ODOT contract 250166 bid tabulation

TUS-Gnadenhutten Streetscape (SIDEWALK). Let by Ohio DOT on March 27, 2025, TUS. 3 bids received; low bid $1,259,126 by Stanley Miller Construction Company, +3.5% against the engineer's estimate of $1,216,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
110
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Stanley Miller Construction Company$1,259,126Low+4.0%
2Shelly & Sands Inc$1,269,837+1.0%+4.0%
3Shelly Company$1,279,198+2.0%+5.0%
ODOT contract 250166: bids by rank

Engineer's estimate: $1,216,000.

Bid tabulation

LinePay itemUnitQuantity1. Stanley Miller Construction Company2. Shelly & Sands Inc3. Shelly Company
1Clearing and grubbing (201E11000)LS1$2,667.00$5,200.00$8,000.00
2Pavement removed (202E23000)SY1,187$14.25$30.00$30.00
3Walk removed (202E30000)SF3,456$1.00$2.90$5.00
4Catch basin removed (202E58100)EACH6$788.00$670.00$650.00
5Removal misc.:landscape pipe removed (202E98000)LS1$250.00$940.00$1,500.00
6Removal misc.:landscape timbers removed (202E98000)LS1$250.00$540.00$2,000.00
7Removal misc.:stone slabs removed (202E98000)LS1$250.00$540.00$3,500.00
8Removal misc.:yard drain removed (202E98000)LS1$750.00$940.00$1,000.00
9Excavation (203E10000)CY124$94.00$130.00$38.00
10Embankment (203E20000)CY73$80.00$45.00$122.00
11Subgrade compaction (204E10000)SY1,446$1.00$2.00$3.00
124" concrete walk, as per plan (608E10001)SF24,063$8.00$6.95$7.40
136" concrete walk, as per plan (608E13001)SF3,230$12.00$15.00$11.25
14Curb ramp, as per plan (608E52001)SF1,169$19.00$40.00$25.00
15Special - mailbox support system, single (690E50100)EACH28$275.00$260.00$245.00
16Special - mailbox removed and reset (690E50350)EACH2$300.00$290.00$275.00
17Soil analysis test (659E00100)EACH2$150.00$540.00$350.00
18Topsoil (659E00300)CY281$50.00$100.00$88.00
19Seeding and mulching, class 1 (659E00500)SY1,077$7.55$5.40$1.30
20Repair seeding and mulching (659E14000)SY54$2.00$1.30$3.00
21Commercial fertilizer (659E20000)TON0.15$900.00$935.00$1,500.00
22Lime (659E31000)ACRE0.22$180.00$180.00$0.50
23Water (659E35000)MGAL6$1.00$1.00$50.00
24Mowing (659E40000)MSF3$350.00$1.00$0.50
25Slope erosion protection (670E00500)SY2,517$6.25$1.40$11.00
26Storm water pollution prevention plan (832E15000)LS1$2,694.00$1,075.00$2,425.00
27Storm water pollution prevention inspections (832E15002)LS1$4,916.00$4,400.00$12,240
28Storm water pollution prevention inspection software (832E15010)LS1$16,075$15,600$16,500
29Erosion control (832E30000)EACH35,000$1.00$1.00$1.00
308" conduit, type D (611E02400)FT32$92.00$53.00$120.00
3112" conduit, type B, as per plan (611E04401)FT30$116.00$162.00$135.00
3215" conduit, type B, as per plan (611E05901)FT5$453.00$204.00$150.00
3318" conduit, type B, as per plan (611E07401)FT20$172.00$175.00$175.00
3424" conduit, type B, as per plan (611E10401)FT5$408.00$260.00$200.00
35Catch basin, no. 3A (611E98180)EACH3$2,689.00$2,775.00$3,325.00
36Catch basin, no. 6 (611E98370)EACH1$2,850.00$4,230.00$3,825.00
37Catch basin, no. 2-2C (611E98504)EACH2$2,367.00$2,700.00$2,825.00
38Manhole adjusted to grade (611E99654)EACH2$1,670.00$490.00$1,000.00
39Asphalt concrete base, PG64-22, (449) (301E56000)CY27$563.00$785.00$440.00
40Aggregate base (304E20000)CY57$171.00$132.00$280.00
41Tack coat (407E10000)GAL18$4.50$3.50$3.00
42Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY6$1,400.00$1,355.00$480.00
43Asphalt concrete intermediate course, type 2, (449) (441E70300)CY8$1,004.00$995.00$460.00
446" non-reinforced concrete pavement, class QC 1P, as per plan (452E10011)SY896$96.00$138.00$120.00
45Combination curb and gutter, type 2 (609E12000)FT410$54.40$60.00$70.00
46Curb, type 4-C (609E24510)FT549$40.00$40.00$35.00
47Compacted aggregate (617E10100)CY100$63.00$130.00$120.00
48Fire hydrant removed and reset (638E10500)EACH1$2,280.00$2,300.00$2,600.00
49Valve box adjusted to grade (638E10800)EACH4$417.00$495.00$600.00
50Connection, fused pull apart (625E00450)EACH30$117.25$108.00$117.25
51Connection, unfused pull apart (625E00460)EACH15$96.00$108.00$96.00
52Connection, unfused permanent (625E00480)EACH24$145.20$108.00$145.20
53Light pole, decorative, as per plan (625E10481)EACH13$3,125.00$3,840.00$3,125.00
54Light pole foundation (625E14500)EACH13$1,510.00$2,256.00$1,510.00
55No. 6 AWG 2400 volt distribution cable (625E23302)FT41$5.80$3.80$5.80
56No. 8 AWG 600 volt distribution cable (625E23304)FT12,400$1.50$3.15$1.50
57No. 12 AWG pole and bracket cable (625E23410)FT1,200$1.75$2.15$1.75
58Conduit, 2", 725.04 (625E25400)FT1,052$16.50$17.20$16.50
59Conduit, 3", 725.04 (625E25500)FT12$34.00$35.00$34.00
60Conduit, jacked or drilled, 725.04, 3" (625E25902)FT740$98.00$51.50$88.00
61Luminaire, decorative, as per plan, black finish (625E27551)EACH17$1,700.00$1,075.00$1,700.00
62Trench (625E29000)FT860$4.70$16.00$4.70
63Trench in paved area (625E29400)FT204$120.00$21.50$120.00
64Pull box, 725.08, 18" (625E30700)EACH9$836.00$1,075.00$836.00
65Ground rod (625E32000)EACH16$160.00$285.00$160.00
66Power service, as per plan (625E34001)EACH1$2,575.00$5,900.00$2,575.00
67Control center cabinet, complete (625E34450)EACH1$6,100.00$10,640$6,100.00
68Special - maintain existing lighting (625E40000)LS1$2,400.00$2,685.00$2,400.00
69Arc flash calculations and label, CC-1 (625E76000)EACH1$2,750.00$3,870.00$2,750.00
70Conduit riser, 2" diameter (632E70400)EACH1$357.00$645.00$357.50
71Ground mounted support, no. 2 post (630E02100)FT72$107.00$24.00$22.50
72Ground mounted support, no. 3 post (630E03100)FT52$11.00$27.00$25.00
73Sign post reflector (630E08600)EACH4$56.00$54.00$50.00
74Sign, flat sheet (630E80100)SF36$30.00$32.25$30.00
75Sign, double faced, street name (630E80500)EACH4$121.00$275.00$255.00
76Removal of ground mounted sign and reerection (630E85100)EACH2$102.00$81.00$75.00
77Removal of ground mounted post support and storage (630E86006)EACH6$85.00$27.00$25.00
78School speed limit sign assembly, 24" X 36" (631E92990)EACH2$3,234.00$3,760.00$3,234.00
79Removal, misc.:school speed limit sign assembly, 2 (631E94490)EACH2$247.50$430.00$247.50
80Stop line (644E00500)FT84$9.50$9.15$8.50
81Crosswalk line, 24", as per plan (644E00631)FT440$8.35$8.10$7.50
82Parking lot stall marking (644E01200)FT862$3.10$3.00$2.75
83Handicap symbol marking (644E01600)EACH4$120.00$113.00$105.00
84Removal of pavement marking (644E30000)FT1,583$2.00$1.80$1.65
854" conduit, type E (611E00400)FT120$6.15$4.80$6.15
86Conduit, 2", 725.04 (625E25400)FT271$11.65$17.00$11.65
87Conduit, jacked or drilled, 725.04, 3" (625E25902)FT70$100.00$53.00$88.00
88Trench (625E29000)FT271$3.00$16.00$3.00
89Pull box, 725.08, 18" (625E30700)EACH4$630.00$1,050.00$630.00
90Ground rod (625E32000)EACH2$167.00$295.00$167.00
91Arc flash calculations and label, SP-1 (625E76000)EACH1$2,750.00$3,870.00$2,750.00
92Vehicular signal head, (LED), 1-section, 12" lens, 1-way, polycarbonate (632E04802)EACH8$422.00$970.00$422.00
93Covering of vehicular signal head (632E25000)EACH8$15.00$43.00$15.00
94Messenger wire, 7 strand, 1/4" diameter with accessories (632E29900)FT127$6.50$22.00$6.50
95Tether wire, with accessories (632E30600)FT127$16.00$21.50$16.00
96Signal cable, 3 conductor, no. 14 AWG (632E40300)FT434$4.00$3.25$4.00
97Strain pole foundation (632E64000)EACH2$4,925.00$10,315$4,925.00
98Test hole performed (632E64950)EACH2$275.00$135.00$275.00
99Power cable, 3 conductor, no. 6 AWG (632E68300)FT32$4.85$8.60$4.85
100Service cable, 3 conductor, no. 6 AWG (632E69800)FT331$1.75$9.15$1.75
101Power service, as per plan (632E70001)EACH1$3,060.00$2,060.00$3,060.00
102Strain pole, type TC-81.11, design 8, as per plan (632E86121)EACH2$14,250$16,550$14,250
103Removal of traffic signal installation, as per plan (632E90101)EACH1$5,000.00$1,720.00$5,000.00
104Flasher controller (633E71000)EACH1$950.00$1,720.00$950.00
105Water (616E10000)MGAL5$500.00$106.00$250.00
106Premium for contract performance bond and for payment bond (103E05000)LS1$13,778$7,084.00$10,000
107Maintaining traffic (614E11000)LS1$49,112$80,000$110,000
108Field office, type B (619E16010)MNTH15$1,000.00$2,900.00$2,000.00
109Construction layout stakes and surveying (623E10000)LS1$96,711$6,000.00$14,000
110Mobilization (624E10000)LS1$94,471$40,000$60,000
ODOT contract 250166: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy