Kirila Contractors Inc: ODOT bid record
Kirila Contractors Inc submitted 16 bids on Ohio DOT contracts in the data, from 17 DEC 2020 to 18 DEC 2025, and was the low bidder on 4 of them (25%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $12,192,687
- Latest bid
- 18 DEC 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 2 | 40% |
| 2022 | 2 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2025 | 3 | 2 | 67% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| TRU | 10 | 4 | 40% |
| COL | 3 | 0 | 0% |
| MAH | 2 | 0 | 0% |
| POR | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 31 | 27 (87%) | $40.00 | $34.00 |
| Ground mounted support, no. 2 post | 630E02100 | FT | 24 | 24 (100%) | $10.00 | $15.00 |
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 23 | 22 (96%) | $9.00 | $11.00 |
| Erosion control | 832E30000 | EACH | 21 | 21 (100%) | $1.00 | $1.00 |
| Patching concrete structure, as per plan | 519E11101 | SF | 22 | 20 (91%) | $100.00 | $150.00 |
| Sign, flat sheet | 630E80100 | SF | 25 | 19 (76%) | $20.00 | $24.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 28 | 18 (64%) | $15.00 | $23.50 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 28 | 18 (64%) | $25.00 | $20.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 18 | 17 (94%) | $55.00 | $80.00 |
| Removal of existing pavement marking | 512E74500 | FT | 16 | 15 (94%) | $3.00 | $3.00 |
| Sign, flat sheet | 630E80100 | SF | 15 | 15 (100%) | $20.00 | $20.00 |
| Removal of existing coatings from concrete surfaces | 512E74000 | SY | 16 | 14 (88%) | $25.00 | $27.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 15 | 10 of 15 |
| Karvo Companies Inc | 13 | 3 of 13 |
| Shelly Company | 13 | 6 of 13 |
| Chagrin Valley Paving Inc | 3 | 0 of 3 |
| Ronyak Paving Inc | 2 | 1 of 2 |
| S E T Inc | 2 | 0 of 2 |
| NLS Paving, Inc | 2 | 2 of 2 |
| A P O'Horo Company | 2 | 1 of 2 |
| Eclipse Co LLC | 2 | 0 of 2 |
| Barbicas Construction Company Inc | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 DEC 2025 | 250599 | TRU | TRU-US 62-04.56 (FOUR LANE RESURFACING) | 1 of 4 | $4,111,119 | Low, 0.0% under the second |
| 28 AUG 2025 | 250398 | TRU | TRU-SR 46-07.81 (PARTS 1-4) (INTERSECTION) | 1 of 6 | $6,206,766 | Low, 3.0% under the second |
| 27 FEB 2025 | 250127 | MAH | MAH-SR 14/SR 165-00.00/01.67 (MINOR RECONSTRUCTION) | 4 of 4 | $4,079,766 | +6.0% |
| 14 NOV 2024 | 240516 | COL | COL-SR-SR 9/VAR-14.72/VAR (TWO LANE RESURFACING) | 2 of 5 | $830,370 | +2.0% |
| 17 OCT 2024 | 240474 | TRU | TRU-SR 7/SR 7D-08.74/00.00 (TWO LANE RESURFACING) | 2 of 5 | $1,573,000 | +5.0% |
| 12 OCT 2023 | 230499 | TRU | TRU-SR 5-14.36 (TWO LANE RESURFACING) | 3 of 5 | $1,622,678 | +8.0% |
| 30 MAR 2023 | 230195 | TRU | TRU-Ellsworth-Bailey Rd (TWO LANE RESURFACING) | 2 of 6 | $359,183 | +1.0% |
| 26 JAN 2023 | 230061 | TRU | TRU-US 62-07.47 (INTERSECTION) | 2 of 5 | $2,157,879 | +12% |
| 10 MAR 2022 | 220151 | TRU | TRU-SR 5-08.30 (FOUR LANE RESURFACING) | 3 of 4 | $3,810,966 | +17% |
| 13 JAN 2022 | 220003 | COL | COL-SR 267-01.74 (TWO LANE RESURFACING) | 5 of 6 | $1,176,308 | +15% |
| 16 DEC 2021 | 210674 | COL | COL-SR 11-15.99 (FOUR LANE RESURFACING) | 5 of 5 | $3,647,731 | +28% |
| 02 DEC 2021 | 210640 | POR | POR-SR 44/VAR-16.48/VAR (PART 1, 2, 3) (TWO LANE RESURFACING) | 5 of 6 | $6,549,828 | +24% |
| 30 SEP 2021 | 210513 | MAH | MAH-US 62/SR 7-13.16/11.26 (FOUR LANE RESURFACING) | 2 of 5 | $1,384,000 | +8.0% |
| 29 APR 2021 | 210283 | TRU | TRU-SR 11-07.68 (TWO LANE RESURFACING) | 1 of 4 | $1,655,396 | Low, 16% under the second |
| 15 APR 2021 | 210246 | TRU | TRU-SR 46-06.50 (INTERSECTION) | 1 of 4 | $219,406 | Low, 7.0% under the second |
| 17 DEC 2020 | 200606 | TRU | TRU-SR 82-22.74 (FOUR LANE RESURFACING) | 2 of 5 | $5,917,006 | +14% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.