Kenmore Construction Co Inc: ODOT bid record
Kenmore Construction Co Inc submitted 50 bids on Ohio DOT contracts in the data, from 04 JUN 2020 to 12 NOV 2026, and was the low bidder on 19 of them (38%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $279,500,786
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 1 | 25% |
| 2021 | 11 | 3 | 27% |
| 2022 | 12 | 2 | 17% |
| 2023 | 7 | 4 | 57% |
| 2024 | 4 | 2 | 50% |
| 2025 | 5 | 3 | 60% |
| 2026 | 7 | 4 | 57% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SUM | 26 | 13 | 50% |
| CUY | 11 | 1 | 9% |
| POR | 4 | 0 | 0% |
| STA | 4 | 2 | 50% |
| MED | 1 | 0 | 0% |
| MAH | 1 | 1 | 100% |
| TRU | 1 | 1 | 100% |
| FRA | 1 | 0 | 0% |
| WAY | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 47 | 47 (100%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 76 | 35 (46%) | $43.50 | $34.00 |
| Removal of existing pavement marking | 512E74500 | FT | 34 | 33 (97%) | $4.00 | $3.00 |
| Special - composite fiber wrap system | 519E00100 | SF | 35 | 26 (74%) | $48.00 | $48.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 30 | 24 (80%) | $20.00 | $23.50 |
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 36 | 23 (64%) | $12.00 | $11.00 |
| Unclassified excavation | 503E21100 | CY | 32 | 20 (63%) | $42.50 | $85.00 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 29 | 20 (69%) | $15.00 | $20.00 |
| Soil analysis test | 659E00100 | EACH | 27 | 20 (74%) | $50.00 | $115.50 |
| Commercial fertilizer | 659E20000 | TON | 33 | 19 (58%) | $800.00 | $850.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 22 | 18 (82%) | $3.08 | $3.50 |
| Lane arrow | 646E20300 | EACH | 19 | 18 (95%) | $167.00 | $175.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 32 | 13 of 32 |
| Karvo Companies Inc | 25 | 9 of 25 |
| Shelly Company | 18 | 3 of 18 |
| Kokosing Construction Company Inc | 16 | 6 of 16 |
| Great Lakes Construction Co | 16 | 8 of 16 |
| Ruhlin Company | 14 | 8 of 14 |
| Barbicas Construction Company Inc | 11 | 6 of 11 |
| Chagrin Valley Paving Inc | 9 | 5 of 9 |
| J D Williamson Construction Co Inc | 8 | 6 of 8 |
| Eclipse Co LLC | 5 | 3 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260510 | SUM | SUM-SR 261-11.89 (FOUR LANE RESURFACING) | 1 of 7 | $1,380,867 | Low, 17% under the second |
| 13 AUG 2026 | 260332 | STA | STA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 1 of 4 | $7,158,607 | Low, 15% under the second |
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 5 of 9 | $2,335,877 | +25% |
| 25 JUN 2026 | 268014 | POR | POR-/SUM Culverts FY2026 (CULVERT REPLACEMENT) | 3 of 3 | $1,436,428 | +16% |
| 23 APR 2026 | 268009 | SUM | SUM-SR 261-00.00/VAR (TWO LANE RESURFACING) | 1 of 5 | $3,560,027 | Low, 6.0% under the second |
| 12 MAR 2026 | 260136 | STA | STA-SR 93/VAR-19.26/VAR (FOUR LANE RESURFACING) | 2 of 5 | $2,855,819 | +2.0% |
| 19 FEB 2026 | 260096 | SUM | SUM-IR 277-03.73 (BRIDGE REPAIR) | 1 of 4 | $15,444,559 | Low, 1.0% under the second |
| 18 DEC 2025 | 250610 | CUY | CUY-IR 77-15.46/VAR Decks (BRIDGE REPAIR) | 5 of 5 | $29,383,106 | +16% |
| 13 NOV 2025 | 250535 | STA | STA-US 30/VAR-13.15/VAR (PART 1 AND PART 2) (FOUR LANE RESURFACING) | 1 of 3 | $12,858,776 | Low, 2.0% under the second |
| 17 JUL 2025 | 250349 | SUM | SUM-SR 21-19.57/VAR (TWO LANE RESURFACING) | 1 of 8 | $811,775 | Low, 8.0% under the second |
| 15 MAY 2025 | 250262 | SUM | SUM-SR 241-01.50/VAR (TWO LANE RESURFACING) | 3 of 4 | $2,985,044 | +12% |
| 27 FEB 2025 | 250004 | SUM | SUM-IR 77-24.12 (MAJOR RECONSTRUCTION) | 1 of 3 | $52,430,282 | Low, 3.0% under the second |
| 05 DEC 2024 | 240561 | SUM | SUM-SR 8-02.91 (FOUR LANE RESURFACING) | 2 of 4 | $7,638,244 | +1.0% |
| 26 SEP 2024 | 240423 | SUM | SUM-IR 77-09.75 (NOISE WALLS) | 1 of 5 | $6,826,199 | Low, 5.0% under the second |
| 22 FEB 2024 | 240107 | SUM | SUM-Wooster Road West (MAJOR RECONSTRUCTION) | 1 of 5 | $8,891,694 | Low, 7.0% under the second |
| 11 JAN 2024 | 240026 | SUM | SUM-SR 18-01.01 (FOUR LANE RESURFACING) | 5 of 7 | $2,249,298 | +18% |
| 14 DEC 2023 | 230602 | POR | POR-Frost Rd Ph 2 (Streetsboro) (TWO LANE RESURFACING) | 8 of 8 | $838,177 | +69% |
| 14 SEP 2023 | 230438 | SUM | SUM-IR 271-01.51 (BRIDGE REPAIR) | 5 of 5 | $2,146,491 | +24% |
| 31 AUG 2023 | 230437 | SUM | SUM-IR 77-28.75 (MAJOR RECONSTRUCTION) | 1 of 5 | $54,637,274 | Low, 6.0% under the second |
| 08 JUN 2023 | 233005 | WAY | WAY-SR 21-00.00 (MAJOR RECONSTRUCTION) | 1 of 3 | $30,843,350 | Low, 24% under the second |
| 25 MAY 2023 | 230334 | SUM | SUM-IR 271/SR 8-08.49/VAR (FOUR LANE RESURFACING) | 1 of 2 | $9,878,459 | Low, 7.0% under the second |
| 20 APR 2023 | 230175 | SUM | SUM-SR 8-01.75 | 3 of 5 | $179,572,547 | +14% |
| 23 FEB 2023 | 230131 | SUM | SUM-Wooster Rd/State St (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 1 of 4 | $2,961,921 | Low, 5.0% under the second |
| 01 DEC 2022 | 220621 | SUM | SUM-IR 77-22.30 (BRIDGE REPLACEMENT (2 BRIDGES)) | 1 of 7 | $13,371,660 | Low, 11% under the second |
| 03 NOV 2022 | 220570 | CUY | CUY-Independence Blvd Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 5 | $1,061,765 | +17% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.