ODOT contract 250176 bid tabulation

D08-PM/RPM-FY2025 (PAVEMENT MARKING). Let by Ohio DOT on March 27, 2025, District 8. 2 bids received; low bid $3,555,000 by The Aero-Mark Company LLC, -22% against the engineer's estimate of $4,533,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
48
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1The Aero-Mark Company LLC$3,555,000Low-22%
2Oglesby Construction Inc$3,966,398+12%-12%
ODOT contract 250176: bids by rank

Engineer's estimate: $4,533,000.

Bid tabulation

LinePay itemUnitQuantity1. The Aero-Mark Company LLC2. Oglesby Construction Inc
1RPM (621E00100)EACH250$16.00$16.00
2RPM reflector, as per plan (621E00301)EACH53,610$6.30$6.30
3Raised pavement marker removed (621E54000)EACH50$5.00$5.00
4Edge line, 4", type 1 (642E00100)MI48.23$444.00$520.00
5Edge line, 6", type 1 (642E00104)MI2,137.83$664.00$690.00
6Lane line, 4", type 1 (642E00200)MI1.02$276.00$355.00
7Lane line, 6", type 1 (642E00204)MI632.11$324.00$320.00
8Center line, type 1 (642E00300)MI680.73$644.00$745.00
9Channelizing line, 8", type 1 (642E00400)FT137,648$0.50$0.39
10Channelizing line, 12", type 1 (642E00404)FT334,896$0.54$0.50
11Stop line, type 1 (642E00500)FT32,502$3.75$4.60
12Crosswalk line, 12", type 1 (642E00620)FT24,159$2.65$2.50
13Crosswalk line, 24", type 1, as per plan (642E00631)FT1,042$2.65$4.50
14Transverse/diagonal line, type 1 (642E00700)FT108,653$2.65$3.60
15Chevron marking, type 1 (642E00720)FT8,795$2.65$3.50
16Island marking, type 1 (642E00900)SF6,938$1.25$1.00
17Railroad symbol marking, type 1 (642E01000)EACH27$375.00$350.00
18School symbol marking, 96", type 1 (642E01110)EACH27$375.00$350.00
19Lane arrow, type 1 (642E01300)EACH2,339$60.00$55.00
20Lane reduction arrow, type 1 (642E01312)EACH10$285.00$300.00
21Wrong way arrow, type 1 (642E01322)EACH133$200.00$300.00
22Word on pavement, 96", type 1 (642E01410)EACH292$70.00$120.00
23Yield line, type 1 (642E20802)FT57$5.00$10.00
24Removal of pavement marking (642E30000)FT100$7.00$10.00
25Removal of pavement marking (642E30020)EACH5$200.00$250.00
26Speed measurement marking (642E40000)EACH236$85.00$150.00
27Pavement marking, misc.: supplemental work reques (642E50010)EACH25$1,000.00$1,000.00
28Stop line (644E00500)FT100$11.25$6.30
29Transverse/diagonal line (644E00700)FT100$11.25$6.30
30Chevron marking (644E00720)FT100$11.25$6.30
31Island marking (644E00900)SF100$6.65$3.50
32School symbol marking, 96" (644E01110)EACH1$555.00$500.00
33Lane arrow (644E01300)EACH5$175.00$125.00
34Lane reduction arrow (644E01350)EACH5$265.00$250.00
35Wrong way arrow (644E01360)EACH5$265.00$250.00
36Dotted line, 4" (644E01500)FT100$4.45$2.00
37Dotted line, 6" (644E01510)FT120$4.45$2.20
38Bike lane symbol marking (644E01630)EACH1$1,270.00$275.00
39Shared lane marking (644E19000)EACH1$1,155.00$275.00
40Yield line (644E20800)FT12$60.85$5.00
41Removal of pavement marking (644E30000)FT100$12.00$12.50
42Removal of pavement marking (644E30020)EACH5$250.00$250.00
43Speed measurement marking (644E40000)EACH32$100.00$350.00
44Law enforcement officer with patrol car for assistance (614E11110)HR150$65.00$100.00
45Portable changeable message sign, as per plan (614E18601)SNMT1$1,000.00$1,000.00
46Premium for contract performance bond and for payment bond (103E05000)LS1$16,177$21,000
47Maintaining traffic (614E11000)LS1$45,000$83,000
48Mobilization (624E10000)LS1$23,000$120,500
ODOT contract 250176: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy