ODOT contract 260459 bid tabulation
FUL-US 20A-19.20 Slide Repair (SLIDE REPAIR). Let by Ohio DOT on November 12, 2026, FUL. 5 bids received; low bid $1,265,940 by Toledo Caisson Corporation, +0.1% against the engineer's estimate of $1,265,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 43
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Toledo Caisson Corporation | $1,265,940 | Low | 0.0% |
| 2 | Great Lakes Demolition Company | $1,322,831 | +4.0% | +5.0% |
| 3 | E S Wagner Company | $1,391,388 | +10% | +10% |
| 4 | Advanced Excavating & Demolition LLC | $1,446,052 | +14% | +14% |
| 5 | Alan Stone Co Inc | $1,826,008 | +44% | +44% |
Engineer's estimate: $1,265,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Toledo Caisson Corporation | 2. Great Lakes Demolition Company | 3. E S Wagner Company | 4. Advanced Excavating & Demolition LLC | 5. Alan Stone Co Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,000.00 | $1,500.00 | $17,340 | $20,000 | $16,000 |
| 2 | Pavement removed (202E23000) | SY | 94 | $51.00 | $60.00 | $28.00 | $41.00 | $80.00 |
| 3 | Curb removed (202E32000) | FT | 429 | $11.50 | $3.00 | $2.00 | $17.00 | $8.50 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 56 | $20.00 | $20.00 | $25.00 | $35.00 | $15.00 |
| 5 | Guardrail removed (202E38000) | FT | 412.50 | $3.00 | $2.00 | $2.00 | $2.00 | $6.50 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $250.00 | $250.00 | $165.00 | $165.00 | $490.00 |
| 7 | Catch basin removed (202E58100) | EACH | 1 | $415.00 | $450.00 | $700.00 | $1,500.00 | $1,300.00 |
| 8 | Excavation (203E10000) | CY | 640 | $37.00 | $20.00 | $19.00 | $55.00 | $35.00 |
| 9 | Embankment (203E20000) | CY | 500 | $59.00 | $15.00 | $51.00 | $51.00 | $80.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 538 | $26.00 | $24.00 | $23.60 | $24.00 | $25.00 |
| 11 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,575.00 | $3,200.00 | $2,945.00 | $3,000.00 | $3,300.00 |
| 12 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $735.00 | $150.00 | $273.00 | $550.00 | $470.00 |
| 13 | Topsoil furnished and placed (653E10000) | CY | 101 | $72.00 | $70.00 | $70.00 | $90.00 | $45.00 |
| 14 | Seeding and mulching (659E10000) | SY | 911 | $3.50 | $2.00 | $2.55 | $3.00 | $4.00 |
| 15 | Repair seeding and mulching (659E14000) | SY | 46 | $1.00 | $1.00 | $5.50 | $1.00 | $15.00 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.13 | $600.00 | $800.00 | $400.00 | $500.00 | $630.00 |
| 17 | Water (659E35000) | MGAL | 5 | $1.00 | $1.00 | $0.10 | $0.10 | $110.00 |
| 18 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Concrete masonry (602E20000) | CY | 0.21 | $4,200.00 | $3,000.00 | $6,800.00 | $11,500 | $6,800.00 |
| 20 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 414 | $29.00 | $10.00 | $20.00 | $35.00 | $15.00 |
| 21 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 55 | $54.00 | $15.00 | $62.00 | $62.00 | $40.00 |
| 22 | 12" conduit, type F (611E05200) | FT | 58 | $157.00 | $145.00 | $155.00 | $250.00 | $130.00 |
| 23 | Catch basin, no. 3 (611E98150) | EACH | 1 | $5,000.00 | $2,400.00 | $6,400.00 | $5,500.00 | $10,000 |
| 24 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $1,420.00 | $200.00 | $460.00 | $900.00 | $690.00 |
| 25 | Aggregate base (304E20000) | CY | 57 | $115.00 | $60.00 | $83.00 | $125.00 | $130.00 |
| 26 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 4 | $300.00 | $550.00 | $200.00 | $650.00 | $710.00 |
| 27 | Combination curb and gutter, type 4 (609E23000) | FT | 429 | $42.00 | $35.00 | $40.00 | $45.00 | $55.00 |
| 28 | Barrier reflector, type 5, bidirectional (626E00116) | EACH | 7 | $15.00 | $14.00 | $14.00 | $14.00 | $15.00 |
| 29 | Asphalt concrete for maintaining traffic (614E13000) | CY | 5 | $1,050.00 | $600.00 | $507.00 | $900.00 | $410.00 |
| 30 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,270.00 | $1,000.00 | $1,133.00 | $1,000.00 | $1,200.00 |
| 31 | Water (616E10000) | MGAL | 2 | $1.00 | $1.00 | $167.00 | $100.00 | $110.00 |
| 32 | Steel piles, misc.: soldier piles, W16X50 (507E00400) | FT | 4,500 | $71.00 | $110.00 | $78.53 | $70.00 | $90.00 |
| 33 | Class QC1 concrete, footing, as per plan (511E46511) | CY | 31 | $550.00 | $1,000.00 | $683.00 | $1,400.00 | $370.00 |
| 34 | Porous backfill with geotextile fabric (518E21200) | CY | 173 | $103.00 | $85.00 | $120.00 | $140.00 | $85.00 |
| 35 | 6" perforated corrugated plastic pipe (518E40000) | FT | 429 | $42.00 | $15.00 | $3.00 | $45.00 | $8.50 |
| 36 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 4,023 | $105.00 | $95.00 | $136.67 | $125.00 | $200.00 |
| 37 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 662 | $98.00 | $80.00 | $127.77 | $145.00 | $110.00 |
| 38 | Special - retaining wall, precast concrete panel ( (530E50000) | EACH | 215 | $765.00 | $525.00 | $525.00 | $665.00 | $580.00 |
| 39 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,000 | $8,700.00 | $7,500.00 | $20,000 | $20,000 |
| 40 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $100.00 | $6,500.00 | $1,441.00 | $5,500.00 | $2,500.00 |
| 41 | Maintaining traffic (614E11000) | LS | 1 | $7,000.00 | $8,500.00 | $5,100.00 | $30,000 | $11,000 |
| 42 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $10,800 | $5,000.00 | $10,500 | $17,000 |
| 43 | Mobilization (624E10000) | LS | 1 | $35,000 | $80,000 | $69,569 | $20,000 | $135,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.