ODOT contract 254011 bid tabulation

D07-CHIP-FY25 (A) (CHIP SEAL). Let by Ohio DOT on March 27, 2025, District 7. 2 bids received; low bid $984,011 by Axis Civil Construction LLC, +10% against the engineer's estimate of $894,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
17
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Axis Civil Construction LLC$984,011Low+10%
2Scioto Valley Paving LLC$1,049,323+7.0%+17%
ODOT contract 254011: bids by rank

Engineer's estimate: $894,000.

Bid tabulation

LinePay itemUnitQuantity1. Axis Civil Construction LLC2. Scioto Valley Paving LLC
1Partial depth pavement repair (441), as per plan (251E01001)SY725$125.00$67.00
2Aggregate, single chip seal, type A (422E11000)SY213,269$1.15$1.00
3Emulsion, chip seal (422E25000)GAL85,309$3.25$3.20
4RPM (621E00100)EACH1,118$34.00$38.00
5Raised pavement marker removed (621E54000)EACH1,118$18.00$30.00
6Edge line, 6", type 1 (642E00104)MI59.12$844.00$990.00
7Center line, type 1 (642E00300)MI29.56$955.00$900.00
8Stop line, type 1 (642E00500)FT340$8.05$10.00
9Removal of pavement marking (642E30000)FT170$5.00$5.90
10Removal of pavement marking (642E30030)MI14.78$1,395.00$1,050.00
11Removal of pavement marking (642E30030)MI29.56$1,395.00$1,050.00
12Work zone marking sign (614E12460)EACH105$185.00$100.00
13Work zone center line, class I, 642 paint (614E21100)MI29.56$910.00$925.00
14Work zone stop line, class I, 642 paint (614E26200)FT340$3.95$4.50
15Premium for contract performance bond and for payment bond (103E05000)LS1$9,500.00$48,000
16Maintaining traffic (614E11000)LS1$80,000$125,000
17Mobilization (624E10000)LS1$32,000$90,000
ODOT contract 254011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy