ODOT contract 250398 bid tabulation
TRU-SR 46-07.81 (PARTS 1-4) (INTERSECTION). Let by Ohio DOT on August 28, 2025, TRU. 6 bids received; low bid $6,206,766 by Kirila Contractors Inc, -2.3% against the engineer's estimate of $6,356,000.
- Owner
- Ohio DOT
- Letting
- 28 AUG 2025
- Pay items
- 379
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kirila Contractors Inc | $6,206,766 | Low | -2.0% |
| 2 | A P O'Horo Company | $6,417,000 | +3.0% | +1.0% |
| 3 | S E T Inc | $7,420,000 | +20% | +17% |
| 4 | Shelly & Sands Inc | $7,694,582 | +24% | +21% |
| 5 | Eclipse Co LLC | $8,019,915 | +29% | +26% |
| 6 | Marucci & Gaffney Excavating Co | $8,138,316 | +31% | +28% |
Engineer's estimate: $6,356,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kirila Contractors Inc | 2. A P O'Horo Company | 3. S E T Inc | 4. Shelly & Sands Inc | 5. Eclipse Co LLC | 6. Marucci & Gaffney Excavating Co |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $30,000 | $50,000 | $30,000 | $30,000 | $25,000 | $270,000 |
| 2 | Pavement removed (202E23000) | SY | 8,814 | $20.00 | $18.00 | $20.00 | $13.00 | $28.25 | $20.00 |
| 3 | Walk removed (202E30000) | SF | 8,716 | $0.80 | $2.00 | $3.00 | $1.00 | $1.00 | $4.00 |
| 4 | Curb removed (202E32000) | FT | 1,575 | $1.50 | $2.00 | $6.00 | $5.00 | $8.25 | $4.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 2,860 | $25.00 | $16.00 | $22.00 | $18.00 | $19.00 | $34.00 |
| 6 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 1,347 | $28.00 | $12.00 | $25.00 | $5.00 | $19.50 | $34.00 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 137 | $35.00 | $30.00 | $35.00 | $50.00 | $34.25 | $37.00 |
| 8 | Catch basin removed (202E58100) | EACH | 23 | $350.00 | $250.00 | $1,100.00 | $340.00 | $431.75 | $700.00 |
| 9 | Special - fill and plug existing conduit (202E70000) | FT | 599 | $35.00 | $16.00 | $105.00 | $60.00 | $121.50 | $40.00 |
| 10 | Valve box removed (202E75610) | EACH | 7 | $75.00 | $250.00 | $900.00 | $183.00 | $414.00 | $250.00 |
| 11 | Removal misc.:business sign (202E98100) | EACH | 6 | $950.00 | $1,500.00 | $3,000.00 | $3,100.00 | $859.50 | $1,500.00 |
| 12 | Removal misc.:payphone & bollards (202E98100) | EACH | 1 | $200.00 | $2,000.00 | $1,500.00 | $825.00 | $660.00 | $200.00 |
| 13 | Removal misc.:trench drain (202E98200) | FT | 209 | $5.00 | $9.00 | $10.00 | $40.00 | $6.00 | $30.00 |
| 14 | Removal misc.:brick paver (202E98400) | SF | 136 | $1.00 | $5.00 | $11.00 | $3.00 | $2.50 | $10.00 |
| 15 | Excavation (203E10000) | CY | 1,956 | $20.00 | $30.00 | $25.00 | $32.00 | $63.50 | $35.00 |
| 16 | Embankment (203E20000) | CY | 1,203 | $22.00 | $30.00 | $22.00 | $33.00 | $64.00 | $35.00 |
| 17 | Subgrade compaction (204E10000) | SY | 9,325 | $1.50 | $2.50 | $2.00 | $3.00 | $1.00 | $2.50 |
| 18 | Excavation of subgrade (204E13000) | CY | 100 | $15.00 | $40.00 | $30.00 | $28.00 | $86.50 | $35.00 |
| 19 | Granular material, type B (204E30010) | CY | 100 | $57.00 | $42.00 | $80.00 | $75.00 | $119.75 | $70.00 |
| 20 | Proof rolling (204E45000) | HR | 5 | $200.00 | $275.00 | $200.00 | $350.00 | $333.25 | $125.00 |
| 21 | Geotextile fabric (204E50000) | SY | 300 | $2.00 | $3.00 | $3.00 | $3.00 | $2.50 | $3.25 |
| 22 | 4" concrete walk (608E10000) | SF | 13,806 | $9.75 | $7.50 | $9.00 | $9.00 | $10.00 | $11.00 |
| 23 | 8" concrete walk (608E15000) | SF | 248 | $12.25 | $10.50 | $11.00 | $11.00 | $14.25 | $17.00 |
| 24 | Curb ramp (608E52000) | SF | 1,900 | $26.00 | $21.00 | $22.00 | $26.00 | $24.25 | $39.00 |
| 25 | Monument assembly, type C (623E38500) | EACH | 6 | $2,000.00 | $1,350.00 | $1,100.00 | $1,950.00 | $2,348.25 | $1,750.00 |
| 26 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 3 | $1,500.00 | $1,500.00 | $1,200.00 | $1,600.00 | $1,641.25 | $1,500.00 |
| 27 | Special - survey control verification (690E98400) | LS | 1 | $1,750.00 | $15,000 | $4,000.00 | $2,800.00 | $2,532.50 | $3,250.00 |
| 28 | Soil analysis test (659E00100) | EACH | 2 | $25.00 | $135.00 | $200.00 | $25.00 | $25.25 | $5.00 |
| 29 | Topsoil (659E00300) | CY | 409 | $45.00 | $60.00 | $80.00 | $74.00 | $128.00 | $35.00 |
| 30 | Seeding and mulching (659E10000) | SY | 3,678 | $1.85 | $2.41 | $3.00 | $2.00 | $1.75 | $2.50 |
| 31 | Repair seeding and mulching (659E14000) | SY | 184 | $1.85 | $0.80 | $2.00 | $2.00 | $1.75 | $0.27 |
| 32 | Inter-seeding (659E15000) | SY | 184 | $0.25 | $0.80 | $2.00 | $0.25 | $0.25 | $0.27 |
| 33 | Commercial fertilizer (659E20000) | TON | 0.52 | $300.00 | $858.00 | $1,000.00 | $320.00 | $304.00 | $700.00 |
| 34 | Lime (659E31000) | ACRE | 0.76 | $25.00 | $156.00 | $300.00 | $25.00 | $25.25 | $50.00 |
| 35 | Water (659E35000) | MGAL | 21 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 36 | Mowing (659E40000) | MSF | 9 | $75.00 | $50.00 | $60.00 | $80.00 | $76.00 | $1.00 |
| 37 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,235.00 | $10,000 | $2,500.00 | $2,400.00 | $2,532.50 | $2,500.00 |
| 38 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,584 | $2,500.00 | $13,000 | $14,400 | $17,424 | $26,000 |
| 39 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $18,255 | $2,500.00 | $12,000 | $8,600.00 | $9,245.75 | $16,000 |
| 40 | Erosion control (832E30000) | EACH | 40,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | Special - work involving non-regulated materials (690E65000) | TON | 100 | $25.00 | $86.00 | $85.00 | $172.00 | $173.00 | $90.00 |
| 42 | Special - work involving petroleum contaminated soil (690E65016) | TON | 1,000 | $71.00 | $68.00 | $95.00 | $159.00 | $207.75 | $67.00 |
| 43 | Special - work involving non-regulated water (690E65022) | GAL | 1,000 | $5.50 | $2.00 | $6.00 | $5.50 | $69.25 | $1.00 |
| 44 | Special - work involving regulated water (690E65024) | GAL | 1,000 | $7.00 | $2.00 | $6.00 | $6.00 | $48.50 | $8.00 |
| 45 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 104 | $14.00 | $28.00 | $20.00 | $20.00 | $34.50 | $20.00 |
| 46 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 2,512 | $13.00 | $12.00 | $20.00 | $30.00 | $34.00 | $15.00 |
| 47 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 380 | $18.00 | $25.00 | $25.00 | $40.00 | $35.75 | $20.00 |
| 48 | 6" conduit, type B (611E00900) | FT | 38 | $100.00 | $70.00 | $50.00 | $44.00 | $52.00 | $15.00 |
| 49 | 8" conduit, type B (611E01800) | FT | 10 | $40.00 | $100.00 | $65.00 | $210.00 | $74.50 | $17.00 |
| 50 | 12" conduit, type B (611E04400) | FT | 1,374 | $72.00 | $80.00 | $105.00 | $140.00 | $133.50 | $125.00 |
| 51 | 12" conduit, type C (611E04600) | FT | 196 | $61.00 | $70.00 | $95.00 | $125.00 | $124.25 | $145.00 |
| 52 | 15" conduit, type B (611E05900) | FT | 221 | $75.00 | $85.00 | $115.00 | $140.00 | $155.75 | $175.00 |
| 53 | 18" conduit, type B (611E07400) | FT | 60 | $94.00 | $100.00 | $125.00 | $180.00 | $184.25 | $286.00 |
| 54 | 21" conduit, type B (611E08900) | FT | 141 | $132.00 | $110.00 | $140.00 | $190.00 | $165.75 | $145.00 |
| 55 | 24" conduit, type B (611E10400) | FT | 1,618 | $102.00 | $115.00 | $150.00 | $195.00 | $184.00 | $190.00 |
| 56 | 24" conduit, type C (611E10600) | FT | 23 | $102.00 | $180.00 | $180.00 | $190.00 | $163.25 | $300.00 |
| 57 | 30" conduit, type B (611E13400) | FT | 89 | $137.00 | $145.00 | $185.00 | $230.00 | $206.50 | $400.00 |
| 58 | Catch basin, no. 3 (611E98150) | EACH | 2 | $4,500.00 | $5,000.00 | $4,500.00 | $5,150.00 | $7,352.25 | $6,000.00 |
| 59 | Catch basin, no. 3, as per plan (611E98151) | EACH | 7 | $5,225.00 | $6,000.00 | $7,000.00 | $5,800.00 | $8,086.25 | $7,500.00 |
| 60 | Catch basin, no. 3A (611E98180) | EACH | 14 | $3,335.00 | $4,000.00 | $3,500.00 | $3,900.00 | $5,959.00 | $5,500.00 |
| 61 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 6 | $4,145.00 | $5,000.00 | $5,500.00 | $4,500.00 | $6,518.50 | $6,000.00 |
| 62 | Catch basin, no. 6 (611E98370) | EACH | 5 | $3,800.00 | $4,000.00 | $3,200.00 | $3,500.00 | $5,599.50 | $5,500.00 |
| 63 | Catch basin, no. 6, as per plan (611E98371) | EACH | 5 | $5,115.00 | $5,000.00 | $3,500.00 | $4,300.00 | $6,435.25 | $6,000.00 |
| 64 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $1,900.00 | $2,000.00 | $2,800.00 | $2,850.00 | $5,111.00 | $3,000.00 |
| 65 | Catch basin, no. 2-2C (611E98504) | EACH | 3 | $2,525.00 | $4,000.00 | $3,000.00 | $2,900.00 | $5,411.50 | $5,500.00 |
| 66 | Manhole, no. 3 (611E99574) | EACH | 14 | $4,600.00 | $5,000.00 | $5,800.00 | $5,600.00 | $7,803.50 | $7,500.00 |
| 67 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 18 | $1,750.00 | $1,750.00 | $2,000.00 | $1,850.00 | $1,132.25 | $1,750.00 |
| 68 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 1 | $2,500.00 | $2,500.00 | $4,800.00 | $2,650.00 | $2,011.25 | $2,500.00 |
| 69 | Trench drain, type B with pedestrian grate (839E30100) | FT | 211 | $115.00 | $210.00 | $150.00 | $120.00 | $212.50 | $180.00 |
| 70 | Partial depth pavement repair (441) (251E01000) | SY | 1,250 | $55.00 | $70.00 | $72.00 | $70.00 | $87.75 | $70.00 |
| 71 | Pavement repair (253E01000) | SY | 700 | $125.00 | $147.00 | $150.00 | $147.00 | $149.00 | $147.00 |
| 72 | Pavement planing, asphalt concrete(T=1.5") (254E01000) | SY | 14,100 | $4.00 | $3.25 | $3.50 | $3.25 | $3.25 | $3.25 |
| 73 | Pavement planing, asphalt concrete(T=3") (254E01000) | SY | 11,152 | $7.20 | $6.85 | $7.00 | $6.85 | $7.00 | $6.85 |
| 74 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,822 | $225.00 | $206.00 | $220.00 | $210.00 | $208.75 | $206.00 |
| 75 | Aggregate base (304E20000) | CY | 1,008 | $78.00 | $92.00 | $80.00 | $142.00 | $184.50 | $99.00 |
| 76 | Non-tracking tack coat (407E20000) | GAL | 3,357 | $3.25 | $3.05 | $4.00 | $3.05 | $3.00 | $3.05 |
| 77 | Prime coat, as per plan (408E10001) | GAL | 482 | $3.25 | $3.50 | $4.00 | $3.50 | $3.50 | $3.50 |
| 78 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 583 | $237.00 | $211.00 | $215.00 | $211.00 | $213.75 | $211.00 |
| 79 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 418 | $318.00 | $359.00 | $365.00 | $359.00 | $363.75 | $359.00 |
| 80 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 542 | $255.00 | $192.00 | $195.00 | $192.00 | $194.50 | $192.00 |
| 81 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 101 | $565.00 | $721.00 | $750.00 | $721.00 | $730.25 | $721.00 |
| 82 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 62 | $110.00 | $82.00 | $145.00 | $100.00 | $95.25 | $150.00 |
| 83 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 50 | $116.00 | $87.00 | $215.00 | $100.00 | $101.25 | $125.00 |
| 84 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 996 | $114.00 | $102.00 | $110.00 | $98.00 | $99.25 | $110.00 |
| 85 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 200 | $121.00 | $110.00 | $155.00 | $112.00 | $106.25 | $130.00 |
| 86 | Curb, type 3-A, as per plan (609E20001) | FT | 71 | $53.00 | $40.00 | $65.00 | $48.00 | $45.50 | $55.00 |
| 87 | Curb, type 6 (609E26000) | FT | 4,307 | $30.00 | $28.00 | $28.00 | $25.00 | $22.25 | $28.00 |
| 88 | Curb, misc.:sidewalk curb (609E98000) | FT | 375 | $33.00 | $50.00 | $55.00 | $25.00 | $25.25 | $35.00 |
| 89 | Compacted aggregate, as per plan (617E10101) | CY | 199 | $135.00 | $161.00 | $200.00 | $161.00 | $163.00 | $161.00 |
| 90 | 6" water main ductile iron pipe ansi class 52, mechanical joints and fittings, as per plan (638E00701) | FT | 200 | $252.00 | $225.00 | $240.00 | $370.00 | $240.50 | $383.00 |
| 91 | 10" water main ductile iron pipe ansi class 52, mechanical joints and fittings, as per plan (638E01901) | FT | 107 | $219.00 | $215.00 | $320.00 | $380.00 | $288.75 | $440.00 |
| 92 | 12" water main polyvinyl chloride pipe and fittings, AWWA C900, DR18, as per plan (638E02731) | FT | 533 | $126.00 | $170.00 | $225.00 | $200.00 | $206.75 | $180.00 |
| 93 | Polyethylene encasement (638E06200) | FT | 1,067 | $3.00 | $3.50 | $6.00 | $0.50 | $7.75 | $2.00 |
| 94 | Valve box (638E07608) | EACH | 3 | $425.00 | $700.00 | $1,000.00 | $1,700.00 | $8,726.50 | $850.00 |
| 95 | Fire hydrant removed and disposed of (638E10700) | EACH | 4 | $400.00 | $600.00 | $1,100.00 | $850.00 | $1,643.50 | $1,000.00 |
| 96 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 7 | $1,500.00 | $1,500.00 | $1,500.00 | $1,600.00 | $1,317.00 | $1,500.00 |
| 97 | Service box adjusted to grade (638E10900) | EACH | 8 | $1,500.00 | $350.00 | $1,500.00 | $1,600.00 | $1,063.75 | $1,500.00 |
| 98 | Special - 6" gate valve with valve box(tcse) (638E20538) | EACH | 5 | $2,100.00 | $3,000.00 | $2,500.00 | $1,775.00 | $2,536.00 | $3,000.00 |
| 99 | Special - 6" inserting valve with valve box(tcse) (638E20542) | EACH | 2 | $10,900 | $12,000 | $13,000 | $6,850.00 | $13,040 | $12,000 |
| 100 | Special - 10" gate valve with valve box(tcse) (638E20570) | EACH | 2 | $4,300.00 | $4,500.00 | $5,000.00 | $3,700.00 | $5,124.00 | $4,500.00 |
| 101 | Special - 10" inserting valve with valve box(tcse) (638E20574) | EACH | 2 | $15,500 | $19,000 | $22,000 | $13,450 | $22,129 | $20,500 |
| 102 | Special - 12" inserting valve with valve box(tcse) (638E20590) | EACH | 1 | $17,200 | $24,000 | $28,000 | $11,500 | $59,281 | $26,000 |
| 103 | Special - 6" X 6" tapping sleeve, valve and valve box (638E20690) | EACH | 2 | $7,950.00 | $4,500.00 | $7,000.00 | $3,750.00 | $5,484.75 | $8,500.00 |
| 104 | Special - 10" X 10" tapping sleeve, valve and valve box (638E20702) | EACH | 2 | $7,700.00 | $5,500.00 | $3,000.00 | $3,500.00 | $10,214 | $6,000.00 |
| 105 | Special - 12" X 12" tapping sleeve, valve and valve box (638E20712) | EACH | 1 | $12,200 | $9,500.00 | $12,000 | $7,400.00 | $12,221 | $12,000 |
| 106 | Special - 6" fire hydrant(tcse) (638E20750) | EACH | 4 | $4,800.00 | $6,000.00 | $9,500.00 | $6,475.00 | $7,070.75 | $7,500.00 |
| 107 | Special - install 1" copper water service connection (638E20824) | FT | 263 | $152.00 | $80.00 | $130.00 | $170.00 | $99.00 | $100.00 |
| 108 | Special - install 2" polyethylene water service connection (638E20874) | FT | 81 | $145.00 | $120.00 | $155.00 | $200.00 | $289.00 | $130.00 |
| 109 | Pull box removed (625E31510) | EACH | 1 | $500.00 | $500.00 | $300.00 | $540.00 | $253.25 | $150.00 |
| 110 | Light pole removed for reuse, as per plan (625E75411) | EACH | 2 | $3,500.00 | $3,500.00 | $1,000.00 | $3,750.00 | $3,241.50 | $3,500.00 |
| 111 | RPM (621E00100) | EACH | 29 | $125.00 | $81.55 | $125.00 | $105.00 | $83.25 | $82.00 |
| 112 | RPM (621E00100) | EACH | 20 | $125.00 | $81.55 | $125.00 | $105.00 | $83.25 | $82.00 |
| 113 | Ground mounted support, no. 3 post (630E03100) | FT | 355.60 | $22.50 | $18.00 | $20.00 | $18.00 | $18.25 | $18.00 |
| 114 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 62.20 | $34.25 | $20.00 | $22.00 | $20.00 | $20.50 | $20.00 |
| 115 | Street name sign support, no. 3 post (630E08520) | FT | 23 | $22.50 | $19.00 | $20.00 | $19.00 | $19.50 | $19.00 |
| 116 | Sign post reflector (630E08600) | EACH | 11 | $35.00 | $45.00 | $50.00 | $45.00 | $46.00 | $45.00 |
| 117 | Sign support assembly, pole mounted (630E79500) | EACH | 7 | $125.00 | $185.00 | $200.00 | $185.00 | $188.75 | $185.00 |
| 118 | Sign, flat sheet (630E80100) | SF | 233.20 | $35.00 | $19.00 | $20.00 | $19.00 | $19.50 | $19.00 |
| 119 | Sign, street name (630E80510) | EACH | 12 | $175.00 | $195.00 | $200.00 | $195.00 | $199.00 | $195.00 |
| 120 | Removal of ground mounted sign and disposal (630E84900) | EACH | 36 | $25.00 | $15.00 | $20.00 | $15.00 | $15.25 | $15.00 |
| 121 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $100.00 | $65.00 | $70.00 | $65.00 | $66.25 | $65.00 |
| 122 | Removal of ground mounted post support and disposal (630E86002) | EACH | 33 | $25.00 | $20.00 | $25.00 | $20.00 | $20.50 | $20.00 |
| 123 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $25.00 | $35.00 | $40.00 | $35.00 | $35.75 | $35.00 |
| 124 | Edge line, 6" (646E10010) | MI | 0.09 | $8,750.00 | $6,115.00 | $10,000 | $8,750.00 | $6,238.00 | $6,115.00 |
| 125 | Center line (646E10200) | MI | 0.52 | $7,500.00 | $8,160.00 | $8,000.00 | $7,500.00 | $8,324.00 | $8,160.00 |
| 126 | Channelizing line, 8" (646E10300) | FT | 1,768 | $2.50 | $1.90 | $3.00 | $2.50 | $2.00 | $1.90 |
| 127 | Stop line (646E10400) | FT | 153 | $12.50 | $13.50 | $15.00 | $12.50 | $13.75 | $13.50 |
| 128 | Crosswalk line, 12" (646E10510) | FT | 574 | $12.50 | $9.50 | $15.00 | $12.50 | $9.75 | $9.50 |
| 129 | Crosswalk line, 24" (646E10520) | FT | 70 | $15.00 | $10.50 | $20.00 | $15.00 | $10.75 | $10.50 |
| 130 | Transverse/diagonal line (646E10600) | FT | 230 | $15.00 | $12.00 | $20.00 | $16.00 | $12.25 | $12.00 |
| 131 | Handicap symbol marking (646E10900) | EACH | 1 | $325.00 | $200.00 | $350.00 | $350.00 | $204.00 | $200.00 |
| 132 | Parking lot stall marking (646E20200) | FT | 40 | $12.50 | $5.00 | $15.00 | $13.50 | $5.00 | $5.00 |
| 133 | Lane arrow (646E20300) | EACH | 22 | $250.00 | $225.00 | $300.00 | $265.00 | $229.50 | $225.00 |
| 134 | Conduit, 2", 725.04 (625E25400) | FT | 86 | $25.00 | $25.00 | $25.00 | $27.00 | $20.25 | $25.00 |
| 135 | Conduit, 3", 725.04 (625E25500) | FT | 130 | $35.00 | $35.00 | $40.00 | $37.00 | $30.50 | $35.00 |
| 136 | Conduit, 4", 725.04 (625E25600) | FT | 388 | $45.00 | $45.00 | $50.00 | $45.00 | $49.75 | $45.00 |
| 137 | Trench (625E29000) | FT | 360 | $12.00 | $12.00 | $20.00 | $13.00 | $12.25 | $12.00 |
| 138 | Pull box, 725.08, 24" (625E30706) | EACH | 6 | $1,500.00 | $1,500.00 | $1,200.00 | $1,500.00 | $1,418.25 | $1,500.00 |
| 139 | Ground rod (625E32000) | EACH | 9 | $250.00 | $250.00 | $250.00 | $250.00 | $268.50 | $250.00 |
| 140 | Underground warning/marking tape, as per plan (625E36011) | FT | 360 | $1.00 | $1.00 | $3.00 | $1.00 | $3.00 | $1.00 |
| 141 | Arc flash calculations and label(tru-46-7.81) (625E76000) | EACH | 1 | $500.00 | $500.00 | $1,000.00 | $2,040.00 | $3,494.75 | $500.00 |
| 142 | Sign, flat sheet (630E80100) | SF | 7.50 | $50.00 | $20.00 | $25.00 | $50.00 | $20.25 | $20.00 |
| 143 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 8 | $900.00 | $900.00 | $1,000.00 | $900.00 | $1,393.00 | $900.00 |
| 144 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 4 | $1,500.00 | $1,500.00 | $2,000.00 | $1,500.00 | $2,279.25 | $1,500.00 |
| 145 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $675.00 | $675.00 | $700.00 | $675.00 | $861.00 | $675.00 |
| 146 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 8 | $1,200.00 | $1,200.00 | $900.00 | $1,200.00 | $962.25 | $1,200.00 |
| 147 | Covering of vehicular signal head (632E25000) | EACH | 12 | $30.00 | $30.00 | $75.00 | $30.00 | $40.50 | $30.00 |
| 148 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $30.00 | $30.00 | $50.00 | $30.00 | $30.50 | $30.00 |
| 149 | Signal cable, 5 conductor, no. 14 AWG, as per plan (632E40501) | FT | 200 | $3.75 | $3.75 | $3.50 | $4.00 | $3.00 | $3.75 |
| 150 | Signal cable, 7 conductor, no. 14 AWG, as per plan (632E40701) | FT | 1,975 | $4.00 | $4.00 | $4.00 | $4.00 | $3.25 | $4.00 |
| 151 | Signal support foundation (632E64010) | EACH | 4 | $8,000.00 | $8,000.00 | $6,000.00 | $8,000.00 | $7,091.00 | $8,000.00 |
| 152 | Pedestal foundation (632E64020) | EACH | 4 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,266.25 | $1,200.00 |
| 153 | Power cable, 3 conductor, no. 8 AWG, as per plan (632E67301) | FT | 75 | $6.00 | $6.00 | $10.00 | $6.00 | $8.00 | $6.00 |
| 154 | Power service, as per plan (632E70001) | EACH | 1 | $3,000.00 | $3,000.00 | $4,000.00 | $3,000.00 | $1,367.50 | $3,000.00 |
| 155 | Conduit riser, 3" diameter (632E70600) | EACH | 1 | $1,000.00 | $1,000.00 | $1,200.00 | $1,000.00 | $759.75 | $1,000.00 |
| 156 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 4 | $11,250 | $11,250 | $14,000 | $11,300 | $11,346 | $11,250 |
| 157 | Pedestal, 8' (632E89600) | EACH | 4 | $2,000.00 | $2,000.00 | $700.00 | $2,000.00 | $1,367.50 | $2,000.00 |
| 158 | Removal of traffic signal installation (632E90100) | EACH | 1 | $4,000.00 | $4,000.00 | $5,000.00 | $4,000.00 | $2,228.50 | $4,000.00 |
| 159 | Reuse of vehicular signal head, as per plan (632E90201) | EACH | 8 | $600.00 | $600.00 | $700.00 | $600.00 | $380.00 | $600.00 |
| 160 | Signalization, misc.:foundation test hole (632E90400) | EACH | 9 | $1,000.00 | $1,000.00 | $450.00 | $1,000.00 | $455.75 | $1,000.00 |
| 161 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $18,000 | $18,000 | $21,000 | $18,000 | $20,108 | $18,000 |
| 162 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $3,444.25 | $2,500.00 |
| 163 | Controller work pad (633E67200) | EACH | 1 | $1,500.00 | $1,500.00 | $650.00 | $1,500.00 | $596.75 | $1,500.00 |
| 164 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $6,500.00 | $6,500.00 | $6,000.00 | $6,500.00 | $6,280.50 | $6,500.00 |
| 165 | ITS device, misc.:reuse communications device (809E65990) | EACH | 1 | $1,000.00 | $1,000.00 | $2,000.00 | $1,000.00 | $1,215.50 | $1,000.00 |
| 166 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $9,000.00 | $9,000.00 | $10,000 | $9,000.00 | $10,130 | $9,000.00 |
| 167 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,600.00 | $8,600.00 | $10,000 | $8,600.00 | $10,029 | $8,600.00 |
| 168 | Atc controller, as per plan (809E69123) | EACH | 1 | $5,200.00 | $5,200.00 | $6,500.00 | $5,200.00 | $6,078.00 | $5,200.00 |
| 169 | Preempt detector cable (809E69220) | FT | 441 | $2.75 | $2.75 | $3.00 | $3.00 | $3.00 | $2.75 |
| 170 | Traffic compacted surface, type A or B (410E12000) | CY | 40 | $55.00 | $60.00 | $100.00 | $150.00 | $171.50 | $140.00 |
| 171 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $73.00 | $90.00 | $85.00 | $90.00 | $76.00 | $90.00 |
| 172 | Asphalt concrete for maintaining traffic (614E13000) | CY | 40 | $275.00 | $455.00 | $500.00 | $455.00 | $461.00 | $455.00 |
| 173 | Maintaining traffic, misc.:retime traffic signals (614E18002) | LS | 1 | $5,000.00 | $5,000.00 | $6,000.00 | $5,400.00 | $2,532.50 | $5,000.00 |
| 174 | Maintaining traffic, misc.:3" partial depth paveme (614E18010) | SF | 5,000 | $7.50 | $7.00 | $8.00 | $7.00 | $7.00 | $7.00 |
| 175 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $1,000.00 | $500.00 | $950.00 | $900.00 | $1,241.50 | $750.00 |
| 176 | Work zone center line, class I (614E21000) | MI | 1.28 | $1,500.00 | $3,695.00 | $1,500.00 | $1,500.00 | $3,743.00 | $2,000.00 |
| 177 | Work zone edge line, class I, 4" (614E22000) | MI | 2.01 | $1,250.00 | $2,135.00 | $1,500.00 | $1,250.00 | $2,162.75 | $1,000.00 |
| 178 | Work zone transverse/diagonal line, class I (614E25000) | FT | 100 | $4.00 | $7.25 | $5.00 | $4.00 | $7.25 | $3.00 |
| 179 | Work zone stop line, class I (614E26000) | FT | 110 | $4.00 | $7.50 | $5.00 | $4.00 | $7.50 | $3.00 |
| 180 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 111 | $3.50 | $7.00 | $4.00 | $3.50 | $7.00 | $3.00 |
| 181 | Business entrance sign, as per plan (614E40051) | EACH | 20 | $150.00 | $215.00 | $200.00 | $20.00 | $217.25 | $320.00 |
| 182 | Pavement for maintaining traffic, class A (615E20000) | SY | 1,045 | $80.00 | $100.00 | $115.00 | $100.00 | $98.25 | $65.00 |
| 183 | Water (616E10000) | MGAL | 50 | $1.00 | $5.00 | $80.00 | $82.00 | $43.00 | $0.01 |
| 184 | Headwall removed (202E20010) | EACH | 2 | $400.00 | $400.00 | $500.00 | $110.00 | $430.25 | $450.00 |
| 185 | Pavement removed (202E23000) | SY | 5,547 | $20.00 | $15.00 | $22.00 | $12.00 | $35.50 | $16.00 |
| 186 | Curb removed (202E32000) | FT | 645 | $1.50 | $2.00 | $7.00 | $1.50 | $6.00 | $5.00 |
| 187 | Curb and gutter removed (202E32500) | FT | 675 | $3.00 | $3.00 | $12.00 | $2.00 | $7.00 | $5.00 |
| 188 | Pipe removed, 24" and under (202E35100) | FT | 573 | $25.00 | $15.00 | $25.00 | $29.00 | $20.75 | $30.00 |
| 189 | Manhole removed (202E58000) | EACH | 1 | $750.00 | $500.00 | $1,200.00 | $350.00 | $507.00 | $500.00 |
| 190 | Catch basin removed (202E58100) | EACH | 8 | $350.00 | $500.00 | $1,100.00 | $410.00 | $446.75 | $450.00 |
| 191 | Special - fill and plug existing conduit (202E70000) | FT | 40 | $45.00 | $21.00 | $200.00 | $110.00 | $89.25 | $40.00 |
| 192 | Removal misc.: inspection well (202E98100) | EACH | 1 | $250.00 | $300.00 | $700.00 | $500.00 | $241.50 | $50.00 |
| 193 | Removal misc.: conduit (202E98200) | FT | 10 | $20.00 | $30.00 | $40.00 | $15.00 | $23.75 | $15.00 |
| 194 | Excavation (203E10000) | CY | 4,224 | $20.00 | $20.00 | $28.00 | $25.00 | $47.00 | $30.00 |
| 195 | Excavation, as per plan (203E10001) | CY | 23 | $25.00 | $70.00 | $45.00 | $55.00 | $86.75 | $275.00 |
| 196 | Embankment (203E20000) | CY | 1,238 | $17.00 | $15.00 | $20.00 | $8.00 | $21.50 | $28.00 |
| 197 | Embankment, as per plan (203E20001) | CY | 3 | $75.00 | $30.00 | $90.00 | $100.00 | $111.00 | $100.00 |
| 198 | Granular material, type B (203E35110) | CY | 45 | $57.00 | $60.00 | $80.00 | $122.00 | $124.50 | $70.00 |
| 199 | Subgrade compaction (204E10000) | SY | 3,003 | $1.50 | $2.00 | $2.00 | $4.50 | $1.00 | $2.50 |
| 200 | Excavation of subgrade (204E13000) | CY | 45 | $15.00 | $25.00 | $30.00 | $64.00 | $88.50 | $28.00 |
| 201 | Proof rolling (204E45000) | HR | 1 | $200.00 | $275.00 | $200.00 | $270.00 | $343.25 | $125.00 |
| 202 | Geotextile fabric (204E50000) | SY | 125 | $2.00 | $1.50 | $3.00 | $6.00 | $2.75 | $3.25 |
| 203 | Pull box removed (625E31510) | EACH | 7 | $500.00 | $500.00 | $200.00 | $500.00 | $255.00 | $500.00 |
| 204 | Special - survey control verification (690E98400) | LS | 1 | $1,250.00 | $15,000 | $3,000.00 | $3,000.00 | $2,550.25 | $1,660.00 |
| 205 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 9 | $200.00 | $140.00 | $150.00 | $200.00 | $238.50 | $180.00 |
| 206 | Water (616E10000) | MGAL | 17.60 | $1.00 | $1.00 | $125.00 | $78.00 | $33.25 | $0.01 |
| 207 | Topsoil (659E00300) | CY | 1,840 | $45.00 | $30.00 | $80.00 | $42.00 | $50.50 | $35.00 |
| 208 | Seeding and mulching (659E10000) | SY | 7,691 | $1.85 | $1.86 | $3.00 | $1.80 | $2.00 | $1.50 |
| 209 | Repair seeding and mulching (659E14000) | SY | 375 | $1.85 | $0.80 | $2.00 | $1.80 | $2.00 | $0.27 |
| 210 | Commercial fertilizer (659E20000) | TON | 1.01 | $300.00 | $858.00 | $1,000.00 | $320.00 | $306.00 | $700.00 |
| 211 | Lime (659E31000) | ACRE | 1.55 | $25.00 | $156.00 | $250.00 | $27.00 | $25.50 | $50.00 |
| 212 | Water (659E35000) | MGAL | 20.30 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $0.01 |
| 213 | Ditch erosion protection (670E00700) | SY | 9,051 | $1.20 | $1.45 | $2.00 | $1.30 | $1.25 | $1.25 |
| 214 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,960.00 | $10,000 | $2,500.00 | $2,100.00 | $2,550.25 | $2,500.00 |
| 215 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $8,624.00 | $2,500.00 | $13,000 | $9,600.00 | $6,579.75 | $12,000 |
| 216 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,000.00 | $2,500.00 | $12,000 | $8,640.00 | $9,310.50 | $5,500.00 |
| 217 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 218 | Concrete masonry (602E20000) | CY | 2 | $3,213.00 | $2,500.00 | $2,500.00 | $1,750.00 | $1,640.00 | $2,250.00 |
| 219 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 1,046 | $13.00 | $12.00 | $20.00 | $20.00 | $31.25 | $15.00 |
| 220 | 6" conduit, type F (611E01500) | FT | 50 | $18.00 | $20.00 | $35.00 | $28.00 | $28.25 | $10.00 |
| 221 | 12" conduit, type B (611E04400) | FT | 38 | $65.00 | $115.00 | $110.00 | $86.00 | $161.75 | $190.00 |
| 222 | 15" conduit, type B (611E05900) | FT | 97 | $68.00 | $105.00 | $120.00 | $87.00 | $167.75 | $160.00 |
| 223 | 18" conduit, type A (611E07200) | FT | 40 | $83.00 | $115.00 | $130.00 | $79.00 | $168.00 | $190.00 |
| 224 | 18" conduit, type C (611E07600) | FT | 32 | $62.00 | $115.00 | $130.00 | $103.00 | $154.75 | $140.00 |
| 225 | 24" conduit, type B (611E10400) | FT | 82 | $101.00 | $125.00 | $155.00 | $136.00 | $189.75 | $140.00 |
| 226 | 27" conduit, type C (611E12100) | FT | 15 | $163.00 | $160.00 | $200.00 | $207.00 | $191.75 | $250.00 |
| 227 | 19" X 30" conduit, type B, 706.04 (611E52302) | FT | 86 | $241.00 | $215.00 | $320.00 | $240.00 | $327.50 | $250.00 |
| 228 | 19" X 30" conduit, type C, 706.04 (611E52304) | FT | 31 | $228.00 | $210.00 | $285.00 | $276.00 | $290.75 | $220.00 |
| 229 | Conduit, misc.: type B for drainage discharge cont (611E97400) | FT | 10 | $70.00 | $100.00 | $150.00 | $69.00 | $73.50 | $10.00 |
| 230 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 10 | $46.00 | $75.00 | $140.00 | $63.00 | $81.75 | $10.00 |
| 231 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 10 | $46.00 | $50.00 | $130.00 | $63.00 | $68.00 | $10.00 |
| 232 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 10 | $46.00 | $50.00 | $130.00 | $63.00 | $68.00 | $10.00 |
| 233 | Catch basin, no. 3, as per plan (611E98151) | EACH | 5 | $4,875.00 | $4,750.00 | $7,000.00 | $5,400.00 | $8,613.50 | $6,000.00 |
| 234 | Catch basin, no. 2-2A (611E98450) | EACH | 2 | $2,175.00 | $2,500.00 | $2,800.00 | $2,625.00 | $5,219.00 | $3,000.00 |
| 235 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $425.00 | $400.00 | $500.00 | $580.00 | $550.75 | $500.00 |
| 236 | Inspection well (611E99720) | EACH | 1 | $800.00 | $500.00 | $1,200.00 | $1,700.00 | $860.00 | $100.00 |
| 238 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 745 | $196.00 | $185.00 | $190.00 | $185.00 | $188.75 | $185.00 |
| 239 | Aggregate base (304E20000) | CY | 551 | $80.00 | $85.00 | $85.00 | $94.00 | $155.25 | $90.00 |
| 240 | Tack coat (407E10000) | GAL | 684 | $3.25 | $3.05 | $4.00 | $3.05 | $3.00 | $3.05 |
| 241 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 127 | $382.00 | $437.00 | $450.00 | $437.00 | $445.75 | $437.00 |
| 242 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 106 | $377.00 | $292.00 | $300.00 | $292.00 | $297.75 | $292.00 |
| 243 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 16 | $267.00 | $567.00 | $585.00 | $567.00 | $578.50 | $567.00 |
| 244 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 3 | $333.00 | $2,207.00 | $2,300.00 | $2,207.00 | $2,251.25 | $2,207.00 |
| 245 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 26 | $109.00 | $82.00 | $170.00 | $93.00 | $94.25 | $117.00 |
| 246 | Combination curb and gutter, type 2 (609E12000) | FT | 978 | $34.00 | $47.00 | $45.00 | $31.00 | $29.00 | $34.00 |
| 247 | Combination curb and gutter, type 9 (609E31000) | FT | 434 | $43.00 | $42.00 | $55.00 | $41.00 | $38.75 | $47.00 |
| 248 | 6" concrete traffic island (609E54000) | SY | 256 | $146.50 | $102.00 | $105.00 | $130.00 | $132.50 | $140.00 |
| 249 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 0.63 | $2,250.00 | $8,005.00 | $2,500.00 | $2,250.00 | $8,166.00 | $8,005.00 |
| 250 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 186 | $2.50 | $5.00 | $3.00 | $2.50 | $5.00 | $5.00 |
| 251 | Void reducing asphalt membrane (vram) (872E10000) | FT | 160 | $26.00 | $60.00 | $75.00 | $60.00 | $61.25 | $60.00 |
| 252 | RPM (621E00100) | EACH | 62 | $100.00 | $81.55 | $100.00 | $95.00 | $83.25 | $82.00 |
| 253 | Ground mounted support, no. 2 post (630E02100) | FT | 52 | $12.75 | $15.00 | $20.00 | $15.00 | $15.25 | $15.00 |
| 254 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 480.50 | $22.50 | $18.00 | $20.00 | $18.00 | $18.25 | $18.00 |
| 255 | Ground mounted support, no. 4 post (630E04100) | FT | 27 | $34.25 | $20.00 | $25.00 | $20.00 | $20.50 | $20.00 |
| 256 | One way support, no. 3 post (630E08004) | FT | 27 | $22.50 | $19.00 | $20.00 | $19.00 | $19.50 | $19.00 |
| 257 | Sign post reflector (630E08600) | EACH | 33 | $35.00 | $45.00 | $50.00 | $45.00 | $46.00 | $45.00 |
| 258 | Sign, flat sheet (630E80100) | SF | 357.30 | $35.00 | $18.00 | $20.00 | $18.00 | $18.25 | $18.00 |
| 259 | Sign, ground mounted extrusheet (630E80200) | SF | 54 | $45.00 | $23.00 | $25.00 | $23.00 | $23.50 | $23.00 |
| 260 | Removal of ground mounted sign and disposal (630E84900) | EACH | 30 | $25.00 | $15.00 | $20.00 | $15.00 | $15.25 | $15.00 |
| 261 | Removal of ground mounted post support and disposal (630E86002) | EACH | 37 | $25.00 | $20.00 | $25.00 | $20.00 | $20.50 | $20.00 |
| 262 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 2 | $250.00 | $165.00 | $200.00 | $165.00 | $168.25 | $165.00 |
| 263 | Removal of overhead sign support and disposal, type TC-16.21 (630E89704) | EACH | 2 | $2,500.00 | $1,550.00 | $1,800.00 | $1,550.00 | $1,581.25 | $1,550.00 |
| 264 | Removal of sign service (631E94470) | EACH | 2 | $500.00 | $525.00 | $600.00 | $525.00 | $535.50 | $525.00 |
| 265 | Removal of pavement marking (644E30000) | FT | 327 | $7.80 | $1.05 | $6.00 | $7.80 | $1.00 | $1.05 |
| 266 | Removal of pavement marking (644E30020) | EACH | 5 | $250.00 | $400.00 | $300.00 | $250.00 | $408.00 | $400.00 |
| 267 | Edge line, 6" (646E10010) | MI | 0.18 | $8,750.00 | $6,115.00 | $9,000.00 | $8,750.00 | $6,238.00 | $6,115.00 |
| 268 | Center line (646E10200) | MI | 0.11 | $9,250.00 | $8,160.00 | $10,000 | $9,250.00 | $8,324.00 | $8,160.00 |
| 269 | Channelizing line, 12" (646E10310) | FT | 100 | $3.00 | $2.85 | $4.00 | $3.00 | $3.00 | $2.85 |
| 270 | Stop line (646E10400) | FT | 75 | $12.50 | $13.50 | $15.00 | $12.50 | $13.75 | $13.50 |
| 271 | Lane arrow (646E20300) | EACH | 8 | $250.00 | $225.00 | $300.00 | $250.00 | $229.50 | $225.00 |
| 272 | Wrong way arrow (646E20320) | EACH | 2 | $450.00 | $400.00 | $500.00 | $450.00 | $408.00 | $400.00 |
| 273 | Two way left turn arrow (646E20370) | EACH | 2 | $250.00 | $450.00 | $300.00 | $250.00 | $459.00 | $450.00 |
| 274 | Dotted line, 6" (646E20504) | FT | 321 | $1.75 | $1.50 | $2.00 | $1.75 | $1.50 | $1.50 |
| 275 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 0.58 | $12,250 | $15,945 | $13,000 | $12,250 | $16,266 | $16,000 |
| 276 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 0.05 | $7,250.00 | $5,075.00 | $8,000.00 | $7,250.00 | $5,177.00 | $5,100.00 |
| 277 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 186 | $4.50 | $4.50 | $5.00 | $4.50 | $4.50 | $4.50 |
| 278 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $6,000.00 | $6,000.00 | $3,000.00 | $6,500.00 | $4,590.50 | $6,000.00 |
| 279 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $73.00 | $90.00 | $85.00 | $95.00 | $76.50 | $90.00 |
| 280 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,600.00 | $2,500.00 | $3,000.00 | $2,800.00 | $2,179.50 | $1,900.00 |
| 281 | Detour signing (614E12420) | LS | 1 | $17,000 | $15,000 | $15,000 | $13,250 | $5,535.25 | $5,000.00 |
| 282 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $275.00 | $547.00 | $750.00 | $547.00 | $558.00 | $250.00 |
| 283 | Portable changeable message sign, as per plan (614E18601) | SNMT | 16 | $1,000.00 | $500.00 | $1,000.00 | $860.00 | $1,250.25 | $700.00 |
| 284 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.18 | $18,500 | $12,817 | $20,000 | $18,500 | $13,075 | $15,000 |
| 285 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 286 | 4" conduit, type E (611E00400) | FT | 20 | $15.00 | $15.00 | $20.00 | $5.00 | $45.50 | $20.00 |
| 287 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $1,750.00 | $1,750.00 | $2,000.00 | $1,750.00 | $1,122.25 | $1,750.00 |
| 288 | RPM (621E00100) | EACH | 74 | $90.00 | $81.55 | $100.00 | $95.00 | $82.25 | $82.00 |
| 289 | Raised pavement marker removed (621E54000) | EACH | 32 | $5.00 | $70.00 | $40.00 | $74.00 | $13.75 | $10.00 |
| 290 | Ground mounted support, no. 3 post (630E03100) | FT | 13 | $22.50 | $25.00 | $30.00 | $25.00 | $25.25 | $25.00 |
| 291 | Overhead sign support, type TC-16.22, design 12 (630E72540) | EACH | 1 | $20,000 | $25,150 | $28,000 | $25,150 | $25,402 | $25,150 |
| 292 | Sign hanger assembly, mast arm (630E79100) | EACH | 5 | $825.00 | $425.00 | $500.00 | $425.00 | $429.25 | $425.00 |
| 293 | Sign, flat sheet (630E80100) | SF | 64 | $35.00 | $20.50 | $25.00 | $20.50 | $20.75 | $205.00 |
| 294 | Rigid overhead sign support foundation (630E84510) | EACH | 1 | $8,500.00 | $7,225.00 | $8,000.00 | $7,225.00 | $7,297.25 | $7,225.00 |
| 295 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $25.00 | $15.00 | $20.00 | $15.00 | $15.25 | $15.00 |
| 296 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $25.00 | $20.00 | $25.00 | $20.50 | $20.25 | $20.00 |
| 297 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 1 | $250.00 | $165.00 | $200.00 | $165.00 | $166.75 | $165.00 |
| 298 | Edge line, 6" (646E10010) | MI | 0.22 | $7,250.00 | $6,115.00 | $8,000.00 | $7,250.00 | $6,176.27 | $6,115.00 |
| 299 | Lane line, 6" (646E10110) | MI | 0.21 | $6,250.00 | $2,045.00 | $8,000.00 | $6,250.00 | $2,065.52 | $2,045.00 |
| 300 | Center line (646E10200) | MI | 0.17 | $8,750.00 | $8,160.00 | $10,000 | $8,750.00 | $8,241.53 | $8,160.00 |
| 301 | Channelizing line, 12" (646E10310) | FT | 227 | $2.50 | $2.85 | $3.00 | $2.50 | $3.00 | $2.85 |
| 302 | Stop line (646E10400) | FT | 98 | $12.50 | $13.50 | $15.00 | $12.50 | $13.75 | $13.50 |
| 303 | Transverse/diagonal line (646E10600) | FT | 92 | $12.50 | $12.00 | $15.00 | $12.50 | $12.00 | $12.00 |
| 304 | Transverse/diagonal line, as per plan (646E10601) | FT | 465 | $12.50 | $12.65 | $15.00 | $12.50 | $12.75 | $12.65 |
| 305 | Island marking (646E10800) | SF | 140 | $12.50 | $9.50 | $15.00 | $12.50 | $9.50 | $9.50 |
| 306 | Lane arrow (646E20300) | EACH | 6 | $250.00 | $225.00 | $300.00 | $250.00 | $227.25 | $225.00 |
| 307 | Dotted line (646E20500) | FT | 59 | $2.25 | $1.50 | $3.00 | $2.25 | $1.50 | $1.50 |
| 308 | Removal of pavement marking (646E50000) | EACH | 4 | $250.00 | $400.00 | $300.00 | $250.00 | $404.00 | $400.00 |
| 309 | Removal of pavement marking (646E50300) | MI | 0.60 | $4,750.00 | $5,330.00 | $5,000.00 | $4,750.00 | $5,383.25 | $5,330.00 |
| 310 | Conduit, 2", 725.04 (625E25400) | FT | 21 | $25.00 | $25.00 | $25.00 | $28.00 | $20.25 | $25.00 |
| 311 | Conduit, 3", 725.04 (625E25500) | FT | 62 | $35.00 | $35.00 | $40.00 | $40.00 | $30.25 | $35.00 |
| 312 | Conduit, 4", 725.04 (625E25600) | FT | 87 | $45.00 | $45.00 | $50.00 | $50.00 | $49.50 | $45.00 |
| 313 | Trench (625E29000) | FT | 75 | $12.00 | $12.00 | $20.00 | $13.00 | $12.00 | $12.00 |
| 314 | Trench in paved areas, as per plan (625E29401) | FT | 82 | $120.00 | $120.00 | $125.00 | $128.00 | $38.50 | $150.00 |
| 315 | Pull box, 725.08, 24" (625E30706) | EACH | 2 | $1,500.00 | $1,500.00 | $1,200.00 | $1,600.00 | $1,414.00 | $1,500.00 |
| 316 | Ground rod (625E32000) | EACH | 4 | $250.00 | $250.00 | $250.00 | $270.00 | $267.75 | $325.00 |
| 317 | Underground warning/marking tape, as per plan (625E36011) | FT | 70 | $1.00 | $1.00 | $5.00 | $1.00 | $3.00 | $1.00 |
| 318 | Arc flash calculations and label (tru-46 controlle (625E76000) | EACH | 1 | $500.00 | $500.00 | $1,000.00 | $550.00 | $3,484.50 | $500.00 |
| 319 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 6 | $900.00 | $900.00 | $1,100.00 | $970.00 | $1,388.75 | $900.00 |
| 320 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 1 | $1,500.00 | $1,500.00 | $2,200.00 | $1,600.00 | $2,272.50 | $1,500.00 |
| 321 | Covering of vehicular signal head (632E25000) | EACH | 7 | $30.00 | $30.00 | $75.00 | $30.00 | $40.50 | $30.00 |
| 322 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 323 | $3.75 | $3.75 | $4.00 | $4.00 | $3.00 | $3.75 |
| 323 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 443 | $4.00 | $4.00 | $4.00 | $4.00 | $3.00 | $4.00 |
| 324 | Signal support foundation (632E64010) | EACH | 2 | $8,500.00 | $8,500.00 | $7,500.00 | $8,500.00 | $7,373.00 | $8,500.00 |
| 325 | Power cable, 3 conductor, no. 4 AWG (632E69300) | FT | 30 | $8.00 | $8.00 | $10.00 | $8.00 | $15.25 | $8.00 |
| 326 | Power service, as per plan (632E70001) | EACH | 1 | $3,000.00 | $3,000.00 | $4,000.00 | $3,000.00 | $1,363.50 | $3,000.00 |
| 327 | Signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 12 and design 4 (632E71244) | EACH | 1 | $20,000 | $20,000 | $25,000 | $20,000 | $27,472 | $20,000 |
| 328 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $10,500 | $10,500 | $13,000 | $10,500 | $11,312 | $10,500 |
| 329 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $18,000 | $18,000 | $22,000 | $18,000 | $20,049 | $18,000 |
| 330 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $3,434.00 | $2,500.00 |
| 331 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,500.00 | $1,500.00 | $700.00 | $1,500.00 | $595.00 | $1,500.00 |
| 332 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,262.00 | $6,000.00 |
| 333 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $9,000.00 | $9,000.00 | $11,000 | $9,000.00 | $10,100 | $9,000.00 |
| 334 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $8,600.00 | $8,600.00 | $10,000 | $8,600.00 | $9,999.00 | $8,600.00 |
| 335 | Atc controller, as per plan (809E69123) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,111.00 | $1,000.00 |
| 336 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $73.00 | $90.00 | $85.00 | $90.00 | $75.75 | $90.00 |
| 337 | Clearing and grubbing (201E11000) | LS | 1 | $500.00 | $5,000.00 | $30,000 | $24,000 | $1,530.25 | $35,000 |
| 338 | Curb removed (202E32000) | FT | 36 | $3.00 | $6.50 | $15.00 | $17.00 | $11.75 | $10.00 |
| 339 | Pipe removed, 24" and under (202E35100) | FT | 87 | $30.00 | $18.50 | $25.00 | $20.00 | $55.50 | $40.00 |
| 340 | Catch basin removed (202E58100) | EACH | 5 | $300.00 | $400.00 | $1,100.00 | $340.00 | $458.75 | $250.00 |
| 341 | Excavation (203E10000) | CY | 82 | $25.00 | $100.00 | $30.00 | $129.00 | $223.25 | $100.00 |
| 342 | Embankment (203E20000) | CY | 145 | $25.00 | $50.00 | $30.00 | $40.00 | $105.00 | $40.00 |
| 343 | Subgrade compaction (204E10000) | SY | 82 | $1.50 | $20.00 | $5.00 | $28.00 | $32.00 | $3.00 |
| 344 | 4" concrete walk (608E10000) | SF | 6,220 | $10.20 | $8.00 | $9.00 | $9.50 | $10.00 | $12.00 |
| 345 | 8" concrete walk (608E15000) | SF | 1,859 | $15.10 | $11.00 | $15.00 | $10.50 | $13.00 | $15.00 |
| 346 | Curb ramp (608E52000) | SF | 83 | $37.00 | $22.00 | $30.00 | $38.00 | $35.75 | $45.00 |
| 347 | Special - misc.: preconstruction video taping (690E21000) | LS | 1 | $975.00 | $5,000.00 | $2,000.00 | $3,100.00 | $492.25 | $5,000.00 |
| 348 | Special - survey control verification (690E98400) | LS | 1 | $2,600.00 | $15,000 | $2,500.00 | $2,200.00 | $2,550.25 | $3,250.00 |
| 349 | Soil analysis test (659E00100) | EACH | 2 | $25.00 | $135.00 | $200.00 | $25.00 | $25.50 | $10.00 |
| 350 | Topsoil (659E00300) | CY | 155 | $55.00 | $50.00 | $80.00 | $42.00 | $101.50 | $45.00 |
| 351 | Seeding and mulching (659E10000) | SY | 1,393 | $1.85 | $3.48 | $4.00 | $1.85 | $2.00 | $3.00 |
| 352 | Commercial fertilizer (659E20000) | TON | 0.19 | $300.00 | $858.00 | $1,000.00 | $300.00 | $306.00 | $700.00 |
| 353 | Lime (659E31000) | ACRE | 0.29 | $25.00 | $156.00 | $250.00 | $25.00 | $25.52 | $50.00 |
| 354 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $0.01 |
| 355 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 356 | Concrete masonry (602E20000) | CY | 0.40 | $6,760.00 | $3,750.00 | $4,000.00 | $3,200.00 | $3,897.00 | $3,800.00 |
| 357 | 10" conduit, type C (611E03300) | FT | 2 | $150.00 | $200.00 | $300.00 | $450.00 | $513.25 | $575.00 |
| 358 | 12" conduit, type C (611E04600) | FT | 98 | $60.00 | $65.00 | $100.00 | $69.00 | $165.50 | $95.00 |
| 359 | 12" conduit, type C (611E04600) | FT | 22 | $106.00 | $175.00 | $160.00 | $190.00 | $206.00 | $250.00 |
| 360 | 15" conduit, type C (611E06100) | FT | 20 | $193.00 | $180.00 | $185.00 | $150.00 | $276.25 | $160.00 |
| 361 | 15" conduit, type C (611E06100) | FT | 20 | $98.00 | $100.00 | $120.00 | $139.00 | $234.50 | $155.00 |
| 362 | 18" conduit, type C (611E07600) | FT | 20 | $138.00 | $180.00 | $200.00 | $180.00 | $299.50 | $375.00 |
| 363 | Catch basin, no. 2-2B (611E98470) | EACH | 6 | $2,025.00 | $2,000.00 | $2,800.00 | $3,050.00 | $5,219.00 | $2,000.00 |
| 364 | Full depth pavement sawing (252E01500) | FT | 543 | $2.50 | $2.25 | $5.00 | $5.00 | $2.75 | $3.00 |
| 365 | Aggregate base (304E20000) | CY | 18 | $80.00 | $100.00 | $90.00 | $380.00 | $383.25 | $150.00 |
| 366 | Non-tracking tack coat (407E20000) | GAL | 5 | $3.25 | $3.05 | $4.00 | $3.05 | $3.00 | $3.05 |
| 367 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 3 | $879.00 | $2,480.00 | $2,600.00 | $2,480.00 | $2,529.75 | $2,480.00 |
| 368 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 4 | $683.00 | $1,905.00 | $2,000.00 | $1,905.00 | $1,943.25 | $1,905.00 |
| 369 | Fire hydrant removed and reset (638E10500) | EACH | 1 | $1,175.00 | $3,000.00 | $4,500.00 | $2,600.00 | $3,244.50 | $2,500.00 |
| 370 | Valve box adjusted to grade (638E10800) | EACH | 4 | $1,500.00 | $500.00 | $1,500.00 | $800.00 | $892.00 | $1,500.00 |
| 371 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 3 | $150.00 | $195.00 | $200.00 | $195.00 | $199.00 | $195.00 |
| 372 | Crosswalk line, 12", type 1 (642E00620) | FT | 106 | $7.50 | $30.00 | $8.00 | $7.50 | $30.50 | $30.00 |
| 373 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $35,000 | $86,425 | $65,000 | $38,000 | $70,000 | $43,000 |
| 374 | CPM progress schedule (108E10000) | LS | 1 | $14,000 | $5,000.00 | $33,548 | $3,800.00 | $6,371.00 | $30,000 |
| 375 | Maintaining traffic (614E11000) | LS | 1 | $289,000 | $400,000 | $325,000 | $887,000 | $359,015 | $690,000 |
| 376 | Field office, type C (619E16020) | MNTH | 22 | $3,500.00 | $2,600.00 | $3,500.00 | $3,800.00 | $899.75 | $3,500.00 |
| 377 | Construction layout stakes and surveying (623E10000) | LS | 1 | $60,000 | $100,000 | $130,000 | $88,000 | $73,692 | $130,000 |
| 378 | Mobilization (624E10000) | LS | 1 | $159,289 | $200,000 | $275,000 | $380,000 | $134,076 | $415,000 |
| 400 | 10" water main ductile iron pipe ansi class 52, mechanical joints and fittings, as per plan (638E01901) | FT | 760 | $125.00 | $130.00 | $170.00 | $215.00 | $267.50 | $250.00 |
| 401 | Roads for maintaining traffic (615E10000) | LS | 1 | $59,000 | $50,000 | $70,000 | $24,000 | $13,861 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 28, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way