ODOT contract 250181 bid tabulation
HOC-SR 664-13.03 (MINOR RECONSTRUCTION). Let by Ohio DOT on March 27, 2025, HOC. 5 bids received; low bid $1,031,780 by Allard Excavation LLC, -9.9% against the engineer's estimate of $1,145,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 73
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allard Excavation LLC | $1,031,780 | Low | -10% |
| 2 | Axis Civil Construction LLC | $1,053,237 | +2.0% | -8.0% |
| 3 | Shelly & Sands Inc | $1,078,350 | +5.0% | -6.0% |
| 4 | Fillmore Construction | $1,138,329 | +10% | -1.0% |
| 5 | Alan Stone Co Inc | $1,364,444 | +32% | +19% |
Engineer's estimate: $1,145,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allard Excavation LLC | 2. Axis Civil Construction LLC | 3. Shelly & Sands Inc | 4. Fillmore Construction | 5. Alan Stone Co Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $11,065 | $5,200.00 | $12,800 | $12,000 | $17,000 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 244 | $9.00 | $18.00 | $40.00 | $50.00 | $40.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 110 | $15.00 | $45.00 | $20.00 | $100.00 | $15.00 |
| 5 | Mailbox removed (202E53100) | EACH | 4 | $74.00 | $100.00 | $80.00 | $200.00 | $65.00 |
| 6 | Fence removed (202E75000) | FT | 300 | $4.00 | $4.00 | $5.00 | $10.00 | $5.00 |
| 7 | Excavation (203E10000) | CY | 3,567 | $18.00 | $25.00 | $24.50 | $20.00 | $30.00 |
| 8 | Embankment (203E20000) | CY | 3,229 | $7.00 | $25.00 | $18.00 | $15.00 | $45.00 |
| 9 | Subgrade compaction (204E10000) | SY | 5,368 | $3.00 | $3.20 | $5.00 | $3.00 | $5.00 |
| 10 | Proof rolling (204E45000) | HR | 4 | $256.00 | $220.00 | $250.00 | $100.00 | $1,100.00 |
| 11 | Guardrail, type MGS (606E15050) | FT | 37.50 | $32.00 | $32.00 | $32.00 | $32.00 | $35.00 |
| 12 | Anchor assembly, MGS type E, (MASH 2016) (606E26150) | EACH | 2 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 | $3,100.00 |
| 13 | Special - mailbox support system, single (690E50100) | EACH | 4 | $312.00 | $250.00 | $150.00 | $150.00 | $170.00 |
| 14 | Riprap, type D (601E11000) | SY | 16 | $504.00 | $250.00 | $425.00 | $100.00 | $490.00 |
| 15 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $114.00 | $450.00 | $140.00 | $1,000.00 | $280.00 |
| 16 | Rock channel protection, type B with filter (601E32100) | CY | 75 | $113.00 | $110.00 | $125.00 | $300.00 | $130.00 |
| 17 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 3 | $143.00 | $180.00 | $435.00 | $1,000.00 | $440.00 |
| 18 | Topsoil (659E00300) | CY | 168 | $26.00 | $58.00 | $50.00 | $80.00 | $70.00 |
| 19 | Seeding and mulching (659E10000) | SY | 6,312 | $2.00 | $1.25 | $0.80 | $1.25 | $1.50 |
| 20 | Repair seeding and mulching (659E14000) | SY | 316 | $0.05 | $1.25 | $0.80 | $2.00 | $1.00 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.85 | $600.00 | $0.85 | $900.00 | $1,400.00 | $1,700.00 |
| 22 | Lime (659E31000) | ACRE | 1.30 | $500.00 | $150.00 | $156.00 | $450.00 | $230.00 |
| 23 | Water (659E35000) | MGAL | 51 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 |
| 24 | Slope erosion protection (670E00500) | SY | 1,509 | $4.00 | $2.50 | $1.25 | $2.00 | $2.50 |
| 25 | Ditch erosion protection mat, type B (670E00720) | SY | 86 | $2.00 | $2.50 | $2.40 | $4.00 | $2.50 |
| 26 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,146.00 | $2,500.00 | $2,700.00 | $3,500.00 | $2,900.00 |
| 27 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $13,333 | $7,350.00 | $8,100.00 | $5,000.00 | $7,400.00 |
| 28 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $10,716 | $11,000 | $9,000.00 | $5,000.00 | $11,000 |
| 29 | Erosion control (832E30000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 30 | Concrete masonry (602E20000) | CY | 3.70 | $4,223.00 | $2,550.00 | $2,100.00 | $2,000.00 | $2,000.00 |
| 31 | 6" unclassified pipe underdrains (605E13300) | FT | 401 | $15.00 | $20.00 | $20.00 | $20.00 | $30.00 |
| 32 | 6" base pipe underdrains (605E14000) | FT | 1,076 | $14.00 | $20.00 | $19.00 | $15.00 | $25.00 |
| 33 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 102 | $8.00 | $30.00 | $25.00 | $25.00 | $25.00 |
| 34 | 18" conduit, type B (611E07400) | FT | 95 | $72.00 | $140.00 | $175.00 | $100.00 | $140.00 |
| 35 | 18" conduit, type D (611E07900) | FT | 39 | $72.00 | $110.00 | $90.00 | $90.00 | $130.00 |
| 36 | 21" conduit, type D (611E09400) | FT | 36 | $107.00 | $112.00 | $120.00 | $120.00 | $150.00 |
| 37 | 30" conduit, type A, 706.02, 707.01 aluminized (0. (611E13200) | FT | 81 | $200.00 | $250.00 | $250.00 | $400.00 | $310.00 |
| 38 | 48" conduit, type A, 706.02, 707.01 aluminized (0. (611E20700) | FT | 92 | $313.00 | $265.00 | $355.00 | $525.00 | $570.00 |
| 39 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $4,212.00 | $2,600.00 | $3,200.00 | $4,500.00 | $6,500.00 |
| 40 | Precast reinforced concrete outlet (611E99710) | EACH | 3 | $572.00 | $450.00 | $400.00 | $500.00 | $410.00 |
| 41 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 728 | $17.23 | $9.00 | $12.50 | $10.00 | $20.00 |
| 42 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 830 | $202.00 | $205.00 | $180.00 | $200.00 | $240.00 |
| 43 | Aggregate base (304E20000) | CY | 848 | $85.00 | $104.00 | $88.00 | $60.00 | $100.00 |
| 44 | Non-tracking tack coat (407E20000) | GAL | 613 | $3.90 | $6.00 | $3.50 | $3.00 | $6.50 |
| 45 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 172 | $224.00 | $225.00 | $285.00 | $240.00 | $380.00 |
| 46 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 241 | $214.00 | $215.00 | $275.00 | $220.00 | $300.00 |
| 47 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 18 | $435.00 | $390.00 | $285.00 | $300.00 | $670.00 |
| 48 | Asphalt concrete intermediate course, type 1, (449), (driveways) (441E70600) | CY | 16 | $315.00 | $380.00 | $275.00 | $280.00 | $690.00 |
| 49 | RPM (621E00100) | EACH | 50 | $85.00 | $85.00 | $85.00 | $120.34 | $100.00 |
| 50 | Barrier reflector, type 2, (BI-directional) (626E00110) | EACH | 3 | $12.00 | $12.00 | $12.00 | $12.00 | $15.00 |
| 51 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $31.00 | $60.00 | $25.00 | $25.00 | $30.00 |
| 52 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $31.00 | $90.00 | $25.00 | $25.00 | $30.00 |
| 53 | Edge line, 6" (644E00104) | MI | 0.48 | $8,250.00 | $6,800.00 | $6,800.00 | $8,250.00 | $7,900.00 |
| 54 | Center line (644E00300) | MI | 0.52 | $16,500 | $8,061.01 | $8,060.00 | $16,500 | $9,400.00 |
| 55 | Channelizing line, 8" (644E00400) | FT | 363 | $4.00 | $2.60 | $2.60 | $3.00 | $3.00 |
| 56 | Transverse/diagonal line (644E00700) | FT | 241 | $10.00 | $8.50 | $8.50 | $10.00 | $10.00 |
| 57 | Lane arrow (644E01300) | EACH | 6 | $267.00 | $105.00 | $105.00 | $267.00 | $120.00 |
| 58 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $92.00 | $90.00 | $100.00 | $80.00 | $120.00 |
| 59 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $106.00 | $65.00 | $92.00 | $100.00 | $110.00 |
| 60 | Increased barrier delineation (614E11630) | FT | 1,400 | $2.00 | $1.00 | $0.50 | $1.40 | $1.50 |
| 61 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 12 | $2,300.00 | $1,680.00 | $2,300.00 | $2,500.00 | $2,700.00 |
| 62 | Barrier reflector, type 1, (BI-directional) (614E13310) | EACH | 22 | $36.00 | $15.00 | $9.50 | $36.00 | $40.00 |
| 63 | Object marker, two way (614E13360) | EACH | 22 | $42.00 | $25.00 | $15.00 | $42.00 | $50.00 |
| 64 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,500.00 | $1,500.00 | $1,500.00 | $2,500.00 | $1,700.00 |
| 65 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.60 | $3,050.00 | $3,050.00 | $3,050.00 | $11,400 | $3,500.00 |
| 66 | Work zone stop line, class I, 642 paint (614E26200) | FT | 30 | $14.00 | $14.00 | $14.00 | $10.00 | $15.00 |
| 67 | Roads for maintaining traffic (615E10000) | LS | 1 | $3,065.00 | $3,500.00 | $3,200.00 | $25,000 | $4,600.00 |
| 68 | Pavement for maintaining traffic, class B (615E25000) | SY | 12 | $415.00 | $420.00 | $275.00 | $500.00 | $210.00 |
| 69 | Water (616E10000) | MGAL | 2 | $1.00 | $1.00 | $110.00 | $10.00 | $0.60 |
| 70 | Portable barrier, unanchored (622E41100) | FT | 2,290 | $25.00 | $18.00 | $16.00 | $30.00 | $15.00 |
| 71 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,900.00 | $7,500.00 | $7,082.00 | $15,000 | $10,000 |
| 72 | Maintaining traffic (614E11000) | LS | 1 | $51,164 | $60,000 | $105,000 | $100,000 | $112,000 |
| 73 | Construction layout stakes and surveying (623E10000) | LS | 1 | $55,139 | $16,500 | $16,500 | $15,000 | $31,000 |
| 74 | Mobilization (624E10000) | LS | 1 | $71,056 | $60,000 | $50,000 | $50,000 | $31,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.