ODOT contract 250262 bid tabulation
SUM-SR 241-01.50/VAR (TWO LANE RESURFACING). Let by Ohio DOT on May 15, 2025, SUM. 4 bids received; low bid $2,665,800 by Karvo Companies Inc, -6.8% against the engineer's estimate of $2,860,000.
- Owner
- Ohio DOT
- Letting
- 15 MAY 2025
- Pay items
- 98
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Karvo Companies Inc | $2,665,800 | Low | -7.0% |
| 2 | Shelly & Sands Inc | $2,689,799 | +1.0% | -6.0% |
| 3 | Kenmore Construction Co Inc | $2,985,044 | +12% | +4.0% |
| 4 | Shelly Company | $3,321,379 | +25% | +16% |
Engineer's estimate: $2,860,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Karvo Companies Inc | 2. Shelly & Sands Inc | 3. Kenmore Construction Co Inc | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 540 | $0.75 | $6.00 | $17.00 | $20.00 |
| 2 | Walk removed (202E30000) | SF | 6,702 | $8.00 | $3.00 | $2.50 | $5.00 |
| 3 | Curb removed (202E32000) | FT | 32 | $35.00 | $13.50 | $10.00 | $24.50 |
| 4 | Curb and gutter removed (202E32500) | FT | 428 | $35.00 | $23.50 | $10.00 | $33.75 |
| 5 | Removal misc.: barrier reflector (202E98100) | EACH | 12 | $25.00 | $21.00 | $10.00 | $5.00 |
| 6 | Excavation (203E10000) | CY | 24 | $10.00 | $150.00 | $50.00 | $25.00 |
| 7 | Linear grading (209E60200) | STA | 163 | $65.00 | $55.00 | $110.00 | $70.00 |
| 8 | 4" concrete walk (608E10000) | SF | 3,528 | $8.00 | $10.25 | $10.00 | $21.50 |
| 9 | Curb ramp (608E52000) | SF | 3,189 | $14.00 | $26.00 | $20.00 | $23.50 |
| 10 | Curb ramp, as per plan (608E52001) | SF | 121 | $14.00 | $68.50 | $22.00 | $85.50 |
| 11 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 14 | $1,600.00 | $1,750.00 | $1,700.00 | $1,750.00 |
| 12 | Special - as-built construction plans (690E91000) | LS | 1 | $623.50 | $2,000.00 | $5,000.00 | $5,500.00 |
| 13 | Special - vertical clearance (690E98000) | EACH | 2 | $640.00 | $1,100.00 | $1,500.00 | $640.00 |
| 14 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 8 | $1,800.00 | $2,500.00 | $800.00 | $2,500.00 |
| 16 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 35 | $2,000.00 | $1,850.00 | $2,200.00 | $1,850.00 |
| 17 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $2,500.00 | $3,500.00 | $950.00 | $3,500.00 |
| 18 | Special - miscellaneous metal (611E99820) | LB | 2,000 | $3.00 | $5.00 | $3.00 | $5.00 |
| 19 | Partial depth pavement repair (441) (251E01000) | SY | 2,000 | $40.00 | $45.00 | $48.00 | $65.00 |
| 20 | Pavement repair (253E01000) | SY | 426 | $70.00 | $180.00 | $160.00 | $140.00 |
| 21 | Pavement planing, asphalt concrete (T=1.5") (254E01000) | SY | 118,689 | $1.79 | $1.45 | $2.55 | $2.10 |
| 22 | Pavement planing, asphalt concrete (T=3") (254E01000) | SY | 9,546 | $2.82 | $1.90 | $4.50 | $3.00 |
| 23 | Aggregate base (304E20000) | CY | 24 | $25.00 | $100.00 | $50.00 | $40.00 |
| 24 | Non-tracking tack coat (407E20000) | GAL | 12,165 | $2.70 | $3.05 | $4.50 | $3.00 |
| 25 | Prime coat, as per plan (408E10001) | GAL | 3,475 | $4.50 | $3.50 | $6.00 | $4.00 |
| 26 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 5,280 | $220.00 | $225.00 | $248.00 | $210.00 |
| 27 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 465 | $175.00 | $160.00 | $240.00 | $160.00 |
| 28 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 15 | $220.00 | $1,200.00 | $650.00 | $850.00 |
| 29 | Combination curb and gutter, type 2 (609E12000) | FT | 382 | $55.00 | $62.50 | $65.00 | $140.50 |
| 30 | Curb, type 6 (609E26000) | FT | 32 | $45.00 | $56.25 | $50.00 | $100.00 |
| 31 | Compacted aggregate, as per plan (617E10101) | CY | 243 | $75.00 | $150.00 | $72.00 | $75.00 |
| 32 | Valve box adjusted to grade (638E10800) | EACH | 1 | $100.00 | $320.00 | $550.00 | $2,500.00 |
| 33 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 10 | $2,000.00 | $2,000.00 | $1,900.00 | $2,000.00 |
| 34 | RPM (621E00100) | EACH | 324 | $39.00 | $47.50 | $50.00 | $47.50 |
| 35 | Raised pavement marker removed (621E54000) | EACH | 261 | $1.00 | $5.00 | $5.00 | $3.75 |
| 36 | Barrier reflector, type 1, 1WAY (626E00102) | EACH | 14 | $18.00 | $18.00 | $15.00 | $15.00 |
| 37 | Barrier reflector, type 2, 1WAY (626E00110) | EACH | 43 | $20.00 | $20.00 | $18.00 | $13.50 |
| 38 | Ground mounted support, no. 2 post (630E02100) | FT | 147 | $10.00 | $10.00 | $10.00 | $10.00 |
| 39 | Sign, flat sheet (630E80100) | SF | 43.50 | $23.00 | $23.00 | $23.00 | $23.00 |
| 40 | Sign, flat sheet (630E80100) | SF | 7 | $23.00 | $23.00 | $23.00 | $23.00 |
| 41 | Removal of ground mounted sign and disposal (630E84900) | EACH | 21 | $25.00 | $25.00 | $25.00 | $25.00 |
| 42 | Removal of ground mounted sign and storage (630E85000) | EACH | 2 | $25.00 | $25.00 | $25.00 | $25.00 |
| 43 | Removal of ground mounted post support and disposal (630E86002) | EACH | 14 | $25.00 | $25.00 | $25.00 | $25.00 |
| 44 | Edge line, 4" (646E10000) | MI | 6.10 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 45 | Edge line, 6" (646E10010) | MI | 1.62 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 46 | Lane line, 6" (646E10110) | MI | 0.93 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 47 | Center line (646E10200) | MI | 4.03 | $4,100.00 | $4,100.00 | $4,100.00 | $4,100.00 |
| 48 | Channelizing line, 8" (646E10300) | FT | 1,775 | $1.35 | $1.35 | $1.35 | $1.35 |
| 49 | Channelizing line, 12" (646E10310) | FT | 5,289 | $1.50 | $1.50 | $1.50 | $1.50 |
| 50 | Stop line (646E10400) | FT | 490 | $12.00 | $12.00 | $12.00 | $12.00 |
| 51 | Crosswalk line, 24" (646E10520) | FT | 544 | $12.00 | $12.00 | $12.00 | $12.00 |
| 52 | Crosswalk line, 24", as per plan (646E10521) | FT | 1,556 | $12.00 | $12.00 | $12.00 | $12.00 |
| 53 | Transverse/diagonal line (646E10600) | FT | 1,286 | $9.00 | $9.00 | $9.00 | $9.00 |
| 54 | Island marking (646E10800) | SF | 264 | $10.00 | $10.00 | $10.00 | $10.00 |
| 55 | School symbol marking, 72" (646E20100) | EACH | 2 | $350.00 | $350.00 | $350.00 | $350.00 |
| 56 | Lane arrow (646E20300) | EACH | 104 | $125.00 | $125.00 | $125.00 | $125.00 |
| 57 | Dotted line, 6" (646E20504) | FT | 1,325 | $1.00 | $1.00 | $1.00 | $1.00 |
| 58 | Yield line (646E20800) | FT | 90 | $15.00 | $15.00 | $15.00 | $15.00 |
| 59 | Conduit, 2", 725.04 (625E25400) | FT | 30 | $25.00 | $25.00 | $100.00 | $100.00 |
| 60 | Conduit, 3", 725.04 (625E25500) | FT | 57 | $38.50 | $38.50 | $125.00 | $125.00 |
| 61 | Trench (625E29000) | FT | 85 | $18.00 | $18.00 | $60.00 | $60.00 |
| 62 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,350.00 | $1,350.00 | $3,000.00 | $3,000.00 |
| 63 | Pull box removed, as per plan (625E31511) | EACH | 1 | $675.00 | $675.00 | $7,500.00 | $7,500.00 |
| 64 | Pull box, misc.: adjusted to grade (625E31600) | EACH | 2 | $450.00 | $450.00 | $2,500.00 | $2,500.00 |
| 65 | Ground rod (625E32000) | EACH | 2 | $300.00 | $300.00 | $300.00 | $300.00 |
| 66 | Underground warning marking tape (625E36010) | FT | 85 | $3.00 | $3.00 | $2.00 | $2.00 |
| 67 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $1,300.00 | $1,300.00 | $1,500.00 | $1,500.00 |
| 68 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 671 | $4.50 | $4.50 | $5.00 | $5.00 |
| 69 | Pedestal foundation (632E64020) | EACH | 2 | $1,750.00 | $1,750.00 | $2,500.00 | $2,500.00 |
| 70 | Pedestal, 8', transformer base (632E89900) | EACH | 2 | $850.00 | $850.00 | $2,000.00 | $2,000.00 |
| 71 | Reuse of pedestrian signal head (632E90202) | EACH | 1 | $750.00 | $750.00 | $1,500.00 | $1,500.00 |
| 72 | Reuse of pedestrian pushbutton, as per plan (632E90211) | EACH | 2 | $393.00 | $393.00 | $1,000.00 | $1,000.00 |
| 73 | Controller item, misc.: controller modification (633E99000) | EACH | 1 | $2,090.00 | $2,090.00 | $1,500.00 | $1,500.00 |
| 74 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $10,750 | $10,750 | $9,000.00 | $9,000.00 |
| 75 | Stop line radar detection, as per plan (809E69101) | EACH | 6 | $10,350 | $10,350 | $8,500.00 | $8,500.00 |
| 77 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $10,500 | $10,500 | $8,800.00 | $8,500.00 |
| 78 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $95.00 | $100.00 | $100.00 |
| 79 | Work zone marking sign (614E12460) | EACH | 6 | $75.00 | $75.00 | $75.00 | $75.00 |
| 80 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $250.00 | $400.00 | $300.00 | $325.00 |
| 81 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $900.00 | $900.00 | $1,100.00 | $900.00 |
| 82 | Work zone lane line, class I, 6" (614E20010) | MI | 1.27 | $400.00 | $400.00 | $400.00 | $400.00 |
| 83 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.27 | $400.00 | $400.00 | $400.00 | $400.00 |
| 84 | Work zone center line, class I (614E21000) | MI | 4.18 | $900.00 | $900.00 | $900.00 | $900.00 |
| 85 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.18 | $900.00 | $900.00 | $900.00 | $900.00 |
| 86 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 3.40 | $525.00 | $525.00 | $525.00 | $525.00 |
| 88 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 5,289 | $0.50 | $0.50 | $0.50 | $0.50 |
| 89 | Work zone stop line, class I (614E26000) | FT | 557 | $3.25 | $3.25 | $3.25 | $3.25 |
| 90 | Work zone stop line, class III, 642 paint (614E26610) | FT | 467 | $3.25 | $3.25 | $3.25 | $3.25 |
| 91 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,500.00 | $5,000.00 | $15,000 | $10,000 |
| 92 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,726 | $5,500.00 | $25,000 | $35,000 |
| 93 | Maintaining traffic (614E11000) | LS | 1 | $175,000 | $137,982 | $115,000 | $615,000 |
| 94 | Field office, type B (619E16010) | MNTH | 6 | $2,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 95 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,500.00 | $4,400.00 | $5,000.00 | $20,000 |
| 96 | Mobilization (624E10000) | LS | 1 | $134,000 | $100,000 | $100,000 | $100,000 |
| 100 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 4.32 | $525.00 | $525.00 | $525.00 | $525.00 |
| 101 | Work zone channelizing line, class I, 8" (614E23000) | FT | 1,775 | $0.35 | $0.35 | $0.35 | $0.35 |
| 102 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,775 | $0.35 | $0.35 | $0.35 | $0.35 |
| 103 | Work zone channelizing line, class I, 12" (614E23010) | FT | 5,289 | $0.50 | $0.50 | $0.50 | $0.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 15, 2025. Compiled by Mirage Metrics.