ODOT contract 250162 bid tabulation
MEG-US 33-19.21 (MAJOR WIDENING). Let by Ohio DOT on March 27, 2025, MEG. 1 bid received; low bid $65,174,509 by Kokosing Construction Company Inc, +14% against the engineer's estimate of $57,389,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 316
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $65,174,509 | Low | +14% |
Engineer's estimate: $57,389,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc |
|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $250,000 |
| 2 | Pavement removed (202E23000) | SY | 42,733 | $6.25 |
| 3 | Wearing course removed (202E23500) | SY | 2,347 | $12.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 673 | $20.00 |
| 5 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 1,331 | $13.00 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 26 | $70.00 |
| 7 | Guardrail removed (202E38000) | FT | 29,812 | $1.80 |
| 8 | Anchor assembly removed, type A (202E42000) | EACH | 2 | $250.00 |
| 9 | Catch basin removed (202E58100) | EACH | 13 | $950.00 |
| 10 | Special - fill and plug existing conduit (202E70000) | FT | 80 | $48.00 |
| 11 | Special - fill and plug existing conduit (202E70000) | FT | 109 | $53.00 |
| 12 | Fence removed (202E75000) | FT | 5,569 | $4.00 |
| 13 | Removal misc.: crossover removal (202E98000) | LS | 1 | $30,000 |
| 14 | Special - piezometer (203E07510) | EACH | 1 | $10,000 |
| 15 | Excavation (203E10000) | CY | 2,145,476 | $7.55 |
| 16 | Embankment (203E20000) | CY | 588,112 | $1.50 |
| 17 | Special - settlement platform (203E65000) | EACH | 9 | $1,340.00 |
| 18 | Subgrade compaction (204E10000) | SY | 290,607 | $1.77 |
| 19 | Excavation of subgrade (204E13000) | CY | 10,901 | $6.85 |
| 20 | Granular material, type B (204E30010) | CY | 10,901 | $85.00 |
| 21 | Granular material, type E (204E30040) | CY | 1,073 | $125.00 |
| 22 | Proof rolling (204E45000) | HR | 97 | $250.00 |
| 23 | Geotextile fabric (204E50000) | SY | 2,264 | $2.30 |
| 24 | Pre-blast condition survey (208E10000) | LS | 1 | $18,370 |
| 25 | Blasting consultant (208E12000) | LS | 1 | $7,500.00 |
| 26 | Air blast and noise control (208E13000) | LS | 1 | $25,350 |
| 27 | Vibration control and monitoring (208E14000) | LS | 1 | $25,350 |
| 28 | Presplitting (208E15000) | SY | 373 | $30.00 |
| 29 | Hydrologist (208E16000) | LS | 1 | $91,200 |
| 30 | Reshaping under guardrail (209E15000) | STA | 228 | $90.00 |
| 31 | Borrow (209E70000) | CY | 569 | $90.00 |
| 32 | Guardrail, type MGS (606E15050) | FT | 30,912.50 | $17.04 |
| 33 | Guardrail, type MGS with long posts (606E15100) | FT | 200 | $19.92 |
| 34 | MGS guardrail, type 8 (606E15400) | FT | 3,162.50 | $26.68 |
| 35 | Post end anchor (or concrete block end anchor) (606E17500) | EACH | 20 | $1,270.00 |
| 36 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 12 | $2,190.00 |
| 37 | Anchor assembly, type T (606E26500) | EACH | 30 | $1,000.00 |
| 38 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 15 | $1,970.00 |
| 39 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $340.00 |
| 40 | Impact attenuator, type 1 (unidirectional) (606E60002) | EACH | 6 | $7,490.00 |
| 41 | Fence, type 47 (607E15000) | FT | 5,438 | $11.64 |
| 42 | Reference monument, type A (623E40500) | EACH | 104 | $480.00 |
| 43 | Slope protection, misc.: seeding and erosion contr (601E21100) | SY | 423 | $120.00 |
| 44 | Rock channel protection, type C with filter (601E32200) | CY | 1,397 | $145.00 |
| 45 | Soil analysis test (659E00100) | EACH | 12 | $25.00 |
| 46 | Topsoil (659E00300) | CY | 14,647 | $10.00 |
| 47 | Seeding and mulching (659E10000) | SY | 728,240 | $0.60 |
| 48 | Seeding and mulching, as per plan (659E10001) | SY | 185,647 | $0.55 |
| 49 | Repair seeding and mulching (659E14000) | SY | 45,694 | $0.60 |
| 50 | Inter-seeding (659E15000) | SY | 45,694 | $0.01 |
| 51 | Commercial fertilizer (659E20000) | TON | 130 | $250.00 |
| 52 | Lime (659E31000) | ACRE | 190 | $25.00 |
| 53 | Water (659E35000) | MGAL | 5,061 | $0.01 |
| 54 | Mowing (659E40000) | MSF | 2,055 | $1.00 |
| 55 | Slope erosion protection (670E00500) | SY | 131,824 | $1.10 |
| 56 | Ditch erosion protection (670E00700) | SY | 29,536 | $1.15 |
| 57 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 |
| 58 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $65,100 |
| 59 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $39,267 |
| 60 | Erosion control (832E30000) | EACH | 1,160,000 | $1.00 |
| 61 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 2,433 | $5.00 |
| 62 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 80 | $6.00 |
| 63 | Seeding and erosion control with turf reinforcing mat, type 3 (836E10030) | SY | 247 | $7.00 |
| 64 | Concrete masonry (602E20000) | CY | 11.50 | $6,300.00 |
| 65 | 4" shallow pipe underdrains (605E05100) | FT | 460 | $25.00 |
| 66 | 6" shallow pipe underdrains (605E11100) | FT | 45,836 | $14.00 |
| 67 | 6" unclassified pipe underdrains (605E13300) | FT | 423 | $37.00 |
| 68 | 6" unclassified pipe underdrains for springs (605E13402) | FT | 2,400 | $30.00 |
| 69 | 6" rock cut underdrains (605E13500) | FT | 33,870 | $18.00 |
| 70 | 6" base pipe underdrains (605E14000) | FT | 32,825 | $9.00 |
| 71 | Aggregate drains for springs (605E32200) | FT | 400 | $16.00 |
| 72 | 4" conduit, type F (611E00406) | FT | 1,055 | $60.00 |
| 73 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 3,529 | $34.00 |
| 74 | 12" conduit, type B (611E04400) | FT | 660 | $131.00 |
| 75 | 12" conduit, type B (611E04400) | FT | 6 | $358.00 |
| 76 | 12" conduit, type C (611E04600) | FT | 150 | $133.00 |
| 77 | 15" conduit, type B (611E05900) | FT | 1,008 | $183.00 |
| 78 | 15" conduit, type B (611E05900) | FT | 54 | $350.00 |
| 79 | 15" conduit, type C (611E06100) | FT | 1,347 | $136.00 |
| 80 | 18" conduit, type B (611E07400) | FT | 2,899 | $182.00 |
| 81 | 18" conduit, type B (611E07400) | FT | 8 | $428.00 |
| 82 | 18" conduit, type C (611E07600) | FT | 650 | $152.00 |
| 83 | 21" conduit, type B (611E08900) | FT | 1,002 | $244.00 |
| 84 | 21" conduit, type B (611E08900) | FT | 6 | $1,082.00 |
| 85 | 24" conduit, type B (611E10400) | FT | 467 | $290.00 |
| 86 | 24" conduit, type B (611E10400) | FT | 6 | $773.00 |
| 87 | 24" conduit, type B (611E10400) | FT | 91 | $368.00 |
| 88 | 24" conduit, type C (611E10600) | FT | 268 | $200.00 |
| 89 | 30" conduit, type B (611E13400) | FT | 93 | $377.00 |
| 90 | 36" conduit, type B (611E16400) | FT | 77 | $424.00 |
| 91 | 36" conduit, type B (611E16400) | FT | 75 | $316.00 |
| 92 | 42" conduit, type B (611E19400) | FT | 48 | $684.00 |
| 93 | Conduit, bored or jacked, 36", 748.06 (611E96600) | FT | 101 | $1,225.00 |
| 94 | Catch basin, no. 4 (611E98230) | EACH | 37 | $9,300.00 |
| 95 | Catch basin, no. 4A (611E98270) | EACH | 4 | $11,000 |
| 96 | Catch basin, no. 8 (611E98410) | EACH | 32 | $9,100.00 |
| 97 | Catch basin, no. 8A (611E98434) | EACH | 1 | $10,250 |
| 98 | Catch basin, no. 2-2C, as per plan (611E98505) | EACH | 7 | $4,500.00 |
| 99 | Catch basin adjusted to grade (611E98630) | EACH | 3 | $1,300.00 |
| 100 | Precast reinforced concrete outlet (611E99710) | EACH | 21 | $770.00 |
| 101 | Full depth pavement sawing (252E01500) | FT | 49,526 | $1.70 |
| 102 | Pavement planing, asphalt concrete, variable depth (254E01000) | SY | 196 | $12.00 |
| 103 | Pavement planing, portland cement concrete, 1.5" (254E01010) | SY | 2,347 | $12.00 |
| 104 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 32,829 | $201.00 |
| 105 | Aggregate base (304E20000) | CY | 36,713 | $95.00 |
| 106 | Tack coat, 702.13 (407E13900) | GAL | 16,637 | $4.05 |
| 107 | Non-tracking tack coat (407E20000) | GAL | 34,494 | $4.45 |
| 108 | Prime coat (408E10000) | GAL | 2,448 | $5.00 |
| 109 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 971 | $323.00 |
| 110 | Anti-segregation equipment (442E00100) | CY | 24,749 | $7.25 |
| 111 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 10,401 | $216.00 |
| 112 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 12,744 | $216.00 |
| 113 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 17,703 | $253.75 |
| 114 | Compacted aggregate (617E10100) | CY | 319 | $150.00 |
| 115 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 37 | $990.41 |
| 116 | Connection, fused pull apart (625E00450) | EACH | 70 | $170.00 |
| 117 | Connection, unfused permanent (625E00480) | EACH | 84 | $145.00 |
| 118 | Light pole, conventional, AT15B40 (625E10490) | EACH | 2 | $3,700.00 |
| 119 | Light pole, conventional, AT18B40 (625E10490) | EACH | 1 | $3,800.00 |
| 120 | Light pole, conventional, AT20B40 (625E10490) | EACH | 31 | $4,000.00 |
| 121 | Light pole, conventional, AT25B40 (625E10490) | EACH | 1 | $4,200.00 |
| 122 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 35 | $2,300.00 |
| 123 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 5,310 | $3.30 |
| 124 | No. 10 AWG pole and bracket cable (625E23400) | FT | 6,279 | $1.60 |
| 125 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 9,399 | $10.50 |
| 126 | Conduit, 3", 725.04 (625E25500) | FT | 569 | $38.50 |
| 127 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 922 | $135.00 |
| 128 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 35 | $470.00 |
| 129 | Trench, 24" deep (625E29002) | FT | 9,508 | $4.75 |
| 130 | Pull box, 725.08, 18" (625E30700) | EACH | 23 | $1,450.00 |
| 131 | Pull box removed (625E31510) | EACH | 5 | $300.00 |
| 132 | Ground rod (625E32000) | EACH | 35 | $270.00 |
| 133 | Power service, as per plan (625E34001) | EACH | 5 | $9,800.00 |
| 134 | Underground warning marking tape (625E36010) | FT | 9,508 | $1.25 |
| 135 | Special - maintain existing lighting (625E40000) | LS | 1 | $25,000 |
| 136 | Special - replacement of existing lighting unit (625E40010) | EACH | 2 | $1,500.00 |
| 137 | Light pole foundation removed (625E75500) | EACH | 10 | $400.00 |
| 138 | Power service removed (625E75510) | EACH | 4 | $3,100.00 |
| 139 | Luminaire support removed, as per plan (625E75521) | EACH | 10 | $1,090.00 |
| 140 | Distribution cable removed (625E75550) | FT | 818 | $2.50 |
| 141 | Distribution cable removed, as per plan (625E75551) | FT | 517 | $3.25 |
| 142 | Arc flash calculations and label (CC-'A') (625E76000) | EACH | 1 | $720.00 |
| 143 | Arc flash calculations and label (CC-'B') (625E76000) | EACH | 1 | $720.00 |
| 144 | Arc flash calculations and label (CC-'CB') (625E76000) | EACH | 1 | $720.00 |
| 145 | Arc flash calculations and label (CC-'D') (625E76000) | EACH | 1 | $720.00 |
| 146 | Arc flash calculations and label (CC-'SD') (625E76000) | EACH | 1 | $720.00 |
| 147 | Delineator, post ground mounted (620E00500) | EACH | 11 | $52.00 |
| 149 | RPM (621E00100) | EACH | 1,437 | $36.00 |
| 150 | Raised pavement marker removed (621E54000) | EACH | 613 | $29.00 |
| 151 | Barrier reflector, type 2, unidirectional (626E00110) | EACH | 354 | $10.00 |
| 152 | Ground mounted support, no. 3 post (630E03100) | FT | 1,730 | $10.30 |
| 153 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 248 | $14.50 |
| 154 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 441.50 | $22.50 |
| 155 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 217.70 | $24.00 |
| 156 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 238.50 | $37.50 |
| 157 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 198.60 | $44.00 |
| 158 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 733.80 | $28.00 |
| 159 | Sign post reflector (630E08600) | EACH | 57 | $25.00 |
| 160 | Breakaway structural beam connection (630E09000) | EACH | 71 | $500.00 |
| 161 | Sign, flat sheet (630E80100) | SF | 1,551.50 | $14.00 |
| 162 | Sign, ground mounted extrusheet (630E80200) | SF | 2,471 | $20.00 |
| 163 | Sign backing assembly (630E82000) | EACH | 12 | $100.00 |
| 164 | Ground mounted structural beam support foundation (630E84500) | EACH | 94 | $1,470.00 |
| 165 | Removal of ground mounted sign and disposal (630E84900) | EACH | 189 | $12.00 |
| 166 | Removal of ground mounted post support and disposal (630E86002) | EACH | 170 | $20.00 |
| 167 | Removal of ground mounted structural beam support (630E86102) | EACH | 2 | $150.00 |
| 168 | Center line (644E00300) | MI | 0.59 | $7,000.00 |
| 169 | Stop line (644E00500) | FT | 170 | $12.50 |
| 170 | Transverse/diagonal line (644E00700) | FT | 731 | $10.00 |
| 171 | Chevron marking (644E00720) | FT | 950 | $10.00 |
| 172 | Island marking (644E00900) | SF | 1,358 | $6.25 |
| 173 | Lane arrow (644E01300) | EACH | 30 | $150.00 |
| 174 | Lane reduction arrow (644E01350) | EACH | 2 | $225.00 |
| 175 | Dotted line, 6" (644E01510) | FT | 275 | $1.25 |
| 176 | Yield line (644E20800) | FT | 60 | $12.50 |
| 177 | Edge line, 6", type A4 (645E00118) | MI | 0.56 | $35,000 |
| 178 | Lane line, 6", type A4 (645E00220) | MI | 0.28 | $7,350.00 |
| 179 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 35.21 | $5,250.00 |
| 180 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 17.04 | $2,750.00 |
| 181 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 8,009 | $3.00 |
| 182 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 52.14 | $1,500.00 |
| 183 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 8,009 | $0.60 |
| 184 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 0.84 | $3,000.00 |
| 185 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 400 | $120.00 |
| 186 | Increased barrier delineation (614E11630) | FT | 10,140 | $0.85 |
| 187 | Work zone impact attenuator, over 24" and less than 36" wide hazards, (unidirectional) (614E12390) | EACH | 19 | $3,875.00 |
| 188 | Detour signing (614E12420) | LS | 1 | $4,000.00 |
| 189 | Detour signing (614E12420) | LS | 1 | $4,000.00 |
| 190 | Detour signing (614E12420) | LS | 1 | $3,000.00 |
| 191 | Work zone marking sign (614E12460) | EACH | 364 | $35.00 |
| 192 | Replacement drum (614E12600) | EACH | 100 | $80.00 |
| 193 | Barrier reflector, type 1, BI-directional (614E13310) | EACH | 203 | $22.00 |
| 194 | Object marker, one way (614E13350) | EACH | 203 | $26.00 |
| 195 | Portable changeable message sign, as per plan (614E18601) | SNMT | 50 | $1,500.00 |
| 196 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 9.41 | $500.00 |
| 197 | Work zone center line, class I, 642 paint (614E21100) | MI | 3.39 | $1,450.00 |
| 198 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 18.82 | $825.00 |
| 199 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 33,375 | $0.70 |
| 200 | Work zone dotted line, class III, 12", 642 paint (614E24618) | FT | 10,825 | $0.70 |
| 201 | Work zone stop line, class III, 642 paint (614E26610) | FT | 531 | $5.75 |
| 202 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 248 | $110.00 |
| 203 | Roads for maintaining traffic (615E10000) | LS | 1 | $110,000 |
| 204 | Pavement for maintaining traffic, class A (615E20000) | SY | 2,982 | $60.00 |
| 205 | Water (616E10000) | MGAL | 10,960 | $70.00 |
| 206 | Portable barrier, unanchored (622E41100) | FT | 10,140 | $24.00 |
| 207 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $70,000 |
| 208 | Unclassified excavation (503E21300) | LS | 1 | $120,000 |
| 209 | Unclassified excavation, including rock (503E21320) | LS | 1 | $1.00 |
| 210 | Epoxy coated steel reinforcement (509E10000) | LB | 145,958 | $1.75 |
| 211 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,780 | $3.40 |
| 212 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,975.00 |
| 213 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 486 | $950.00 |
| 214 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 69 | $900.00 |
| 215 | Class QC1 concrete, pier above footings (511E41010) | CY | 64 | $1,650.00 |
| 216 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 172 | $1,250.00 |
| 217 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,425 | $24.00 |
| 218 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,058 | $17.00 |
| 219 | Type 2 waterproofing (512E33000) | SY | 18 | $40.00 |
| 220 | Draped strand prestressed concrete bridge I-beam members, level 3, type WF60-49 (515E15110) | EACH | 10 | $95,000 |
| 221 | Intermediate diaphragms (515E20000) | EACH | 24 | $3,350.00 |
| 222 | 1" preformed expansion joint filler (516E13600) | SF | 17 | $16.00 |
| 223 | 2" preformed expansion joint filler (516E13900) | SF | 268 | $12.00 |
| 224 | Semi-integral abutment expansion joint seal (516E14020) | FT | 123 | $45.00 |
| 225 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $3,700.00 |
| 226 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 10 | $2,100.00 |
| 227 | Porous backfill with geotextile fabric (518E21200) | CY | 82 | $130.00 |
| 228 | 6" perforated corrugated plastic pipe (518E40000) | FT | 140 | $23.00 |
| 229 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 40 | $23.00 |
| 230 | Drilled shafts, 30" diameter, into bedrock (524E94604) | FT | 120 | $596.00 |
| 231 | Drilled shafts, 36" diameter, above bedrock (524E94702) | FT | 114 | $563.00 |
| 232 | Drilled shafts, 42" diameter, into bedrock (524E94804) | FT | 30 | $864.00 |
| 233 | Drilled shafts, 48" diameter, above bedrock (524E94902) | FT | 18 | $1,157.00 |
| 234 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 252 | $400.00 |
| 235 | Type A installation (526E90010) | FT | 92 | $400.00 |
| 236 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 407 | $160.00 |
| 237 | Polymer modified asphalt expansion joint system (846E00110) | CF | 38 | $639.90 |
| 238 | Thermal integrity profiling (tip) test (894E10000) | EACH | 3 | $5,000.00 |
| 239 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 408 | $24.00 |
| 240 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,198 | $17.00 |
| 241 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $80,000 |
| 242 | Unclassified excavation (503E21300) | LS | 1 | $250,000 |
| 243 | Unclassified excavation, including rock (503E21320) | LS | 1 | $12,000 |
| 244 | Epoxy coated steel reinforcement (509E10000) | LB | 142,431 | $1.75 |
| 245 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 7,696 | $3.40 |
| 246 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,975.00 |
| 247 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 470 | $950.00 |
| 248 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 68 | $900.00 |
| 249 | Class QC1 concrete, pier above footings (511E41010) | CY | 52 | $1,650.00 |
| 250 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 204 | $1,250.00 |
| 251 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,402 | $24.00 |
| 252 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,044 | $17.00 |
| 253 | Type 2 waterproofing (512E33000) | SY | 18 | $40.00 |
| 254 | Draped strand prestressed concrete bridge I-beam members, level 3, type WF60-49 (515E15110) | EACH | 10 | $95,000 |
| 255 | Intermediate diaphragms (515E20000) | EACH | 24 | $3,350.00 |
| 256 | 1" preformed expansion joint filler (516E13600) | SF | 17 | $16.00 |
| 257 | 2" preformed expansion joint filler (516E13900) | SF | 235 | $12.00 |
| 258 | Semi-integral abutment expansion joint seal (516E14020) | FT | 136 | $45.00 |
| 259 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $3,700.00 |
| 260 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 10 | $2,100.00 |
| 261 | Porous backfill with geotextile fabric (518E21200) | CY | 106 | $130.00 |
| 262 | 6" perforated corrugated plastic pipe (518E40000) | FT | 146 | $23.00 |
| 263 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 46 | $23.00 |
| 264 | Drilled shafts, 30" diameter, into bedrock (524E94604) | FT | 120 | $636.00 |
| 265 | Drilled shafts, 36" diameter, above bedrock (524E94702) | FT | 134 | $503.00 |
| 266 | Drilled shafts, 54" diameter, into bedrock (524E94908) | FT | 30 | $1,500.00 |
| 267 | Drilled shafts, 60" diameter, above bedrock (524E94914) | FT | 63 | $1,025.00 |
| 268 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 252 | $400.00 |
| 269 | Type A installation (526E90010) | FT | 92 | $400.00 |
| 270 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 341 | $160.00 |
| 271 | Polymer modified asphalt expansion joint system (846E00110) | CF | 39 | $639.90 |
| 272 | Thermal integrity profiling (tip) test (894E10000) | EACH | 3 | $5,000.00 |
| 273 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 408 | $24.00 |
| 274 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 1,186 | $17.00 |
| 275 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $85,000 |
| 276 | Unclassified excavation (503E21300) | LS | 1 | $110,000 |
| 277 | Unclassified excavation, including rock (503E21320) | LS | 1 | $7,500.00 |
| 278 | Epoxy coated steel reinforcement (509E10000) | LB | 102,496 | $1.75 |
| 279 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,371 | $3.40 |
| 280 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,975.00 |
| 281 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 361 | $950.00 |
| 282 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 39 | $900.00 |
| 283 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 430 | $1,250.00 |
| 284 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 972 | $24.00 |
| 285 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 601 | $17.00 |
| 286 | Type 2 waterproofing (512E33000) | SY | 28 | $40.00 |
| 287 | Draped strand prestressed concrete bridge I-beam members, level 3, type WF60-49 (515E15110) | EACH | 6 | $107,000 |
| 288 | Intermediate diaphragms (515E20000) | EACH | 15 | $3,350.00 |
| 289 | 1" preformed expansion joint filler (516E13600) | SF | 17 | $16.00 |
| 290 | 2" preformed expansion joint filler (516E13900) | SF | 348 | $12.00 |
| 291 | Semi-integral abutment expansion joint seal (516E14020) | FT | 123 | $45.00 |
| 292 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 12 | $4,300.00 |
| 293 | Porous backfill with geotextile fabric (518E21200) | CY | 203 | $130.00 |
| 294 | 6" perforated corrugated plastic pipe (518E40000) | FT | 210 | $23.00 |
| 295 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $23.00 |
| 296 | Drilled shafts, 30" diameter, into bedrock (524E94604) | FT | 60 | $696.00 |
| 297 | Drilled shafts, 36" diameter, above bedrock (524E94702) | FT | 12 | $1,183.00 |
| 298 | Drilled shafts, 48" diameter, into bedrock (524E94904) | FT | 90 | $1,000.00 |
| 299 | Drilled shafts, 54" diameter, above bedrock (524E94906) | FT | 136 | $882.00 |
| 300 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30011) | SY | 303 | $400.00 |
| 301 | Type A installation (526E90010) | FT | 91 | $400.00 |
| 302 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 109 | $160.00 |
| 303 | Polymer modified asphalt expansion joint system (846E00110) | CF | 38 | $639.90 |
| 304 | Thermal integrity profiling (tip) test (894E10000) | EACH | 2 | $5,000.00 |
| 305 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 233 | $24.00 |
| 306 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 690 | $17.00 |
| 307 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $350,000 |
| 308 | CPM progress schedule (108E10000) | LS | 1 | $10,000 |
| 309 | Special - departments share facilitated partnering costs (111E10100) | EACH | 9,000 | $1.00 |
| 310 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $928,000 |
| 311 | Field office, type C (619E16020) | MNTH | 42 | $2,800.00 |
| 312 | Construction layout stakes and surveying (623E10000) | LS | 1 | $380,000 |
| 313 | Mobilization (624E10000) | LS | 1 | $3,250,000 |
| 400 | Ground mounted support, no. 2 post (630E02100) | FT | 694 | $8.20 |
| 401 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $50.00 |
| 402 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 18.92 | $625.00 |
| 403 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 80.67 | $1,195.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.