ODOT contract 250163 bid tabulation

PER-MR 280-00.10 (Scotch Hill) (DEMOLITION). Let by Ohio DOT on March 27, 2025, PER. 9 bids received; low bid $134,536 by Axis Civil Construction LLC, -35% against the engineer's estimate of $207,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
30
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Axis Civil Construction LLC$134,536Low-35%
2Layton Services$175,166+30%-15%
3Buds Inc$176,254+31%-15%
4Complete General Construction Company$179,711+34%-13%
5Alan Stone Co Inc$202,169+50%-2.0%
6S E T Inc$231,292+72%+12%
7Double Z Construction Company$266,823+98%+29%
8Baumann Enterprises Inc$320,256+138%+55%
9Eclipse Co LLC$354,389+163%+71%
ODOT contract 250163: bids by rank

Engineer's estimate: $207,000.

Bid tabulation

LinePay itemUnitQuantity1. Axis Civil Construction LLC2. Layton Services3. Buds Inc4. Complete General Construction Company5. Alan Stone Co Inc6. S E T Inc
1Clearing and grubbing, as per plan (201E11001)LS1$7,500.00$7,000.00$15,000$11,000$8,000.00$5,000.00
2Pavement removed (202E23000)SY100$15.00$30.00$20.00$50.00$15.00$35.00
3Guardrail removed (202E38000)FT53$10.00$50.00$5.00$5.00$20.00$5.50
4Excavation (203E10000)CY866$32.00$54.00$23.00$20.00$60.00$30.00
5Embankment (203E20000)CY239$12.00$23.00$6.00$35.00$15.00$18.00
6Guardrail, type MGS (606E15050)FT25$86.52$86.55$40.00$92.80$50.00$95.00
7Anchor assembly, MGS type T (606E26550)EACH5$1,150.00$1,150.00$1,500.00$1,780.00$1,900.00$1,250.00
8Rock channel protection, type B with geotextile fabric (601E32104)CY39$120.00$200.00$85.00$150.00$120.00$120.00
9Topsoil furnished and placed (653E10000)CY54$58.00$80.00$20.00$50.00$45.00$105.00
10Seeding and mulching (659E10000)SY482$6.00$6.00$3.00$6.00$6.50$4.50
11Repair seeding and mulching (659E14000)SY25$6.00$6.00$0.10$6.00$15.00$5.50
12Commercial fertilizer (659E20000)TON0.06$1,250.00$1,250.00$600.00$1,250.00$710.00$1,600.00
13Water (659E35000)MGAL3$1.00$1.00$0.50$1.00$130.00$10.00
14Slope erosion protection mat, type E (670E00550)SY382$3.00$3.00$3.00$3.00$5.00$3.60
15Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00$1.00
168" conduit, type B (611E01800)FT25$18.00$50.00$5.00$8.00$45.00$15.00
178" conduit, type E (611E02500)FT25$18.00$20.00$5.00$8.00$45.00$7.00
188" conduit, type F (611E02600)FT25$18.00$20.00$5.00$8.00$45.00$7.00
19Barrier reflector, type 2, two-way (626E00110)EACH6$10.00$10.00$12.50$15.00$15.00$11.00
20Ground mounted support, no. 2 post (630E02100)FT57.60$12.00$12.00$21.00$18.00$25.00$13.00
21Ground mounted support, no. 3 post (630E03100)FT70$13.00$13.00$22.00$20.40$30.00$14.00
22Sign post reflector (630E08600)EACH8$23.00$23.00$55.00$45.00$70.00$28.00
23Sign, flat sheet (630E80100)SF51.60$25.00$25.00$25.00$22.00$30.00$30.00
24Removal of ground mounted sign and disposal (630E84900)EACH3$75.00$100.00$30.00$10.00$40.00$24.00
25Removal of ground mounted post support and disposal (630E86002)EACH3$75.00$100.00$30.00$15.00$40.00$24.00
26Structure removed, over 20 foot span, as per plan (202E11003)LS1$42,000$55,470$79,000$85,000$64,000$133,000
27Premium for contract performance bond and for payment bond (103E05000)LS1$3,500.00$5,000.00$4,000.00$2,000.00$5,000.00$5,000.00
28Maintaining traffic, as per plan (614E11001)LS1$2,500.00$3,500.00$5,000.00$3,000.00$5,000.00$5,500.00
29Construction layout stakes and surveying (623E10000)LS1$4,500.00$7,000.00$4,000.00$5,000.00$7,000.00$1,500.00
30Mobilization (624E10000)LS1$12,000$4,000.00$20,000$9,000.00$17,000$15,000
ODOT contract 250163: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy