ODOT contract 250166 bid tabulation
TUS-Gnadenhutten Streetscape (SIDEWALK). Let by Ohio DOT on March 27, 2025, TUS. 3 bids received; low bid $1,259,126 by Stanley Miller Construction Company, +3.5% against the engineer's estimate of $1,216,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 110
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Stanley Miller Construction Company | $1,259,126 | Low | +4.0% |
| 2 | Shelly & Sands Inc | $1,269,837 | +1.0% | +4.0% |
| 3 | Shelly Company | $1,279,198 | +2.0% | +5.0% |
Engineer's estimate: $1,216,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stanley Miller Construction Company | 2. Shelly & Sands Inc | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,667.00 | $5,200.00 | $8,000.00 |
| 2 | Pavement removed (202E23000) | SY | 1,187 | $14.25 | $30.00 | $30.00 |
| 3 | Walk removed (202E30000) | SF | 3,456 | $1.00 | $2.90 | $5.00 |
| 4 | Catch basin removed (202E58100) | EACH | 6 | $788.00 | $670.00 | $650.00 |
| 5 | Removal misc.:landscape pipe removed (202E98000) | LS | 1 | $250.00 | $940.00 | $1,500.00 |
| 6 | Removal misc.:landscape timbers removed (202E98000) | LS | 1 | $250.00 | $540.00 | $2,000.00 |
| 7 | Removal misc.:stone slabs removed (202E98000) | LS | 1 | $250.00 | $540.00 | $3,500.00 |
| 8 | Removal misc.:yard drain removed (202E98000) | LS | 1 | $750.00 | $940.00 | $1,000.00 |
| 9 | Excavation (203E10000) | CY | 124 | $94.00 | $130.00 | $38.00 |
| 10 | Embankment (203E20000) | CY | 73 | $80.00 | $45.00 | $122.00 |
| 11 | Subgrade compaction (204E10000) | SY | 1,446 | $1.00 | $2.00 | $3.00 |
| 12 | 4" concrete walk, as per plan (608E10001) | SF | 24,063 | $8.00 | $6.95 | $7.40 |
| 13 | 6" concrete walk, as per plan (608E13001) | SF | 3,230 | $12.00 | $15.00 | $11.25 |
| 14 | Curb ramp, as per plan (608E52001) | SF | 1,169 | $19.00 | $40.00 | $25.00 |
| 15 | Special - mailbox support system, single (690E50100) | EACH | 28 | $275.00 | $260.00 | $245.00 |
| 16 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $300.00 | $290.00 | $275.00 |
| 17 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $540.00 | $350.00 |
| 18 | Topsoil (659E00300) | CY | 281 | $50.00 | $100.00 | $88.00 |
| 19 | Seeding and mulching, class 1 (659E00500) | SY | 1,077 | $7.55 | $5.40 | $1.30 |
| 20 | Repair seeding and mulching (659E14000) | SY | 54 | $2.00 | $1.30 | $3.00 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.15 | $900.00 | $935.00 | $1,500.00 |
| 22 | Lime (659E31000) | ACRE | 0.22 | $180.00 | $180.00 | $0.50 |
| 23 | Water (659E35000) | MGAL | 6 | $1.00 | $1.00 | $50.00 |
| 24 | Mowing (659E40000) | MSF | 3 | $350.00 | $1.00 | $0.50 |
| 25 | Slope erosion protection (670E00500) | SY | 2,517 | $6.25 | $1.40 | $11.00 |
| 26 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,694.00 | $1,075.00 | $2,425.00 |
| 27 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $4,916.00 | $4,400.00 | $12,240 |
| 28 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $16,075 | $15,600 | $16,500 |
| 29 | Erosion control (832E30000) | EACH | 35,000 | $1.00 | $1.00 | $1.00 |
| 30 | 8" conduit, type D (611E02400) | FT | 32 | $92.00 | $53.00 | $120.00 |
| 31 | 12" conduit, type B, as per plan (611E04401) | FT | 30 | $116.00 | $162.00 | $135.00 |
| 32 | 15" conduit, type B, as per plan (611E05901) | FT | 5 | $453.00 | $204.00 | $150.00 |
| 33 | 18" conduit, type B, as per plan (611E07401) | FT | 20 | $172.00 | $175.00 | $175.00 |
| 34 | 24" conduit, type B, as per plan (611E10401) | FT | 5 | $408.00 | $260.00 | $200.00 |
| 35 | Catch basin, no. 3A (611E98180) | EACH | 3 | $2,689.00 | $2,775.00 | $3,325.00 |
| 36 | Catch basin, no. 6 (611E98370) | EACH | 1 | $2,850.00 | $4,230.00 | $3,825.00 |
| 37 | Catch basin, no. 2-2C (611E98504) | EACH | 2 | $2,367.00 | $2,700.00 | $2,825.00 |
| 38 | Manhole adjusted to grade (611E99654) | EACH | 2 | $1,670.00 | $490.00 | $1,000.00 |
| 39 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 27 | $563.00 | $785.00 | $440.00 |
| 40 | Aggregate base (304E20000) | CY | 57 | $171.00 | $132.00 | $280.00 |
| 41 | Tack coat (407E10000) | GAL | 18 | $4.50 | $3.50 | $3.00 |
| 42 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 6 | $1,400.00 | $1,355.00 | $480.00 |
| 43 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 8 | $1,004.00 | $995.00 | $460.00 |
| 44 | 6" non-reinforced concrete pavement, class QC 1P, as per plan (452E10011) | SY | 896 | $96.00 | $138.00 | $120.00 |
| 45 | Combination curb and gutter, type 2 (609E12000) | FT | 410 | $54.40 | $60.00 | $70.00 |
| 46 | Curb, type 4-C (609E24510) | FT | 549 | $40.00 | $40.00 | $35.00 |
| 47 | Compacted aggregate (617E10100) | CY | 100 | $63.00 | $130.00 | $120.00 |
| 48 | Fire hydrant removed and reset (638E10500) | EACH | 1 | $2,280.00 | $2,300.00 | $2,600.00 |
| 49 | Valve box adjusted to grade (638E10800) | EACH | 4 | $417.00 | $495.00 | $600.00 |
| 50 | Connection, fused pull apart (625E00450) | EACH | 30 | $117.25 | $108.00 | $117.25 |
| 51 | Connection, unfused pull apart (625E00460) | EACH | 15 | $96.00 | $108.00 | $96.00 |
| 52 | Connection, unfused permanent (625E00480) | EACH | 24 | $145.20 | $108.00 | $145.20 |
| 53 | Light pole, decorative, as per plan (625E10481) | EACH | 13 | $3,125.00 | $3,840.00 | $3,125.00 |
| 54 | Light pole foundation (625E14500) | EACH | 13 | $1,510.00 | $2,256.00 | $1,510.00 |
| 55 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 41 | $5.80 | $3.80 | $5.80 |
| 56 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 12,400 | $1.50 | $3.15 | $1.50 |
| 57 | No. 12 AWG pole and bracket cable (625E23410) | FT | 1,200 | $1.75 | $2.15 | $1.75 |
| 58 | Conduit, 2", 725.04 (625E25400) | FT | 1,052 | $16.50 | $17.20 | $16.50 |
| 59 | Conduit, 3", 725.04 (625E25500) | FT | 12 | $34.00 | $35.00 | $34.00 |
| 60 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 740 | $98.00 | $51.50 | $88.00 |
| 61 | Luminaire, decorative, as per plan, black finish (625E27551) | EACH | 17 | $1,700.00 | $1,075.00 | $1,700.00 |
| 62 | Trench (625E29000) | FT | 860 | $4.70 | $16.00 | $4.70 |
| 63 | Trench in paved area (625E29400) | FT | 204 | $120.00 | $21.50 | $120.00 |
| 64 | Pull box, 725.08, 18" (625E30700) | EACH | 9 | $836.00 | $1,075.00 | $836.00 |
| 65 | Ground rod (625E32000) | EACH | 16 | $160.00 | $285.00 | $160.00 |
| 66 | Power service, as per plan (625E34001) | EACH | 1 | $2,575.00 | $5,900.00 | $2,575.00 |
| 67 | Control center cabinet, complete (625E34450) | EACH | 1 | $6,100.00 | $10,640 | $6,100.00 |
| 68 | Special - maintain existing lighting (625E40000) | LS | 1 | $2,400.00 | $2,685.00 | $2,400.00 |
| 69 | Arc flash calculations and label, CC-1 (625E76000) | EACH | 1 | $2,750.00 | $3,870.00 | $2,750.00 |
| 70 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $357.00 | $645.00 | $357.50 |
| 71 | Ground mounted support, no. 2 post (630E02100) | FT | 72 | $107.00 | $24.00 | $22.50 |
| 72 | Ground mounted support, no. 3 post (630E03100) | FT | 52 | $11.00 | $27.00 | $25.00 |
| 73 | Sign post reflector (630E08600) | EACH | 4 | $56.00 | $54.00 | $50.00 |
| 74 | Sign, flat sheet (630E80100) | SF | 36 | $30.00 | $32.25 | $30.00 |
| 75 | Sign, double faced, street name (630E80500) | EACH | 4 | $121.00 | $275.00 | $255.00 |
| 76 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $102.00 | $81.00 | $75.00 |
| 77 | Removal of ground mounted post support and storage (630E86006) | EACH | 6 | $85.00 | $27.00 | $25.00 |
| 78 | School speed limit sign assembly, 24" X 36" (631E92990) | EACH | 2 | $3,234.00 | $3,760.00 | $3,234.00 |
| 79 | Removal, misc.:school speed limit sign assembly, 2 (631E94490) | EACH | 2 | $247.50 | $430.00 | $247.50 |
| 80 | Stop line (644E00500) | FT | 84 | $9.50 | $9.15 | $8.50 |
| 81 | Crosswalk line, 24", as per plan (644E00631) | FT | 440 | $8.35 | $8.10 | $7.50 |
| 82 | Parking lot stall marking (644E01200) | FT | 862 | $3.10 | $3.00 | $2.75 |
| 83 | Handicap symbol marking (644E01600) | EACH | 4 | $120.00 | $113.00 | $105.00 |
| 84 | Removal of pavement marking (644E30000) | FT | 1,583 | $2.00 | $1.80 | $1.65 |
| 85 | 4" conduit, type E (611E00400) | FT | 120 | $6.15 | $4.80 | $6.15 |
| 86 | Conduit, 2", 725.04 (625E25400) | FT | 271 | $11.65 | $17.00 | $11.65 |
| 87 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 70 | $100.00 | $53.00 | $88.00 |
| 88 | Trench (625E29000) | FT | 271 | $3.00 | $16.00 | $3.00 |
| 89 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $630.00 | $1,050.00 | $630.00 |
| 90 | Ground rod (625E32000) | EACH | 2 | $167.00 | $295.00 | $167.00 |
| 91 | Arc flash calculations and label, SP-1 (625E76000) | EACH | 1 | $2,750.00 | $3,870.00 | $2,750.00 |
| 92 | Vehicular signal head, (LED), 1-section, 12" lens, 1-way, polycarbonate (632E04802) | EACH | 8 | $422.00 | $970.00 | $422.00 |
| 93 | Covering of vehicular signal head (632E25000) | EACH | 8 | $15.00 | $43.00 | $15.00 |
| 94 | Messenger wire, 7 strand, 1/4" diameter with accessories (632E29900) | FT | 127 | $6.50 | $22.00 | $6.50 |
| 95 | Tether wire, with accessories (632E30600) | FT | 127 | $16.00 | $21.50 | $16.00 |
| 96 | Signal cable, 3 conductor, no. 14 AWG (632E40300) | FT | 434 | $4.00 | $3.25 | $4.00 |
| 97 | Strain pole foundation (632E64000) | EACH | 2 | $4,925.00 | $10,315 | $4,925.00 |
| 98 | Test hole performed (632E64950) | EACH | 2 | $275.00 | $135.00 | $275.00 |
| 99 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 32 | $4.85 | $8.60 | $4.85 |
| 100 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 331 | $1.75 | $9.15 | $1.75 |
| 101 | Power service, as per plan (632E70001) | EACH | 1 | $3,060.00 | $2,060.00 | $3,060.00 |
| 102 | Strain pole, type TC-81.11, design 8, as per plan (632E86121) | EACH | 2 | $14,250 | $16,550 | $14,250 |
| 103 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $5,000.00 | $1,720.00 | $5,000.00 |
| 104 | Flasher controller (633E71000) | EACH | 1 | $950.00 | $1,720.00 | $950.00 |
| 105 | Water (616E10000) | MGAL | 5 | $500.00 | $106.00 | $250.00 |
| 106 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,778 | $7,084.00 | $10,000 |
| 107 | Maintaining traffic (614E11000) | LS | 1 | $49,112 | $80,000 | $110,000 |
| 108 | Field office, type B (619E16010) | MNTH | 15 | $1,000.00 | $2,900.00 | $2,000.00 |
| 109 | Construction layout stakes and surveying (623E10000) | LS | 1 | $96,711 | $6,000.00 | $14,000 |
| 110 | Mobilization (624E10000) | LS | 1 | $94,471 | $40,000 | $60,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.