ODOT contract 250163 bid tabulation
PER-MR 280-00.10 (Scotch Hill) (DEMOLITION). Let by Ohio DOT on March 27, 2025, PER. 9 bids received; low bid $134,536 by Axis Civil Construction LLC, -35% against the engineer's estimate of $207,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 30
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Axis Civil Construction LLC | $134,536 | Low | -35% |
| 2 | Layton Services | $175,166 | +30% | -15% |
| 3 | Buds Inc | $176,254 | +31% | -15% |
| 4 | Complete General Construction Company | $179,711 | +34% | -13% |
| 5 | Alan Stone Co Inc | $202,169 | +50% | -2.0% |
| 6 | S E T Inc | $231,292 | +72% | +12% |
| 7 | Double Z Construction Company | $266,823 | +98% | +29% |
| 8 | Baumann Enterprises Inc | $320,256 | +138% | +55% |
| 9 | Eclipse Co LLC | $354,389 | +163% | +71% |
Engineer's estimate: $207,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Axis Civil Construction LLC | 2. Layton Services | 3. Buds Inc | 4. Complete General Construction Company | 5. Alan Stone Co Inc | 6. S E T Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $7,500.00 | $7,000.00 | $15,000 | $11,000 | $8,000.00 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 100 | $15.00 | $30.00 | $20.00 | $50.00 | $15.00 | $35.00 |
| 3 | Guardrail removed (202E38000) | FT | 53 | $10.00 | $50.00 | $5.00 | $5.00 | $20.00 | $5.50 |
| 4 | Excavation (203E10000) | CY | 866 | $32.00 | $54.00 | $23.00 | $20.00 | $60.00 | $30.00 |
| 5 | Embankment (203E20000) | CY | 239 | $12.00 | $23.00 | $6.00 | $35.00 | $15.00 | $18.00 |
| 6 | Guardrail, type MGS (606E15050) | FT | 25 | $86.52 | $86.55 | $40.00 | $92.80 | $50.00 | $95.00 |
| 7 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,150.00 | $1,150.00 | $1,500.00 | $1,780.00 | $1,900.00 | $1,250.00 |
| 8 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 39 | $120.00 | $200.00 | $85.00 | $150.00 | $120.00 | $120.00 |
| 9 | Topsoil furnished and placed (653E10000) | CY | 54 | $58.00 | $80.00 | $20.00 | $50.00 | $45.00 | $105.00 |
| 10 | Seeding and mulching (659E10000) | SY | 482 | $6.00 | $6.00 | $3.00 | $6.00 | $6.50 | $4.50 |
| 11 | Repair seeding and mulching (659E14000) | SY | 25 | $6.00 | $6.00 | $0.10 | $6.00 | $15.00 | $5.50 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.06 | $1,250.00 | $1,250.00 | $600.00 | $1,250.00 | $710.00 | $1,600.00 |
| 13 | Water (659E35000) | MGAL | 3 | $1.00 | $1.00 | $0.50 | $1.00 | $130.00 | $10.00 |
| 14 | Slope erosion protection mat, type E (670E00550) | SY | 382 | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 | $3.60 |
| 15 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | 8" conduit, type B (611E01800) | FT | 25 | $18.00 | $50.00 | $5.00 | $8.00 | $45.00 | $15.00 |
| 17 | 8" conduit, type E (611E02500) | FT | 25 | $18.00 | $20.00 | $5.00 | $8.00 | $45.00 | $7.00 |
| 18 | 8" conduit, type F (611E02600) | FT | 25 | $18.00 | $20.00 | $5.00 | $8.00 | $45.00 | $7.00 |
| 19 | Barrier reflector, type 2, two-way (626E00110) | EACH | 6 | $10.00 | $10.00 | $12.50 | $15.00 | $15.00 | $11.00 |
| 20 | Ground mounted support, no. 2 post (630E02100) | FT | 57.60 | $12.00 | $12.00 | $21.00 | $18.00 | $25.00 | $13.00 |
| 21 | Ground mounted support, no. 3 post (630E03100) | FT | 70 | $13.00 | $13.00 | $22.00 | $20.40 | $30.00 | $14.00 |
| 22 | Sign post reflector (630E08600) | EACH | 8 | $23.00 | $23.00 | $55.00 | $45.00 | $70.00 | $28.00 |
| 23 | Sign, flat sheet (630E80100) | SF | 51.60 | $25.00 | $25.00 | $25.00 | $22.00 | $30.00 | $30.00 |
| 24 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $75.00 | $100.00 | $30.00 | $10.00 | $40.00 | $24.00 |
| 25 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $75.00 | $100.00 | $30.00 | $15.00 | $40.00 | $24.00 |
| 26 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $42,000 | $55,470 | $79,000 | $85,000 | $64,000 | $133,000 |
| 27 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,500.00 | $5,000.00 | $4,000.00 | $2,000.00 | $5,000.00 | $5,000.00 |
| 28 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $2,500.00 | $3,500.00 | $5,000.00 | $3,000.00 | $5,000.00 | $5,500.00 |
| 29 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,500.00 | $7,000.00 | $4,000.00 | $5,000.00 | $7,000.00 | $1,500.00 |
| 30 | Mobilization (624E10000) | LS | 1 | $12,000 | $4,000.00 | $20,000 | $9,000.00 | $17,000 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.