing (three steel tube bridge railing) (517E70100) | FT | 128 | $476.25 | $480.00 | $500.00 | $500.00 | $499.90 |
| 108 | Porous backfill with geotextile fabric (518E21200) | CY | 13 | $125.00 | $150.00 | $310.00 | $260.00 | $1,037.40 |
| 109 | Special - steel drip strip (518E22300) | FT | 138 | $30.00 | $25.00 | $30.00 | $18.00 | $30.43 |
| 110 | Patching concrete structure (519E11100) | SF | 30 | $225.00 | $150.00 | $110.00 | $123.00 | $139.59 |
| 111 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 178 | $300.00 | $343.00 | $350.00 | $450.00 | $348.81 |
| 112 | Type B installation (526E90020) | SY | 52 | $90.00 | $80.00 | $70.00 | $104.00 | $306.92 |
| 113 | Structure grounding system (625E33000) | EACH | 1 | $5,000.00 | $12,000 | $13,000 | $14,000 | $13,500 |
| 114 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $21,152 | $11,000 | $18,500 | $40,000 | $17,000 |
| 115 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $20,000 | $15,000 | $23,000 | $70,000 |
| 116 | Field office, type B (619E16010) | MNTH | 6 | $2,000.00 | $500.00 | $2,100.00 | $1,800.00 | $2,283.22 |
| 117 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $15,000 | $18,500 | $14,000 | $16,000 |
| 118 | Mobilization (624E10000) | LS | 1 | $75,000 | $40,000 | $90,000 | $150,000 | $70,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.