| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,219.06 |
| 2 | Pavement removed (202E23000) | SY | 3,380 | $16.70 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 124 | $19.42 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $1,262.62 |
| 5 | Catch basin removed (202E58100) | EACH | 2 | $556.38 |
| 6 | Monument assembly removed (202E60010) | EACH | 2 | $189.06 |
| 7 | Special - fill and plug existing conduit (202E70000) | FT | 42 | $55.55 |
| 8 | Excavation (203E10000) | CY | 3,114 | $41.29 |
| 9 | Embankment (203E20000) | CY | 1,541 | $19.90 |
| 10 | Subgrade compaction (204E10000) | SY | 10,013 | $4.75 |
| 11 | Excavation of subgrade (204E13000) | CY | 3,741 | $36.33 |
| 12 | Granular material, type B (204E30010) | CY | 3,741 | $73.64 |
| 13 | Proof rolling (204E45000) | HR | 5 | $243.14 |
| 14 | Geotextile fabric (204E50000) | SY | 10,013 | $2.80 |
| 15 | Guardrail, type 5 (606E13000) | FT | 63 | $25.00 |
| 16 | Anchor assembly, type T (606E26500) | EACH | 1 | $1,200.00 |
| 17 | Monument assembly, type C (623E38500) | EACH | 1 | $1,407.54 |
| 18 | Reference monument, type A (623E40500) | EACH | 2 | $1,141.37 |
| 19 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 11 | $226.22 |
| 20 | Topsoil (659E00300) | CY | 433 | $50.57 |
| 21 | Seeding and mulching (659E10000) | SY | 3,903 | $2.23 |
| 22 | Repair seeding and mulching (659E14000) | SY | 195 | $2.00 |
| 23 | Lime (659E31000) | ACRE | 0.81 | $450.00 |
| 24 | Water (659E35000) | MGAL | 22 | $10.00 |
| 25 | Ditch erosion protection (670E00700) | SY | 131 | $2.00 |
| 26 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,375.00 |
| 27 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $9,180.00 |
| 28 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $9,101.28 |
| 29 | Erosion control (832E30000) | EACH | 22,400 | $1.00 |
| 30 | Concrete masonry (602E20000) | CY | 1 | $1,540.33 |
| 31 | 6" shallow pipe underdrains (605E11100) | FT | 3,504 | $13.04 |
| 32 | 6" unclassified pipe underdrains (605E13300) | FT | 300 | $23.63 |
| 33 | 6" base pipe underdrains (605E14000) | FT | 3,233 | $15.06 |
| 34 | Aggregate drains (605E31100) | FT | 129 | $21.51 |
| 35 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 301 | $47.56 |
| 36 | 6" conduit, type F (611E01500) | FT | 50 | $26.05 |
| 37 | 12" conduit, type B (611E04400) | FT | 280 | $110.32 |
| 38 | 12" conduit, type B (611E04400) | FT | 10 | $464.47 |
| 39 | 15" conduit, type B (611E05900) | FT | 231 | $113.30 |
| 40 | 15" conduit, type C (611E06100) | FT | 8 | $197.69 |
| 41 | 18" conduit, type B (611E07400) | FT | 848 | $141.41 |
| 42 | 24" conduit, type B (611E10400) | FT | 7 | $535.72 |
| 43 | Conduit, bored or jacked, 24" (611E96600) | FT | 76 | $1,031.68 |
| 44 | Catch basin, no. 3, as per plan (611E98151) | EACH | 4 | $7,681.81 |
| 45 | Catch basin, no. 3A (611E98180) | EACH | 2 | $4,039.08 |
| 46 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 6 | $7,011.84 |
| 47 | Catch basin, no. 8 (611E98410) | EACH | 2 | $6,242.28 |
| 48 | Manhole, no. 3 (611E99574) | EACH | 1 | $4,723.08 |
| 49 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $445.30 |
| 50 | Pavement planing, asphalt concrete 1.25" (254E01000) | SY | 10,095 | $3.04 |
| 51 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,084 | $180.50 |
| 52 | Aggregate base (304E20000) | CY | 1,680 | $91.10 |
| 53 | Aggregate base (304E20000) | CY | 14 | $286.72 |
| 54 | Non-tracking tack coat (407E20000) | GAL | 2,389 | $3.90 |
| 55 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 630 | $219.50 |
| 56 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 401 | $229.50 |
| 57 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 3 | $950.00 |
| 58 | Curb, type 4-C (609E24510) | FT | 2,477 | $29.07 |
| 59 | 4" concrete traffic island (609E50000) | SY | 1,553 | $55.91 |
| 60 | 6" concrete traffic island (609E54000) | SY | 58 | $180.07 |
| 61 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 2,211 | $3.08 |
| 62 | Connection, fused pull apart (625E00450) | EACH | 20 | $165.00 |
| 63 | Connection, unfused permanent (625E00480) | EACH | 18 | $155.00 |
| 64 | Light pole, conventional, AT10B30 (625E10490) | EACH | 2 | $3,400.00 |
| 65 | Light pole, conventional, AT22B40 (625E10490) | EACH | 8 | $4,800.00 |
| 66 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 2 | $1,925.00 |
| 67 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 8 | $1,950.00 |
| 68 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 909 | $4.00 |
| 69 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,728 | $2.50 |
| 70 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 2,566 | $15.00 |
| 71 | Conduit, 2", 725.051 (625E25408) | FT | 20 | $3.80 |
| 72 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 619 | $32.00 |
| 73 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 10 | $550.00 |
| 74 | Trench (625E29000) | FT | 1,898 | $9.00 |
| 75 | Pull box, 725.08, 18" (625E30700) | EACH | 5 | $1,450.00 |
| 76 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,800.00 |
| 77 | Pull box removed (625E31510) | EACH | 1 | $500.00 |
| 78 | Ground rod (625E32000) | EACH | 10 | $400.00 |
| 79 | Power service, as per plan (625E34001) | EACH | 1 | $16,500 |
| 80 | Underground warning marking tape (625E36010) | FT | 1,898 | $2.50 |
| 81 | Light pole removed for storage (625E75402) | EACH | 2 | $1,000.00 |
| 82 | Light pole foundation removed (625E75500) | EACH | 2 | $750.00 |
| 83 | Distribution cable removed (625E75550) | FT | 825 | $1.30 |
| 84 | Arc flash calculations and label lighting control (625E76000) | EACH | 1 | $3,800.00 |
| 85 | Lighting, misc.: fill and plug existing lighting C (625E98100) | FT | 275 | $20.00 |
| 86 | Delineator, post surface mounted (620E60000) | EACH | 47 | $115.00 |
| 87 | RPM (621E00100) | EACH | 199 | $45.00 |
| 88 | Raised pavement marker removed (621E54000) | EACH | 174 | $13.08 |
| 89 | Ground mounted support, no. 3 post (630E03100) | FT | 630 | $14.00 |
| 90 | Ground mounted support, no. 4 post (630E04100) | FT | 91 | $21.00 |
| 91 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 253 | $21.00 |
| 92 | Sign post reflector (630E08600) | EACH | 29 | $45.00 |
| 93 | Breakaway structural beam connection (630E09000) | EACH | 14 | $310.00 |
| 94 | Sign, flat sheet (630E80100) | SF | 643 | $20.31 |
| 95 | Ground mounted structural beam support foundation (630E84500) | EACH | 14 | $500.00 |
| 96 | Removal of ground mounted sign and disposal (630E84900) | EACH | 43 | $20.00 |
| 97 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $125.00 |
| 98 | Removal of ground mounted post support and disposal (630E86002) | EACH | 27 | $20.00 |
| 99 | Removal of ground mounted post support and reerection (630E86010) | EACH | 2 | $250.00 |
| 100 | Removal of ground mounted structural beam support (630E86102) | EACH | 4 | $375.00 |
| 101 | Edge line, 6" (644E00104) | MI | 1.31 | $6,150.00 |
| 102 | Lane line, 6" (644E00204) | MI | 1.33 | $2,900.00 |
| 103 | Center line (644E00300) | MI | 0.07 | $7,885.00 |
| 104 | Channelizing line, 8" (644E00400) | FT | 1,937 | $1.50 |
| 105 | Stop line (644E00500) | FT | 39 | $5.50 |
| 106 | Lane arrow (644E01300) | EACH | 18 | $200.00 |
| 107 | Dotted line, 6" (644E01510) | FT | 843 | $1.40 |
| 108 | Yield line (644E20800) | FT | 117 | $7.75 |
| 109 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $3,800.00 |
| 110 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $75.00 |
| 111 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 11 | $2,036.57 |
| 112 | Work zone increased penalties sign (614E12484) | EACH | 4 | $248.02 |
| 113 | Barrier reflector, type 1, one-way (614E13310) | EACH | 171 | $11.26 |
| 114 | Object marker, one way (614E13350) | EACH | 171 | $20.35 |
| 115 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $1,113.07 |
| 116 | Work zone center line, class I (614E21000) | MI | 0.10 | $3,345.00 |
| 117 | Work zone edge line, class I, 4" (614E22000) | MI | 3.51 | $1,880.00 |
| 118 | Work zone channelizing line, class I, 8" (614E23000) | FT | 1,751 | $1.05 |
| 119 | Work zone dotted line, class I (614E24000) | FT | 1,560 | $1.00 |
| 120 | Work zone stop line, class I (614E26000) | FT | 95 | $3.50 |
| 121 | Water (616E10000) | MGAL | 1 | $14.61 |
| 122 | Portable barrier, unanchored (622E41100) | FT | 8,370 | $19.40 |
| 123 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,130 |
| 124 | Maintaining traffic (614E11000) | LS | 1 | $64,867 |
| 125 | Field office, type A (619E16000) | MNTH | 9 | $1,173.89 |
| 126 | Construction layout stakes and surveying (623E10000) | LS | 1 | $38,900 |
| 127 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,800.00 |
| 128 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,800.00 |
| 129 | Mobilization (624E10000) | LS | 1 | $150,957 |