ODOT contract 250050 bid tabulation
HAN-SR 15/CR 193 (MINOR RECONSTRUCTION). Let by Ohio DOT on January 30, 2025, HAN. 5 bids received; low bid $4,668,192 by Eagle Bridge Co, -18% against the engineer's estimate of $5,714,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 161
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $4,668,192 | Low | -18% |
| 2 | E S Wagner Company | $4,693,870 | +1.0% | -18% |
| 3 | Miller Bros Const Inc | $4,935,104 | +6.0% | -14% |
| 4 | Vernon Nagel Inc | $5,208,021 | +12% | -9.0% |
| 5 | Beaver Excavating Company | $5,549,689 | +19% | -3.0% |
Engineer's estimate: $5,714,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. E S Wagner Company | 3. Miller Bros Const Inc | 4. Vernon Nagel Inc | 5. Beaver Excavating Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $35,000 | $10,000 | $50,000 | $70,000 |
| 2 | Pavement removed (202E23000) | SY | 5,491 | $6.00 | $7.50 | $4.50 | $5.00 | $8.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 3,448 | $7.00 | $20.96 | $15.00 | $8.00 | $16.00 |
| 4 | Catch basin removed (202E58100) | EACH | 2 | $250.00 | $477.15 | $800.00 | $250.00 | $600.00 |
| 5 | Special - fill and plug existing conduit (202E70000) | FT | 130 | $17.00 | $35.97 | $13.50 | $12.00 | $44.00 |
| 6 | Special - fill and plug existing conduit (202E70000) | FT | 223 | $18.00 | $34.91 | $19.00 | $20.00 | $42.00 |
| 7 | Special - fill and plug existing conduit (202E70000) | FT | 142 | $17.00 | $32.06 | $11.50 | $12.00 | $38.00 |
| 8 | Fence removed (202E75000) | FT | 2,188 | $2.00 | $2.39 | $2.35 | $4.00 | $2.00 |
| 9 | Excavation (203E10000) | CY | 3,581 | $13.00 | $5.60 | $6.50 | $14.00 | $8.00 |
| 10 | Embankment, as per plan (203E20001) | CY | 65,822 | $13.00 | $13.25 | $17.60 | $18.00 | $20.00 |
| 11 | Subgrade compaction (204E10000) | SY | 5,941 | $2.00 | $2.00 | $2.00 | $1.00 | $2.50 |
| 12 | Excavation of subgrade (204E13000) | CY | 286 | $15.00 | $7.50 | $37.00 | $20.00 | $20.00 |
| 13 | Granular material, type C (204E30020) | CY | 286 | $55.00 | $40.00 | $40.00 | $50.00 | $48.00 |
| 14 | Proof rolling (204E45000) | HR | 3 | $225.00 | $300.00 | $300.00 | $250.00 | $400.00 |
| 15 | Geotextile fabric (204E50000) | SY | 814 | $1.50 | $2.00 | $1.75 | $1.50 | $1.15 |
| 16 | Guardrail, type MGS, as per plan (606E15051) | FT | 1,225 | $19.50 | $19.80 | $19.50 | $19.50 | $21.00 |
| 17 | Guardrail, barrier design, type MGS (606E15550) | FT | 100 | $25.00 | $25.38 | $25.00 | $25.00 | $32.40 |
| 18 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,150.00 | $2,182.74 | $2,150.00 | $2,150.00 | $2,530.00 |
| 19 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,025.00 | $1,040.61 | $1,025.00 | $1,025.00 | $1,385.00 |
| 20 | MGS bridge terminal assembly, type 1, as per plan (606E35003) | EACH | 4 | $2,300.00 | $2,335.03 | $2,300.00 | $2,300.00 | $2,720.00 |
| 21 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 2 | $5,900.00 | $5,989.85 | $5,900.00 | $5,900.00 | $9,475.00 |
| 22 | Fence, type 47 (607E15000) | FT | 2,126 | $15.00 | $15.23 | $15.00 | $15.00 | $17.50 |
| 23 | Concrete barrier end section, type D (622E25000) | EACH | 4 | $4,500.00 | $4,250.00 | $4,250.00 | $5,000.00 | $4,900.00 |
| 24 | Monument assembly, type D (623E38550) | EACH | 4 | $1,600.00 | $1,424.32 | $1,900.00 | $800.00 | $825.00 |
| 25 | Right-of-way monument, type B (623E40520) | EACH | 1 | $700.00 | $555.70 | $1,000.00 | $400.00 | $525.00 |
| 26 | Monument, misc.: monument reset (623E40900) | EACH | 6 | $1,750.00 | $1,234.34 | $500.00 | $800.00 | $825.00 |
| 27 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $5,000.00 | $3,200.00 | $1,500.00 | $1,125.00 | $6,000.00 |
| 28 | Post construction survey monument verification and report (623E51000) | LS | 1 | $5,000.00 | $3,200.00 | $1,500.00 | $1,125.00 | $6,000.00 |
| 29 | Special - mailbox support (690E50000) | EACH | 1 | $200.00 | $695.82 | $195.00 | $195.00 | $195.00 |
| 30 | Special - mailbox removed and reset (690E50350) | EACH | 1 | $200.00 | $453.53 | $250.00 | $225.00 | $225.00 |
| 31 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 8 | $140.00 | $212.03 | $88.00 | $150.00 | $375.00 |
| 32 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 4 | $260.00 | $904.49 | $180.00 | $140.00 | $350.00 |
| 33 | Topsoil (659E00300) | CY | 1,879 | $5.00 | $9.00 | $8.50 | $25.00 | $12.00 |
| 34 | Seeding and mulching (659E10000) | SY | 31,703 | $1.25 | $0.74 | $0.74 | $1.25 | $0.74 |
| 35 | Repair seeding and mulching (659E14000) | SY | 1,585 | $1.50 | $3.46 | $0.74 | $0.75 | $0.74 |
| 36 | Inter-seeding (659E15000) | SY | 1,585 | $1.50 | $0.60 | $0.60 | $0.60 | $0.60 |
| 37 | Commercial fertilizer (659E20000) | TON | 4.60 | $1,500.00 | $850.00 | $850.00 | $850.00 | $850.00 |
| 38 | Lime (659E31000) | ACRE | 6.55 | $10.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 39 | Water (659E35000) | MGAL | 175 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Slope erosion protection (670E00500) | SY | 16,898 | $2.00 | $1.80 | $1.80 | $1.80 | $1.80 |
| 41 | Ditch erosion protection (670E00700) | SY | 20 | $2.00 | $1.80 | $1.80 | $1.80 | $1.80 |
| 42 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,000.00 | $2,000.00 | $1,025.00 | $1,500.00 | $1,025.00 |
| 43 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $15,500 | $11,000 | $4,960.00 | $7,600.00 | $8,550.00 |
| 44 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,000 | $11,134 | $10,141 | $10,200 | $10,141 |
| 45 | Erosion control (832E30000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 46 | Concrete masonry (602E20000) | CY | 2 | $2,000.00 | $3,418.34 | $2,500.00 | $2,600.00 | $4,200.00 |
| 47 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 2,801 | $12.00 | $15.85 | $18.50 | $15.00 | $18.00 |
| 48 | Aggregate drains (605E31100) | FT | 297 | $10.00 | $16.39 | $11.00 | $12.00 | $15.00 |
| 49 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 106 | $23.00 | $38.24 | $30.00 | $25.00 | $33.00 |
| 50 | 6" conduit, type B (611E00900) | FT | 283 | $35.00 | $73.65 | $55.00 | $32.00 | $24.00 |
| 51 | 6" conduit, type C (611E01100) | FT | 24 | $55.00 | $70.99 | $80.00 | $26.00 | $64.00 |
| 52 | 6" conduit, type E (611E01400) | FT | 142 | $8.00 | $23.14 | $31.00 | $20.00 | $40.00 |
| 53 | 6" conduit, type F (611E01500) | FT | 50 | $5.00 | $22.94 | $22.25 | $15.00 | $52.00 |
| 54 | 8" conduit, type C (611E02000) | FT | 6 | $65.00 | $132.23 | $85.00 | $70.00 | $27.00 |
| 55 | 8" conduit, type E (611E02500) | FT | 242 | $15.00 | $45.26 | $33.00 | $25.00 | $53.00 |
| 56 | 8" conduit, type F (611E02600) | FT | 50 | $8.00 | $55.11 | $25.00 | $23.00 | $85.00 |
| 57 | 10" conduit, type C (611E03300) | FT | 6 | $65.00 | $291.95 | $105.00 | $80.00 | $500.00 |
| 58 | 12" conduit, type B (611E04400) | FT | 144 | $50.00 | $77.08 | $80.00 | $100.00 | $64.00 |
| 59 | 12" conduit, type C (611E04600) | FT | 1,792 | $48.00 | $47.60 | $54.00 | $65.00 | $44.00 |
| 60 | 12" conduit, type D (611E04900) | FT | 144 | $48.00 | $68.29 | $60.00 | $75.00 | $56.00 |
| 61 | 12" conduit, type F (611E05200) | FT | 174 | $90.00 | $81.12 | $100.00 | $110.00 | $68.00 |
| 62 | 15" conduit, type C (611E06100) | FT | 14 | $65.00 | $116.65 | $105.00 | $87.00 | $102.00 |
| 63 | 18" conduit, type C, as per plan (611E07601) | FT | 194 | $60.00 | $64.97 | $70.00 | $90.00 | $64.00 |
| 64 | 21" conduit, type C, as per plan (611E09101) | FT | 206 | $80.00 | $76.67 | $88.00 | $122.00 | $78.00 |
| 65 | Conduit, bored or jacked, 12" type B (611E96600) | FT | 193 | $300.00 | $309.25 | $290.00 | $300.00 | $330.00 |
| 66 | Conduit, bored or jacked, 15" type B (611E96600) | FT | 108 | $380.00 | $391.40 | $365.00 | $375.00 | $370.00 |
| 67 | Catch basin, no. 8 (611E98410) | EACH | 1 | $6,000.00 | $4,780.99 | $2,800.00 | $4,500.00 | $5,950.00 |
| 68 | Inlet, no. 3 for single slope barrier, type D (611E99114) | EACH | 4 | $11,000 | $12,206 | $10,725 | $12,000 | $12,000 |
| 69 | Manhole, no. 3 (611E99574) | EACH | 12 | $3,000.00 | $4,277.67 | $2,600.00 | $3,500.00 | $6,850.00 |
| 70 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $300.00 | $629.17 | $600.00 | $300.00 | $480.00 |
| 71 | Inspection well (611E99720) | EACH | 7 | $2,250.00 | $1,134.99 | $1,075.00 | $150.00 | $1,600.00 |
| 72 | Full depth pavement sawing (255E20000) | FT | 1,020 | $2.00 | $1.81 | $1.50 | $1.90 | $1.50 |
| 73 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 662 | $182.00 | $155.74 | $150.00 | $150.00 | $150.00 |
| 74 | Aggregate base (304E20000) | CY | 1,291 | $65.00 | $65.00 | $60.00 | $65.00 | $62.00 |
| 75 | Non-tracking tack coat (407E20000) | GAL | 505 | $3.00 | $2.75 | $2.75 | $2.75 | $2.75 |
| 76 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 191 | $244.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 77 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 224 | $215.00 | $205.00 | $205.00 | $205.00 | $205.00 |
| 78 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 5 | $350.00 | $650.00 | $650.00 | $650.00 | $650.00 |
| 79 | Curb, type 4-C (609E24510) | FT | 72 | $55.00 | $53.33 | $47.50 | $58.00 | $40.00 |
| 80 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 0.20 | $25,000 | $34,747 | $29,250 | $29,250 | $29,250 |
| 81 | Structure grounding system (625E33000) | EACH | 1 | $14,500 | $16,500 | $16,500 | $16,500 | $14,500 |
| 82 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 6 | $6.00 | $6.09 | $6.00 | $6.00 | $11.50 |
| 83 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 18 | $11.00 | $11.17 | $11.00 | $11.00 | $13.20 |
| 84 | Barrier reflector, type 2 (one way) (626E00110) | EACH | 12 | $11.00 | $11.17 | $11.00 | $11.00 | $13.20 |
| 85 | Ground mounted support, no. 3 post (630E03100) | FT | 30 | $15.00 | $15.00 | $15.00 | $15.00 | $62.50 |
| 86 | Sign, flat sheet (630E80100) | SF | 2 | $40.00 | $50.00 | $50.00 | $50.00 | $65.00 |
| 87 | Removal of ground mounted sign and disposal (630E84900) | EACH | 26 | $20.00 | $25.00 | $25.00 | $25.00 | $20.00 |
| 88 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $110.00 | $150.00 | $150.00 | $150.00 | $85.00 |
| 89 | Removal of ground mounted post support and disposal (630E86002) | EACH | 44 | $20.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 90 | Edge line, 6", type 1 (642E00104) | MI | 0.21 | $2,100.00 | $2,000.00 | $2,000.00 | $1,500.00 | $2,000.00 |
| 91 | Lane line, 6", type 1 (642E00204) | MI | 0.06 | $2,100.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 92 | Center line, type 1 (642E00300) | MI | 0.44 | $2,100.00 | $4,000.00 | $4,000.00 | $2,000.00 | $4,000.00 |
| 93 | Pavement repair (253E02000) | CY | 20 | $450.00 | $425.00 | $425.00 | $500.00 | $425.00 |
| 94 | Non-tracking tack coat (407E20000) | GAL | 20 | $5.00 | $2.75 | $2.75 | $2.75 | $2.75 |
| 95 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $60.00 | $89.66 | $80.00 | $50.00 | $40.00 |
| 96 | Traffic compacted surface, type C (410E13000) | CY | 50 | $60.00 | $92.09 | $60.00 | $50.00 | $48.00 |
| 97 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 10 | $320.00 | $425.00 | $425.00 | $450.00 | $425.00 |
| 98 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 130 | $115.00 | $87.38 | $80.00 | $70.00 | $75.00 |
| 99 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,190.00 | $2,639.60 | $2,500.00 | $2,500.00 | $2,360.00 |
| 100 | Detour signing (614E12420) | LS | 1 | $32,500 | $11,000 | $9,000.00 | $9,000.00 | $9,000.00 |
| 101 | Work zone increased penalties sign (614E12484) | EACH | 4 | $120.00 | $360.54 | $225.00 | $225.00 | $225.00 |
| 102 | Replacement sign (614E12500) | EACH | 5 | $250.00 | $300.00 | $192.00 | $192.00 | $192.00 |
| 103 | Replacement drum (614E12600) | EACH | 50 | $45.00 | $60.00 | $64.00 | $64.00 | $64.00 |
| 104 | Barrier reflector, type 1, one-way (614E13310) | EACH | 57 | $10.00 | $9.97 | $8.00 | $8.00 | $8.00 |
| 105 | Object marker, one way (614E13350) | EACH | 57 | $18.00 | $26.92 | $16.00 | $16.00 | $16.00 |
| 106 | Portable changeable message sign, as per plan (614E18601) | SNMT | 18 | $750.00 | $750.00 | $900.00 | $900.00 | $900.00 |
| 107 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.30 | $12,000 | $10,000 | $10,000 | $9,000.00 | $10,000 |
| 108 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 1,584 | $1.25 | $1.50 | $1.50 | $2.00 | $1.50 |
| 109 | Water (616E10000) | MGAL | 171 | $15.00 | $65.00 | $75.00 | $10.00 | $70.00 |
| 110 | Compacted aggregate (617E10100) | CY | 50 | $115.00 | $113.71 | $50.00 | $75.00 | $70.00 |
| 111 | Portable barrier, unanchored (622E41100) | FT | 2,560 | $28.00 | $30.00 | $18.50 | $20.00 | $22.00 |
| 112 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 42 | $400.00 | $180.64 | $800.00 | $800.00 | $800.00 |
| 113 | Embankment, as per plan (203E20001) | CY | 797 | $7.00 | $13.25 | $18.50 | $18.00 | $25.00 |
| 114 | Granular material, type B (203E35110) | CY | 332 | $60.00 | $52.25 | $50.00 | $55.00 | $60.00 |
| 115 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 366 | $22.50 | $23.08 | $25.00 | $23.00 | $22.50 |
| 116 | Paved gutter, misc.: concrete gutter adjacent to (601E40000) | FT | 292 | $60.00 | $45.24 | $50.00 | $20.00 | $35.00 |
| 117 | Mechanically stabilized earth wall (840E20000) | SF | 4,386 | $65.00 | $70.00 | $68.50 | $70.00 | $80.00 |
| 118 | Wall excavation (840E21000) | CY | 520 | $10.00 | $20.00 | $6.00 | $12.00 | $34.00 |
| 119 | Foundation preparation (840E22000) | SY | 612 | $25.00 | $20.94 | $17.00 | $27.00 | $27.00 |
| 120 | Select granular backfill (840E23000) | CY | 2,856 | $40.00 | $45.00 | $36.25 | $45.00 | $52.00 |
| 121 | Natural soil (840E23050) | CY | 250 | $7.00 | $14.06 | $13.00 | $20.00 | $22.00 |
| 122 | 6" drainage pipe, perforated (840E25010) | FT | 554 | $7.49 | $10.00 | $7.00 | $8.00 | $10.00 |
| 123 | 6" drainage pipe, non-perforated (840E25020) | FT | 232 | $17.98 | $20.00 | $23.00 | $8.00 | $17.00 |
| 124 | Concrete coping (840E26000) | FT | 292 | $225.00 | $212.21 | $127.00 | $156.00 | $190.00 |
| 125 | On-site assistance (840E27000) | DAY | 5 | $500.00 | $500.00 | $600.00 | $125.00 | $100.00 |
| 126 | SGB inspection and compaction testing (840E28000) | LS | 1 | $25,000 | $10,000 | $5,960.00 | $13,000 | $8,500.00 |
| 127 | Unclassified excavation (503E21100) | CY | 69 | $125.00 | $150.00 | $139.00 | $25.00 | $65.00 |
| 128 | Pile driving equipment mobilization (505E11100) | LS | 1 | $20,000 | $20,000 | $51,000 | $25,000 | $40,000 |
| 129 | Steel piles HP10X42, furnished (507E00100) | FT | 1,975 | $48.00 | $35.00 | $26.00 | $40.00 | $40.00 |
| 130 | Steel piles HP10X42, driven (507E00150) | FT | 1,700 | $5.00 | $20.00 | $32.00 | $30.00 | $15.00 |
| 131 | Steel points or shoes (507E93300) | EACH | 55 | $125.00 | $150.00 | $137.00 | $150.00 | $170.00 |
| 132 | Epoxy coated steel reinforcement (509E10000) | LB | 99,801 | $1.35 | $1.50 | $1.43 | $1.50 | $1.50 |
| 133 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,759 | $1.50 | $1.30 | $1.55 | $1.50 | $1.50 |
| 134 | Class QC2 concrete with QC/QA, superstructure (511E33418) | CY | 41 | $950.00 | $1,132.96 | $1,100.00 | $1,500.00 | $975.00 |
| 135 | Semi-integral diaphragm guide, as per plan (511E33501) | EACH | 2 | $5,500.00 | $4,136.54 | $4,300.00 | $4,500.00 | $5,950.00 |
| 136 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 196 | $1,100.00 | $1,000.00 | $920.00 | $1,000.00 | $975.00 |
| 137 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 78 | $750.00 | $641.81 | $632.00 | $600.00 | $800.00 |
| 138 | Class QC1 concrete with QC/QA, pier above footings (511E41512) | CY | 11 | $1,000.00 | $1,300.00 | $1,050.00 | $1,200.00 | $1,600.00 |
| 139 | Class QC1 concrete with QC/QA, pier cap (511E42512) | CY | 23 | $1,000.00 | $1,400.00 | $1,050.00 | $1,100.00 | $1,025.00 |
| 140 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 54 | $1,000.00 | $900.00 | $960.00 | $725.00 | $1,225.00 |
| 141 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 148 | $600.00 | $600.00 | $600.00 | $475.00 | $575.00 |
| 142 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,447 | $22.50 | $25.64 | $21.50 | $24.00 | $25.00 |
| 143 | Type E waterproofing (512E44450) | SY | 4 | $175.00 | $41.34 | $101.70 | $30.00 | $58.00 |
| 144 | Draped strand prestressed concrete bridge I-beam members, level 3, type WF42-49 (515E15080) | EACH | 8 | $52,500 | $56,376 | $58,500 | $62,000 | $60,000 |
| 145 | Intermediate diaphragms (515E20000) | EACH | 18 | $2,750.00 | $2,455.29 | $1,500.00 | $3,500.00 | $2,125.00 |
| 146 | Armorless preformed joint seal (516E10010) | FT | 67 | $60.00 | $74.99 | $41.00 | $45.00 | $50.00 |
| 147 | 1" preformed expansion joint filler (516E13600) | SF | 16 | $8.00 | $2.45 | $7.50 | $10.00 | $10.00 |
| 148 | 2" preformed expansion joint filler (516E13900) | SF | 87 | $13.00 | $4.90 | $8.00 | $10.00 | $12.00 |
| 149 | Semi-integral abutment expansion joint seal (516E14020) | FT | 111 | $45.00 | $35.86 | $29.00 | $35.00 | $35.00 |
| 150 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 8 | $2,500.00 | $1,583.36 | $1,750.00 | $3,000.00 | $1,750.00 |
| 151 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 8 | $1,500.00 | $2,791.05 | $2,950.00 | $1,800.00 | $3,050.00 |
| 152 | Porous backfill with geotextile fabric (518E21200) | CY | 48 | $110.00 | $78.42 | $135.00 | $100.00 | $125.00 |
| 153 | 6" perforated corrugated plastic pipe (518E40000) | FT | 144 | $15.00 | $17.65 | $10.00 | $10.00 | $13.00 |
| 154 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 236 | $350.00 | $352.16 | $385.00 | $350.00 | $435.00 |
| 155 | Type C installation (526E90030) | FT | 71 | $300.00 | $156.34 | $190.00 | $252.00 | $315.00 |
| 156 | Vandal protection fence, 6' straight, coated fabric (607E39900) | FT | 320 | $103.00 | $104.52 | $97.00 | $106.00 | $91.70 |
| 157 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $45,000 | $29,260 | $25,000 | $60,000 | $40,000 |
| 158 | Maintaining traffic (614E11000) | LS | 1 | $45,000 | $84,325 | $82,000 | $100,000 | $63,500 |
| 159 | Field office, type B (619E16010) | MNTH | 9 | $3,000.00 | $2,100.00 | $2,400.00 | $2,500.00 | $2,300.00 |
| 160 | Construction layout stakes and surveying (623E10000) | LS | 1 | $25,000 | $11,850 | $15,000 | $26,000 | $30,000 |
| 161 | Mobilization (624E10000) | LS | 1 | $195,000 | $100,000 | $246,000 | $200,000 | $277,484 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.