ODOT contract 250160 bid tabulation
JAC-SR 93-07.35 (CULVERT REPLACEMENT). Let by Ohio DOT on March 27, 2025, JAC. 5 bids received; low bid $387,909 by Fillmore Construction, -29% against the engineer's estimate of $544,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 48
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fillmore Construction | $387,909 | Low | -29% |
| 2 | Scioto Valley Paving LLC | $433,382 | +12% | -20% |
| 3 | Axis Civil Construction LLC | $434,323 | +12% | -20% |
| 4 | Eclipse Co LLC | $527,612 | +36% | -3.0% |
| 5 | D G M Inc | $546,656 | +41% | 0.0% |
Engineer's estimate: $544,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fillmore Construction | 2. Scioto Valley Paving LLC | 3. Axis Civil Construction LLC | 4. Eclipse Co LLC | 5. D G M Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $7,500.00 | $7,500.00 | $10,000 | $3,500.00 | $12,000 |
| 2 | Pavement removed (202E23000) | SY | 592 | $15.00 | $23.00 | $11.00 | $15.50 | $12.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 5 | $50.00 | $24.00 | $50.00 | $99.50 | $25.00 |
| 4 | Pipe removed, over 24", as per plan (202E35201) | FT | 49 | $100.00 | $125.00 | $180.00 | $163.00 | $160.00 |
| 5 | Guardrail removed (202E38000) | FT | 203 | $5.00 | $14.00 | $4.50 | $10.00 | $1.00 |
| 6 | Excavation (203E10000) | CY | 585 | $20.00 | $40.00 | $25.00 | $43.00 | $25.00 |
| 7 | Embankment (203E20000) | CY | 519 | $25.00 | $48.00 | $25.00 | $39.00 | $25.00 |
| 8 | Subgrade compaction (204E10000) | SY | 969 | $5.00 | $6.00 | $4.00 | $1.00 | $5.00 |
| 9 | Proof rolling (204E45000) | HR | 1 | $100.00 | $200.00 | $200.00 | $357.50 | $100.00 |
| 10 | Reference monument, type A (623E40500) | EACH | 4 | $2,500.00 | $1,000.00 | $950.00 | $777.50 | $400.00 |
| 11 | Rock channel protection, type B with filter (601E32100) | CY | 23 | $140.00 | $280.00 | $135.00 | $144.50 | $125.00 |
| 12 | Rock channel protection, type C with filter (601E32200) | CY | 50 | $120.00 | $275.00 | $135.00 | $144.50 | $120.00 |
| 13 | Seeding and mulching (659E10000) | SY | 1,596 | $3.00 | $4.50 | $2.20 | $2.20 | $3.00 |
| 14 | Repair seeding and mulching (659E14000) | SY | 80 | $3.00 | $4.50 | $2.20 | $2.20 | $0.05 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.22 | $1,000.00 | $1.00 | $1,250.00 | $1,250.00 | $1,500.00 |
| 16 | Lime (659E31000) | ACRE | 0.33 | $1,000.00 | $1.00 | $150.00 | $150.00 | $300.00 |
| 17 | Water (659E35000) | MGAL | 5 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $7,500.00 | $10,000 | $7,500.00 | $20,000 | $500.00 |
| 20 | Concrete masonry (602E20000) | CY | 5.90 | $1,500.00 | $1,100.00 | $1,590.00 | $1,260.50 | $1,250.00 |
| 21 | Aggregate drains (605E31100) | FT | 240 | $25.00 | $30.00 | $15.00 | $27.50 | $25.00 |
| 22 | 18" conduit, type C (611E07600) | FT | 90 | $100.00 | $175.00 | $50.00 | $149.00 | $150.00 |
| 23 | 72" conduit, type A, 707.01 metallic coated (alumi (611E26000) | FT | 128 | $500.00 | $490.00 | $610.00 | $568.00 | $1,325.00 |
| 24 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $3,500.00 | $3,500.00 | $4,900.00 | $5,694.00 | $2,500.00 |
| 25 | Pavement repair (253E02000) | CY | 100 | $100.00 | $20.00 | $130.00 | $500.00 | $345.00 |
| 26 | Pavement planing, asphalt concrete, variable thick (254E01000) | SY | 345 | $25.00 | $30.00 | $18.00 | $23.00 | $22.00 |
| 27 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 224 | $200.00 | $320.00 | $290.00 | $249.00 | $245.00 |
| 28 | Aggregate base (304E20000) | CY | 155 | $60.00 | $160.00 | $120.00 | $122.50 | $100.00 |
| 29 | Tack coat (407E10000) | GAL | 453 | $4.00 | $0.25 | $5.00 | $2.50 | $2.50 |
| 30 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 251 | $228.00 | $90.00 | $300.00 | $260.00 | $220.00 |
| 31 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 51 | $240.00 | $375.00 | $295.00 | $360.00 | $300.00 |
| 32 | RPM (621E00100) | EACH | 5 | $394.00 | $800.00 | $525.00 | $525.00 | $500.00 |
| 33 | Raised pavement marker removed (621E54000) | EACH | 5 | $50.00 | $30.00 | $50.00 | $31.50 | $1.00 |
| 34 | Ground mounted support, no. 3 post (630E03100) | FT | 28 | $21.00 | $30.00 | $13.00 | $21.00 | $30.00 |
| 35 | Sign post reflector (630E08600) | EACH | 2 | $75.00 | $20.00 | $23.00 | $75.00 | $75.00 |
| 36 | Sign, flat sheet (630E80100) | SF | 14.80 | $23.50 | $45.00 | $25.00 | $23.50 | $30.00 |
| 37 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $40.00 | $200.00 | $70.00 | $40.00 | $15.00 |
| 38 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $35.00 | $200.00 | $100.00 | $35.00 | $15.00 |
| 39 | Edge line, 6", type 1 (642E00104) | MI | 0.10 | $14,450 | $40,000 | $8,650.00 | $8,650.00 | $9,200.00 |
| 40 | Center line, type 1 (642E00300) | MI | 0.05 | $28,900 | $40,000 | $16,750 | $16,750 | $17,500 |
| 41 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 8 | $100.00 | $75.00 | $65.00 | $65.00 | $60.00 |
| 42 | Detour signing (614E12420) | LS | 1 | $8,995.00 | $4,000.00 | $4,500.00 | $4,500.00 | $5,000.00 |
| 43 | Water (616E10000) | MGAL | 1 | $10.00 | $1.00 | $1.00 | $211.00 | $1.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,500.00 | $6,000.00 | $4,500.00 | $9,500.00 | $25,000 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $18,850 | $5,500.00 | $6,500.00 | $15,500 | $20,000 |
| 46 | Field office, type A (619E16000) | MNTH | 1 | $1,000.00 | $100.00 | $1,850.00 | $1,021.50 | $1,250.00 |
| 47 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,500.00 | $6,900.00 | $6,500.00 | $5,000.00 | $5,000.00 |
| 48 | Mobilization (624E10000) | LS | 1 | $20,000 | $20,000 | $20,000 | $49,714 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.