ODOT contract 250004 bid tabulation
SUM-IR 77-24.12 (MAJOR RECONSTRUCTION). Let by Ohio DOT on February 27, 2025, SUM. 3 bids received; low bid $52,430,282 by Kenmore Construction Co Inc, -20% against the engineer's estimate of $65,718,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 461
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kenmore Construction Co Inc | $52,430,282 | Low | -20% |
| 2 | Shelly & Sands Inc | $54,001,247 | +3.0% | -18% |
| 3 | Shelly Company | $56,982,551 | +9.0% | -13% |
Engineer's estimate: $65,718,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kenmore Construction Co Inc | 2. Shelly & Sands Inc | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $500,000 | $493,000 | $350,000 |
| 2 | Headwall removed (202E20010) | EACH | 55 | $350.00 | $420.00 | $575.00 |
| 3 | Pavement removed (202E23000) | SY | 104,714 | $9.00 | $1.50 | $15.00 |
| 4 | Pavement removed (202E23000) | SY | 150,783 | $13.00 | $7.00 | $12.50 |
| 5 | Concrete median removed (202E30600) | SY | 38 | $50.00 | $40.00 | $100.00 |
| 6 | Concrete barrier removed (202E30700) | FT | 1,761 | $20.00 | $31.00 | $60.00 |
| 7 | Traffic island removed (202E30800) | SY | 114 | $20.00 | $13.00 | $60.00 |
| 8 | Curb removed (202E32000) | FT | 3,116 | $3.00 | $5.00 | $14.00 |
| 9 | Pipe removed, 24" and under (202E35100) | FT | 6,253 | $15.00 | $28.00 | $45.00 |
| 10 | Pipe removed, over 24" diameter (202E35200) | FT | 2,817 | $30.00 | $35.00 | $65.00 |
| 11 | Guardrail removed (202E38000) | FT | 16,302 | $2.00 | $3.00 | $3.00 |
| 12 | Manhole removed (202E58000) | EACH | 8 | $500.00 | $850.00 | $2,000.00 |
| 13 | Catch basin removed (202E58100) | EACH | 63 | $250.00 | $615.00 | $1,000.00 |
| 14 | Manhole abandoned (202E58700) | EACH | 1 | $800.00 | $3,470.00 | $3,500.00 |
| 15 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 394 | $40.00 | $15.00 | $45.00 |
| 16 | Fence removed (202E75000) | FT | 50,644 | $1.75 | $1.80 | $1.75 |
| 17 | Gate removed (202E75250) | EACH | 2 | $200.00 | $210.00 | $200.00 |
| 18 | Excavation (203E10000) | CY | 112,712 | $12.00 | $16.00 | $25.00 |
| 19 | Embankment (203E20000) | CY | 37,934 | $9.00 | $14.00 | $15.00 |
| 20 | Subgrade compaction (204E10000) | SY | 7,575 | $2.00 | $4.40 | $1.25 |
| 21 | Excavation of subgrade (204E13000) | CY | 67 | $50.00 | $35.00 | $35.00 |
| 22 | Granular material, type B (204E30010) | CY | 67 | $80.00 | $85.00 | $60.00 |
| 23 | Proof rolling (204E45000) | HR | 167 | $100.00 | $430.00 | $160.00 |
| 24 | Geotextile fabric (204E50000) | SY | 200 | $5.00 | $0.40 | $4.00 |
| 25 | Cement (206E10500) | TON | 9,436 | $179.00 | $200.00 | $186.45 |
| 26 | Curing coat (206E11000) | SY | 312,420 | $1.00 | $1.00 | $1.05 |
| 27 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 312,420 | $3.45 | $3.00 | $2.90 |
| 28 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $94,434 | $50,000 | $50,000 |
| 29 | Linear grading, as per plan (209E60201) | STA | 191 | $225.00 | $92.00 | $235.00 |
| 30 | Guardrail, type MGS (606E15050) | FT | 14,435 | $21.60 | $23.00 | $20.50 |
| 31 | Guardrail, type MGS with long posts (606E15100) | FT | 2,025 | $23.80 | $25.00 | $23.50 |
| 32 | Guardrail, type MGS half post spacing (606E15150) | FT | 450 | $29.20 | $31.00 | $29.50 |
| 33 | Anchor assembly, MGS type B (606E26050) | EACH | 11 | $2,550.00 | $2,700.00 | $2,450.00 |
| 34 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 22 | $2,840.00 | $3,000.00 | $2,700.00 |
| 35 | Anchor assembly, MGS type T (606E26550) | EACH | 23 | $1,420.00 | $1,500.00 | $1,200.00 |
| 36 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 14 | $2,675.00 | $2,800.00 | $2,650.00 |
| 37 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 12 | $625.00 | $700.00 | $675.00 |
| 38 | Special - cable barrier with concrete line post foundation (606E55010) | FT | 19,166 | $22.80 | $46.00 | $28.00 |
| 39 | Special - cable barrier, anchor assembly (606E55150) | EACH | 22 | $4,350.00 | $4,500.00 | $4,300.00 |
| 40 | Fence, type 47 (607E15000) | FT | 44,692 | $13.40 | $14.00 | $13.40 |
| 41 | Fence, type 47RA (607E15100) | FT | 2,147 | $12.10 | $13.00 | $12.10 |
| 42 | Fence, type CLT (607E23000) | FT | 3,797 | $37.00 | $39.00 | $37.00 |
| 43 | Gate, type 47 (607E40500) | EACH | 1 | $2,000.00 | $2,100.00 | $2,000.00 |
| 44 | Gate, type 47, as per plan (607E40501) | EACH | 1 | $2,500.00 | $2,670.00 | $2,500.00 |
| 45 | Fenceline seeding and mulching (607E70000) | FT | 50,636 | $0.60 | $0.70 | $1.00 |
| 46 | Concrete barrier, single slope, type B1 (622E10100) | FT | 26 | $220.00 | $290.00 | $179.00 |
| 47 | Concrete barrier, single slope, type C1 (622E10140) | FT | 215 | $184.00 | $198.00 | $185.00 |
| 48 | Concrete barrier, single slope, type D (622E10160) | FT | 796 | $119.00 | $210.00 | $133.00 |
| 49 | Barrier transition (622E10200) | EACH | 1 | $8,500.00 | $8,000.00 | $7,500.00 |
| 50 | Concrete barrier end section, type B (622E24840) | EACH | 2 | $8,700.00 | $7,600.00 | $11,000 |
| 51 | Concrete barrier end section, type B1 (622E24850) | EACH | 1 | $9,000.00 | $7,900.00 | $11,500 |
| 52 | Concrete barrier end section, type D (622E25000) | EACH | 16 | $4,700.00 | $5,700.00 | $3,400.00 |
| 53 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 2 | $6,500.00 | $6,300.00 | $4,250.00 |
| 54 | Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007) | EACH | 1 | $6,500.00 | $5,800.00 | $3,500.00 |
| 55 | Concrete barrier, end anchorage, reinforced, type C1 (622E25014) | EACH | 2 | $10,800 | $5,400.00 | $4,250.00 |
| 56 | Concrete barrier, end anchorage, reinforced, type C1, as per plan (622E25015) | EACH | 1 | $23,000 | $14,000 | $27,000 |
| 57 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 12 | $4,800.00 | $5,600.00 | $3,250.00 |
| 58 | Barrier, misc.:concrete barrier, type B (622E90000) | FT | 845 | $157.00 | $127.00 | $136.50 |
| 59 | Reference monument, type A (623E40500) | EACH | 5 | $300.00 | $960.00 | $550.00 |
| 60 | Special - vertical clearance (690E98000) | EACH | 6 | $800.00 | $460.00 | $800.00 |
| 61 | Special - as-built construction record drawings (690E98400) | LS | 1 | $10,000 | $15,000 | $30,000 |
| 62 | Special - survey control verification (690E98400) | LS | 1 | $3,500.00 | $14,000 | $15,000 |
| 63 | Riprap (601E10000) | SY | 37 | $160.00 | $730.00 | $400.00 |
| 64 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 119 | $115.00 | $175.00 | $345.00 |
| 65 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 262 | $125.00 | $72.00 | $40.00 |
| 66 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 508 | $168.00 | $145.00 | $300.00 |
| 67 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 257 | $174.00 | $156.00 | $350.00 |
| 68 | Rock channel protection, type C with aggregate filter (601E32210) | CY | 14 | $260.00 | $348.00 | $550.00 |
| 69 | Paved gutter, type 1-2, as per plan (601E37501) | FT | 180 | $95.00 | $122.00 | $85.00 |
| 70 | Soil analysis test (659E00100) | EACH | 3 | $25.00 | $26.00 | $300.00 |
| 71 | Topsoil (659E00300) | CY | 34,317 | $6.00 | $13.00 | $12.00 |
| 72 | Seeding and mulching (659E10000) | SY | 250,291 | $0.60 | $0.65 | $0.65 |
| 73 | Repair seeding and mulching (659E14000) | SY | 12,515 | $0.70 | $0.65 | $0.60 |
| 74 | Inter-seeding (659E15000) | SY | 12,515 | $0.01 | $0.10 | $0.10 |
| 75 | Commercial fertilizer (659E20000) | TON | 34.92 | $250.00 | $265.00 | $1,250.00 |
| 76 | Lime (659E31000) | ACRE | 51.72 | $25.00 | $26.00 | $0.10 |
| 77 | Water (659E35000) | MGAL | 1,386 | $10.00 | $0.10 | $0.10 |
| 78 | Mowing (659E40000) | MSF | 564 | $1.00 | $1.00 | $5.00 |
| 79 | Slope erosion protection (670E00500) | SY | 58,803 | $1.00 | $1.00 | $1.60 |
| 80 | Ditch erosion protection (670E00700) | SY | 17,098 | $1.09 | $1.00 | $2.50 |
| 81 | Storm water pollution prevention plan (832E15000) | LS | 1 | $8,375.00 | $9,000.00 | $8,500.00 |
| 82 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $36,420 | $38,000 | $35,000 |
| 83 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $21,500 | $23,000 | $25,000 |
| 84 | Erosion control (832E30000) | EACH | 1,650,000 | $1.00 | $1.00 | $1.00 |
| 85 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 182 | $5.00 | $5.00 | $12.00 |
| 86 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 18 | $6.00 | $6.00 | $20.00 |
| 87 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $4,000.00 | $20,000 | $50,000 |
| 88 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $5,500.00 | $24,000 | $50,000 |
| 89 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $5,500.00 | $22,000 | $50,000 |
| 90 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $5,500.00 | $24,000 | $50,000 |
| 91 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $5,500.00 | $22,000 | $50,000 |
| 92 | Concrete masonry (602E20000) | CY | 22.60 | $1,700.00 | $3,200.00 | $4,225.00 |
| 93 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 90,351 | $14.00 | $11.00 | $10.20 |
| 94 | 6" shallow pipe underdrains with geotextile fabric, as per plan (605E11111) | FT | 940 | $17.00 | $16.00 | $15.00 |
| 95 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 1,505 | $12.00 | $14.00 | $17.00 |
| 96 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 68,621 | $12.00 | $11.00 | $10.00 |
| 97 | 6" base pipe underdrains with geotextile fabric, as per plan (605E14021) | FT | 604 | $15.00 | $13.00 | $14.50 |
| 98 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 3,262 | $18.00 | $26.00 | $24.00 |
| 99 | 6" conduit, type B (611E00900) | FT | 3,277 | $35.00 | $26.00 | $28.00 |
| 100 | 6" conduit, type C (611E01100) | FT | 200 | $30.00 | $23.00 | $20.00 |
| 101 | 6" conduit, type E (611E01400) | FT | 200 | $16.00 | $23.00 | $20.00 |
| 102 | 6" conduit, type F (611E01500) | FT | 240 | $16.00 | $23.00 | $20.00 |
| 103 | 15" conduit, type B (611E05900) | FT | 1,719 | $95.00 | $119.00 | $160.00 |
| 104 | 15" conduit, type B (611E05900) | FT | 158 | $115.00 | $130.00 | $175.00 |
| 105 | 15" conduit, type C (611E06100) | FT | 160 | $78.00 | $94.00 | $165.00 |
| 106 | 15" conduit, type F (611E06700) | FT | 412 | $114.00 | $95.00 | $175.00 |
| 107 | 18" conduit, type A (611E07200) | FT | 41 | $590.00 | $174.00 | $225.00 |
| 108 | 18" conduit, type A (611E07200) | FT | 12 | $1,450.00 | $470.00 | $600.00 |
| 109 | 18" conduit, type B (611E07400) | FT | 1,027 | $98.00 | $150.00 | $150.00 |
| 110 | 18" conduit, type C (611E07600) | FT | 2,141 | $93.00 | $88.00 | $95.00 |
| 111 | 18" conduit, type C (611E07600) | FT | 6 | $300.00 | $590.00 | $420.00 |
| 112 | 18" conduit, type F (611E08200) | FT | 109 | $116.00 | $108.00 | $130.00 |
| 113 | 21" conduit, type B (611E08900) | FT | 196 | $169.00 | $145.00 | $200.00 |
| 114 | 24" conduit, type A (611E10200) | FT | 38 | $890.00 | $415.00 | $1,000.00 |
| 115 | 24" conduit, type B (611E10400) | FT | 310 | $127.00 | $165.00 | $190.00 |
| 116 | 24" conduit, type B (611E10400) | FT | 14 | $400.00 | $750.00 | $350.00 |
| 117 | 24" conduit, type C (611E10600) | FT | 546 | $107.00 | $104.01 | $135.00 |
| 118 | 27" conduit, type B (611E11900) | FT | 90 | $155.00 | $146.00 | $225.00 |
| 119 | 27" conduit, type C (611E12100) | FT | 900 | $123.00 | $117.00 | $150.00 |
| 120 | 30" conduit, type A, 706.02 (611E13200) | FT | 43 | $1,000.00 | $472.00 | $830.00 |
| 121 | 30" conduit, type B (611E13400) | FT | 103 | $187.00 | $203.00 | $210.00 |
| 122 | 30" conduit, type C (611E13600) | FT | 1,674 | $123.00 | $124.00 | $155.00 |
| 123 | 30" conduit, type C (611E13600) | FT | 96 | $188.00 | $208.00 | $200.00 |
| 124 | 36" conduit, type A (611E16200) | FT | 53 | $920.00 | $162.00 | $470.00 |
| 125 | 36" conduit, type A (611E16200) | FT | 33 | $850.00 | $469.00 | $645.00 |
| 126 | 42" conduit, type A (611E19200) | FT | 40 | $850.00 | $200.00 | $590.00 |
| 127 | 42" conduit, type A, 706.02 (611E19200) | FT | 46 | $1,100.00 | $480.00 | $890.00 |
| 128 | 48" conduit, type A, 706.02 (611E20700) | FT | 25 | $600.00 | $520.00 | $445.00 |
| 129 | 54" conduit, type A (611E22200) | FT | 21 | $1,142.00 | $280.00 | $630.00 |
| 130 | 22" X 34" conduit, type C, 706.04 (611E52404) | FT | 262 | $310.00 | $295.00 | $370.00 |
| 131 | 29" X 45" conduit, type A, 706.04 (611E52700) | FT | 16 | $1,600.00 | $940.00 | $835.00 |
| 132 | 29" X 45" conduit, type C, 706.04 (611E52704) | FT | 133 | $434.00 | $475.00 | $505.00 |
| 133 | Catch basin, no. 3 (611E98150) | EACH | 4 | $4,100.00 | $4,700.00 | $5,100.00 |
| 134 | Catch basin, no. 3A (611E98180) | EACH | 5 | $3,800.00 | $3,900.00 | $3,500.00 |
| 135 | Catch basin, no. 4 (611E98230) | EACH | 27 | $4,300.00 | $5,400.00 | $5,000.00 |
| 136 | Catch basin, no. 6 (611E98370) | EACH | 1 | $3,700.00 | $3,300.00 | $5,000.00 |
| 137 | Catch basin, no. 8 (611E98410) | EACH | 12 | $4,000.00 | $5,600.00 | $5,000.00 |
| 138 | Catch basin, no. 8A (611E98434) | EACH | 4 | $4,600.00 | $6,600.00 | $11,000 |
| 139 | Catch basin, no. 8A, as per plan (611E98435) | EACH | 1 | $4,900.00 | $5,900.00 | $8,000.00 |
| 140 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $3,000.00 | $2,800.00 | $4,000.00 |
| 141 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $2,600.00 | $2,900.00 | $4,200.00 |
| 142 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $3,900.00 | $3,800.00 | $4,500.00 |
| 143 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $550.00 | $1,400.00 | $2,000.00 |
| 144 | Catch basin reconstructed to grade (611E98634) | EACH | 2 | $2,600.00 | $1,400.00 | $2,500.00 |
| 145 | Inlet, no. 3 for single slope barrier, type B1 (611E99100) | EACH | 1 | $11,700 | $13,000 | $15,000 |
| 146 | Inlet, no. 3 for single slope barrier, type C1 (611E99110) | EACH | 1 | $12,800 | $11,000 | $15,000 |
| 147 | Inlet, no. 3 for single slope barrier, type D (611E99114) | EACH | 1 | $11,600 | $12,000 | $15,000 |
| 148 | Manhole, no. 3 (611E99574) | EACH | 16 | $4,500.00 | $7,300.00 | $12,500 |
| 149 | Manhole, no. 3, as per plan (611E99575) | EACH | 1 | $9,000.00 | $6,600.00 | $5,500.00 |
| 150 | Precast reinforced concrete outlet (611E99710) | EACH | 63 | $300.00 | $350.00 | $400.00 |
| 151 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $2.50 | $2.00 | $6.50 |
| 152 | Cured-in-place pipe liner 18" CMP (899E10000) | FT | 292 | $175.00 | $170.00 | $160.00 |
| 153 | Conduit renewal using spray applied structural liner, round conduit (833E10000) | FT | 315 | $340.00 | $328.00 | |
| 154 | Cured-in-place pipe liner 42"CMP (899E10000) | FT | 315 | $450.00 | ||
| 155 | Conduit renewal using spray applied structural liner, round conduit (833E10000) | FT | 513 | $300.00 | $285.00 | |
| 156 | Cured-in-place pipe liner 36" CMP (899E10000) | FT | 513 | $335.00 | ||
| 157 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 4,048 | $5.00 | $4.00 | $5.00 |
| 158 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 51,302 | $148.00 | $130.00 | $135.00 |
| 159 | Aggregate base (304E20000) | CY | 52,130 | $65.00 | $75.00 | $67.50 |
| 160 | 9" concrete base, class QC 1P (305E13010) | SY | 1,995 | $120.00 | $83.00 | $92.00 |
| 161 | Tack coat, 702.13 (407E13900) | GAL | 514 | $6.00 | $3.50 | $10.00 |
| 162 | Non-tracking tack coat (407E20000) | GAL | 31,180 | $6.00 | $3.20 | $3.00 |
| 163 | Prime coat, as per plan (408E10001) | GAL | 6,637 | $4.00 | $3.50 | $5.00 |
| 164 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 251 | $270.00 | $218.00 | $280.00 |
| 165 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 59 | $400.00 | $300.00 | $450.00 |
| 166 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 1 | $800.00 | $3,000.00 | $800.00 |
| 167 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 2 | $800.00 | $1,500.00 | $625.00 |
| 168 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 602 | $300.00 | $290.00 | $375.00 |
| 169 | Anti-segregation equipment (442E00100) | CY | 16,373 | $25.00 | $8.00 | $6.50 |
| 170 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 13,653 | $220.00 | $165.00 | $185.00 |
| 171 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 11,686 | $240.00 | $228.00 | $210.00 |
| 172 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 46 | $175.00 | $117.00 | $115.00 |
| 173 | 10" non-reinforced concrete pavement, class QC 1P with QC/QA (452E14020) | SY | 19,514 | $120.00 | $98.00 | $88.00 |
| 174 | Curb, type 4-C (609E24510) | FT | 480 | $16.00 | $44.00 | $30.00 |
| 175 | Curb, type 6 (609E26000) | FT | 657 | $40.00 | $33.00 | $24.00 |
| 176 | 4" concrete median (609E70000) | SY | 166 | $80.00 | $81.00 | $80.00 |
| 177 | Compacted aggregate, as per plan (617E10101) | CY | 1,054 | $35.00 | $90.00 | $100.00 |
| 178 | Shoulder preparation (617E20000) | SY | 18,901 | $4.50 | $0.50 | $2.00 |
| 179 | Water (617E25000) | MGAL | 56 | $10.00 | $100.00 | $10.00 |
| 180 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 19 | $750.00 | $788.00 | $750.00 |
| 181 | Connection, fused pull apart (625E00450) | EACH | 6 | $120.00 | $128.00 | $120.00 |
| 182 | Connection, unfused permanent (625E00480) | EACH | 33 | $120.00 | $128.00 | $120.00 |
| 183 | Light pole, conventional, design AT12B40 (625E10490) | EACH | 3 | $3,000.00 | $3,200.00 | $3,000.00 |
| 184 | Light tower, BBB100 (625E12200) | EACH | 14 | $24,500 | $26,000 | $24,500 |
| 185 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 3 | $1,500.00 | $1,600.00 | $1,500.00 |
| 186 | Light tower foundation, 36" X 20' deep (625E15100) | EACH | 2 | $8,500.00 | $9,000.00 | $8,500.00 |
| 187 | Light tower foundation, 36" X 25' deep (625E15200) | EACH | 11 | $9,500.00 | $10,150 | $9,500.00 |
| 188 | Light tower foundation, misc.: 36" X 37.5' deep (625E15700) | EACH | 1 | $12,000 | $12,800 | $12,000 |
| 189 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,404 | $2.75 | $3.00 | $2.75 |
| 190 | No. 2 AWG 2400 volt distribution cable (625E23300) | FT | 429 | $3.50 | $3.50 | $3.50 |
| 191 | No. 10 AWG pole and bracket cable (625E23400) | FT | 468 | $1.50 | $1.60 | $1.50 |
| 192 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 6,911 | $8.50 | $9.00 | $8.50 |
| 193 | 1-1/2" duct cable with three no. 2 AWG 2400 volt cables (625E24330) | FT | 440 | $11.00 | $12.00 | $11.00 |
| 194 | Conduit, 3", 725.04 (625E25500) | FT | 138 | $35.00 | $37.00 | $35.00 |
| 195 | Conduit, jacked or drilled, 725.04: 3" (625E25902) | FT | 389 | $55.00 | $58.00 | $55.00 |
| 196 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 3 | $450.00 | $480.00 | $450.00 |
| 197 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 42 | $1,400.00 | $1,500.00 | $1,400.00 |
| 198 | Trench, 24" deep (625E29002) | FT | 7,172 | $7.00 | $7.50 | $7.00 |
| 199 | Pull box, 725.08, 18" (625E30700) | EACH | 10 | $1,200.00 | $1,200.00 | $1,200.00 |
| 200 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,500.00 | $1,600.00 | $1,500.00 |
| 201 | Pull box removed (625E31510) | EACH | 15 | $200.00 | $210.00 | $200.00 |
| 202 | Ground rod (625E32000) | EACH | 28 | $250.00 | $260.00 | $250.00 |
| 203 | Power service, as per plan (625E34001) | EACH | 1 | $10,000 | $10,000 | $10,000 |
| 204 | Underground warning marking tape (625E36010) | FT | 7,172 | $1.40 | $1.50 | $1.40 |
| 205 | Special - maintain existing lighting (625E40000) | LS | 1 | $15,000 | $16,000 | $15,000 |
| 206 | Special - replacement of existing lighting unit (625E40010) | EACH | 1 | $500.00 | $530.00 | $500.00 |
| 207 | Light pole removed (625E75400) | EACH | 31 | $300.00 | $320.00 | $300.00 |
| 208 | Light pole foundation removed (625E75500) | EACH | 31 | $200.00 | $210.00 | $200.00 |
| 209 | Power service removed (625E75510) | EACH | 1 | $500.00 | $530.00 | $500.00 |
| 210 | Distribution cable removed, as per plan (625E75551) | FT | 1,500 | $1.00 | $1.00 | $1.00 |
| 211 | Arc flash calculations and label: control center " (625E76000) | EACH | 1 | $500.00 | $530.00 | $500.00 |
| 212 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 59 | $70.00 | $106.00 | $75.00 |
| 213 | RPM (621E00100) | EACH | 1,058 | $38.50 | $42.00 | $39.60 |
| 214 | Raised pavement marker removed (621E54000) | EACH | 574 | $5.00 | $8.00 | $5.50 |
| 215 | Ground rod (625E32000) | EACH | 14 | $320.00 | $340.00 | $320.00 |
| 216 | Barrier reflector, type 1, BI-directional (626E00102) | EACH | 51 | $11.40 | $12.00 | $11.00 |
| 217 | Barrier reflector, type 1, one-way (626E00102) | EACH | 38 | $12.60 | $13.00 | $11.00 |
| 218 | Barrier reflector, type 3, BI-directional (626E00112) | EACH | 280 | $14.00 | $14.00 | $11.00 |
| 219 | Barrier reflector, type 3, one-way (626E00112) | EACH | 175 | $14.00 | $14.00 | $11.00 |
| 220 | Barrier reflector, type 6 (626E00118) | EACH | 200 | $15.00 | $15.00 | $11.00 |
| 221 | Ground mounted support, no. 2 post (630E02100) | FT | 642.50 | $16.00 | $17.00 | $16.00 |
| 222 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 1,685.70 | $15.00 | $16.00 | $15.00 |
| 223 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 63.70 | $32.00 | $34.00 | $32.00 |
| 224 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 291.80 | $35.00 | $37.00 | $35.00 |
| 225 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 135.40 | $38.00 | $40.00 | $38.00 |
| 226 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 402.20 | $44.00 | $47.00 | $44.00 |
| 227 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 58.40 | $85.00 | $90.00 | $85.00 |
| 228 | One way support, no. 3 post (630E08004) | FT | 30.20 | $20.00 | $21.00 | $20.00 |
| 229 | Sign post reflector (630E08600) | EACH | 26 | $45.00 | $48.00 | $45.00 |
| 230 | Breakaway structural beam connection (630E09000) | EACH | 48 | $620.00 | $660.00 | $620.00 |
| 231 | Overhead sign support, type TC-12.31, design 6 (630E72320) | EACH | 1 | $25,300 | $27,000 | $25,300 |
| 232 | Overhead sign support, type TC-12.31, design 10 (630E72330) | EACH | 2 | $37,550 | $40,000 | $37,550 |
| 233 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 5 | $43,950 | $46,000 | $43,950 |
| 234 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 2 | $66,300 | $70,000 | $66,300 |
| 235 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $91,500 | $97,000 | $91,500 |
| 236 | Sign hanger assembly, span wire (630E79000) | EACH | 1 | $460.00 | $490.00 | $460.00 |
| 237 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 1 | $620.00 | $660.00 | $620.00 |
| 238 | Sign support assembly, pole mounted (630E79500) | EACH | 17 | $185.00 | $200.00 | $185.00 |
| 239 | Sign support assembly, barrier mounted, as per plan (630E79611) | EACH | 5 | $925.00 | $990.00 | $925.00 |
| 240 | Sign, flat sheet (630E80100) | SF | 1,403.50 | $16.00 | $17.00 | $16.00 |
| 241 | Sign, flat sheet, as per plan (630E80101) | SF | 32 | $18.00 | $19.00 | $18.00 |
| 242 | Sign, ground mounted extrusheet (630E80200) | SF | 1,378 | $23.00 | $25.00 | $23.00 |
| 243 | Sign, overhead extrusheet (630E80224) | SF | 1,804 | $23.00 | $25.00 | $23.00 |
| 244 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 1 | $10,650 | $15,000 | $14,900 |
| 245 | Ground mounted structural beam support foundation (630E84500) | EACH | 48 | $885.00 | $950.00 | $885.00 |
| 246 | Rigid overhead sign support foundation (630E84510) | EACH | 13 | $8,450.00 | $9,000.00 | $8,450.00 |
| 247 | Removal of ground mounted sign and disposal (630E84900) | EACH | 190 | $15.00 | $16.00 | $15.00 |
| 248 | Removal of ground mounted sign and storage, as per plan (630E85001) | EACH | 1 | $275.00 | $290.00 | $275.00 |
| 249 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 44 | $185.00 | $197.00 | $185.00 |
| 250 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 2 | $625.00 | $668.00 | $625.00 |
| 251 | Removal of ground mounted post support and disposal (630E86002) | EACH | 153 | $20.00 | $21.00 | $20.00 |
| 252 | Removal of ground mounted structural beam support (630E86102) | EACH | 60 | $335.00 | $357.00 | $335.00 |
| 253 | Removal of ground mounted wooden box beam support (630E86292) | EACH | 2 | $340.00 | $360.00 | $340.00 |
| 254 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 17 | $245.00 | $260.00 | $245.00 |
| 255 | Removal of overhead mounted sign and disposal, as per plan (630E87401) | EACH | 2 | $275.00 | $294.00 | $275.00 |
| 256 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $40.00 | $43.00 | $40.00 |
| 257 | Removal of overhead sign support and disposal, as per plan (630E89703) | EACH | 1 | $1,875.00 | $2,000.00 | $1,875.00 |
| 258 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 3 | $1,950.00 | $2,000.00 | $1,950.00 |
| 259 | Removal of overhead sign support and disposal, type TC-7.65 (630E89802) | EACH | 4 | $2,850.00 | $3,000.00 | $2,850.00 |
| 260 | Removal of miscellaneous traffic control item , BA (630E89902) | EACH | 5 | $55.00 | $58.00 | $55.00 |
| 261 | Removal of miscellaneous traffic control item, bea (630E89902) | EACH | 4 | $320.00 | $340.00 | $320.00 |
| 262 | Signing, misc.: reboundable delineator post assemb (630E97700) | EACH | 31 | $295.00 | $315.00 | $295.00 |
| 263 | Edge line, 4" (644E00100) | MI | 0.60 | $6,125.00 | $6,500.00 | $6,125.00 |
| 264 | Lane line, 4" (644E00200) | MI | 0.34 | $1,595.00 | $1,700.00 | $1,595.00 |
| 265 | Center line (644E00300) | MI | 0.43 | $10,525 | $11,200 | $10,525 |
| 266 | Channelizing line, 8" (644E00400) | FT | 2,003 | $1.60 | $1.70 | $1.60 |
| 267 | Stop line (644E00500) | FT | 108 | $6.95 | $7.40 | $6.95 |
| 268 | Transverse/diagonal line (644E00700) | FT | 250 | $6.60 | $7.00 | $6.60 |
| 269 | Island marking (644E00900) | SF | 134 | $6.40 | $7.00 | $6.40 |
| 270 | Lane arrow (644E01300) | EACH | 21 | $150.00 | $160.00 | $150.00 |
| 271 | Dotted line, 4" (644E01500) | FT | 149 | $1.55 | $1.70 | $1.55 |
| 272 | Removal of pavement marking (644E30000) | FT | 411 | $2.75 | $0.90 | $0.85 |
| 273 | Removal of pavement marking (644E30030) | MI | 1.82 | $2,575.00 | $3,500.00 | $3,335.00 |
| 274 | Edge line, 4" (646E10000) | MI | 0.69 | $3,065.00 | $3,200.00 | $3,065.00 |
| 275 | Edge line, 6" (646E10010) | MI | 4.80 | $4,670.00 | $4,900.00 | $4,670.00 |
| 276 | Lane line, 4" (646E10100) | MI | 0.06 | $1,150.00 | $1,200.00 | $1,150.00 |
| 277 | Lane line, 6" (646E10110) | MI | 4.80 | $1,495.00 | $1,600.00 | $1,495.00 |
| 278 | Center line (646E10200) | MI | 0.35 | $6,310.00 | $6,700.00 | $6,310.00 |
| 279 | Channelizing line, 8" (646E10300) | FT | 469 | $1.60 | $1.70 | $1.60 |
| 280 | Channelizing line, 12" (646E10310) | FT | 320 | $2.30 | $2.50 | $2.30 |
| 281 | Stop line (646E10400) | FT | 68 | $14.00 | $15.00 | $14.00 |
| 282 | Lane arrow (646E20300) | EACH | 23 | $195.00 | $208.00 | $195.00 |
| 283 | Wrong way arrow (646E20320) | EACH | 4 | $375.00 | $400.00 | $375.00 |
| 284 | Lane reduction arrow (646E20350) | EACH | 1 | $350.00 | $375.00 | $350.00 |
| 285 | Dotted line, 4" (646E20502) | FT | 348 | $1.30 | $1.40 | $1.30 |
| 286 | Dotted line, 6" (646E20504) | FT | 1,200 | $2.00 | $2.00 | $2.00 |
| 287 | Removal of pavement marking (646E50300) | MI | 0.35 | $3,335.00 | $3,500.00 | $3,335.00 |
| 288 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 22.82 | $3,500.00 | $3,700.00 | $3,500.00 |
| 289 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 20.58 | $1,300.00 | $1,350.00 | $1,300.00 |
| 290 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 8,679 | $1.75 | $1.80 | $1.75 |
| 291 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 9,318 | $1.50 | $1.60 | $1.50 |
| 292 | ITS device, misc.: automated traffic recorder (atr (809E65990) | EACH | 1 | $40,000 | $42,000 | $40,000 |
| 293 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 39.85 | $1,910.00 | $2,000.00 | $1,910.00 |
| 294 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 8,744 | $0.75 | $0.80 | $0.75 |
| 295 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 6,625 | $1.25 | $1.30 | $1.25 |
| 296 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 3.55 | $3,500.00 | $3,700.00 | $3,500.00 |
| 297 | Grooving for 6" recessed pavement marking, (concrete) (850E20110) | FT | 574 | $2.00 | $2.00 | $2.00 |
| 298 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 2,054 | $2.50 | $2.60 | $2.50 |
| 299 | 4" conduit, type E (611E00400) | FT | 120 | $5.00 | $5.00 | $5.00 |
| 300 | Conduit, 2", 725.04 (625E25400) | FT | 53 | $10.00 | $11.00 | $10.00 |
| 301 | Conduit, 3", 725.04 (625E25500) | FT | 198 | $35.00 | $37.00 | $35.00 |
| 302 | Conduit, 4", 725.04 (625E25600) | FT | 54 | $45.00 | $48.00 | $45.00 |
| 303 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 281 | $65.00 | $69.00 | $65.00 |
| 304 | Trench (625E29000) | FT | 237 | $7.00 | $7.50 | $7.00 |
| 305 | Trench in paved area (625E29400) | FT | 41 | $65.00 | $69.00 | $65.00 |
| 306 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,200.00 | $1,300.00 | $1,200.00 |
| 307 | Pull box, 725.08, 24" (625E30706) | EACH | 2 | $1,500.00 | $1,600.00 | $1,500.00 |
| 308 | Pull box removed (625E31510) | EACH | 2 | $200.00 | $213.00 | $200.00 |
| 309 | Ground rod (625E32000) | EACH | 8 | $250.00 | $267.00 | $250.00 |
| 310 | Underground warning/marking tape, as per plan (625E36011) | FT | 278 | $1.40 | $1.50 | $1.40 |
| 311 | Arc flash calculations and label, traffic signal C (625E76000) | EACH | 1 | $500.00 | $534.00 | $500.00 |
| 312 | Arc flash calculations and label: control center " (625E76000) | EACH | 1 | $500.00 | $534.00 | $500.00 |
| 313 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 11 | $850.00 | $908.00 | $850.00 |
| 314 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 2 | $1,500.00 | $1,600.00 | $1,500.00 |
| 315 | Covering of vehicular signal head (632E25000) | EACH | 13 | $10.00 | $11.00 | $10.00 |
| 316 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,353 | $3.00 | $3.00 | $3.00 |
| 317 | Signal support foundation, as per plan (632E64011) | EACH | 6 | $7,000.00 | $7,480.00 | $7,000.00 |
| 318 | Power cable, 2 conductor, no. 4 AWG (632E69200) | FT | 371 | $6.00 | $6.40 | $6.00 |
| 319 | Power service, as per plan (632E70001) | EACH | 2 | $2,500.00 | $2,600.00 | $2,500.00 |
| 320 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 1 | $10,000 | $11,000 | $10,000 |
| 321 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 3 | $13,000 | $14,000 | $13,000 |
| 322 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 1 | $16,500 | $17,000 | $16,500 |
| 323 | Signal support, type TC-81.22, design 14, as per plan (632E72151) | EACH | 1 | $17,500 | $18,700 | $17,500 |
| 324 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 2 | $2,500.00 | $2,600.00 | $2,500.00 |
| 325 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 2 | $17,000 | $18,000 | $17,000 |
| 326 | Cabinet foundation, as per plan (633E67101) | EACH | 2 | $2,500.00 | $2,600.00 | $2,500.00 |
| 327 | Controller work pad, as per plan (633E67201) | EACH | 2 | $1,000.00 | $1,100.00 | $1,000.00 |
| 328 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 2 | $6,000.00 | $6,400.00 | $6,000.00 |
| 329 | Controller item, misc.: communications (633E99000) | EACH | 2 | $2,000.00 | $2,100.00 | $2,000.00 |
| 330 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $8,750.00 | $9,400.00 | $8,750.00 |
| 331 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,500.00 | $9,000.00 | $8,500.00 |
| 332 | Atc controller, as per plan (809E69123) | EACH | 2 | $500.00 | $530.00 | $500.00 |
| 333 | Special - noise barrier (reflective) (606E10210) | SF | 20,772 | $32.00 | $34.50 | $34.50 |
| 334 | Stabilized crushed aggregate (411E10000) | CY | 426 | $40.00 | $144.00 | $100.00 |
| 335 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 14 | $2,600.00 | $2,500.00 | $2,300.00 |
| 336 | 12" conduit, type B (611E04400) | FT | 43 | $96.00 | $92.00 | $175.00 |
| 337 | Slotted drain, type 2, 12" (611E97010) | FT | 845 | $125.00 | $160.00 | $100.00 |
| 338 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 550 | $100.00 | $97.00 | $125.00 |
| 339 | Increased barrier delineation (614E11630) | FT | 833 | $2.91 | $3.00 | $3.50 |
| 340 | Special - work zone guardrail (614E12200) | FT | 3,803 | $35.50 | $28.00 | $25.50 |
| 341 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 18 | $2,300.00 | $28.00 | $2,000.00 |
| 342 | Detour signing (614E12420) | LS | 1 | $27,523 | $30,000 | $35,000 |
| 343 | Work zone increased penalties sign (614E12484) | EACH | 20 | $253.00 | $270.00 | $175.00 |
| 344 | Replacement sign (614E12500) | EACH | 50 | $150.00 | $162.00 | $175.00 |
| 345 | Replacement drum (614E12600) | EACH | 200 | $52.00 | $56.00 | $42.50 |
| 346 | Work zone crossover lighting system (614E12756) | EACH | 4 | $27,500 | $30,000 | $27,500 |
| 347 | Work zone raised pavement marker (614E12800) | EACH | 60 | $30.00 | $7.00 | $7.00 |
| 348 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 6,303 | $53.25 | $46.00 | $35.20 |
| 349 | Asphalt concrete for maintaining traffic (614E13000) | CY | 225 | $140.00 | $390.00 | $150.00 |
| 350 | Barrier reflector, type 1, one way (614E13310) | EACH | 13,248 | $9.00 | $10.00 | $4.00 |
| 351 | Barrier reflector, type 5, one way (614E13318) | EACH | 1,942 | $9.00 | $10.00 | $19.50 |
| 352 | Object marker, one way (614E13350) | EACH | 4,151 | $15.00 | $20.00 | $17.50 |
| 353 | Maintaining traffic, misc.: safety repairs (614E18000) | EACH | 300,000 | $1.00 | $1.00 | $1.00 |
| 354 | Maintaining traffic, misc.: work zone guardrail RE (614E18000) | EACH | 13 | $2,300.00 | $3,500.00 | $25.50 |
| 356 | Portable changeable message sign, as per plan (614E18601) | SNMT | 62 | $500.00 | $980.00 | $500.00 |
| 357 | Work zone lane line, class I, 6" (614E20010) | MI | 11.70 | $300.00 | $320.00 | $300.00 |
| 358 | Work zone lane line, class I, 6", 740.06, type I (614E20210) | MI | 1.17 | $4,361.00 | $4,600.00 | $4,360.00 |
| 359 | Work zone lane line, class I, 6", 648 (614E20366) | MI | 33.20 | $505.00 | $540.00 | $505.00 |
| 360 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 25.38 | $335.00 | $357.00 | $335.00 |
| 361 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.07 | $13,077 | $14,000 | $13,100 |
| 362 | Work zone edge line, class I, 6" (614E22010) | MI | 30.61 | $725.00 | $775.00 | $725.00 |
| 363 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.59 | $7,729.00 | $8,200.00 | $7,730.00 |
| 364 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 2.63 | $10,305 | $11,000 | $10,305 |
| 365 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 80.77 | $1,625.00 | $1,700.00 | $1,625.00 |
| 366 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 27.61 | $935.00 | $1,000.00 | $935.00 |
| 367 | Work zone channelizing line, class I, 12" (614E23010) | FT | 9,575 | $1.00 | $1.00 | $1.00 |
| 368 | Work zone channelizing line, class I, 12", 648 (614E23150) | FT | 28,567 | $1.25 | $1.30 | $1.25 |
| 369 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 8,937 | $0.95 | $1.00 | $0.95 |
| 370 | Work zone dotted line, class I (614E24000) | FT | 12,081 | $0.90 | $1.00 | $0.90 |
| 371 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 30,890 | $1.20 | $1.30 | $1.20 |
| 372 | Work zone dotted line, class I, 4", 740.06, type I (614E24400) | FT | 1,300 | $0.77 | $0.80 | $0.80 |
| 373 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 10,518 | $0.85 | $0.90 | $0.85 |
| 374 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 160 | $6.40 | $7.00 | $6.40 |
| 375 | Work zone stop line, class III, 642 paint (614E26610) | FT | 68 | $4.00 | $4.00 | $4.00 |
| 376 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 16 | $75.00 | $80.00 | $75.00 |
| 377 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $800,000 | $714,000 | $500,000 |
| 378 | Pavement for maintaining traffic, class A (615E20000) | SY | 58,469 | $21.00 | $51.00 | $52.00 |
| 379 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 37,645 | $35.00 | $12.00 | $20.00 |
| 380 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 2,885 | $50.00 | $50.00 | $60.00 |
| 381 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 8,500 | $15.00 | $31.00 | $40.00 |
| 382 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 8,500 | $20.00 | $31.00 | $30.00 |
| 383 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 1,000 | $60.00 | $75.00 | $80.00 |
| 384 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 651 | $40.00 | $55.00 | $85.00 |
| 385 | Water (616E10000) | MGAL | 600 | $10.00 | $76.00 | $10.00 |
| 386 | Portable barrier, unanchored (622E41100) | FT | 29,434 | $14.00 | $8.00 | $8.75 |
| 387 | Portable barrier, unanchored, as per plan (622E41101) | FT | 51,056 | $6.00 | $16.00 | $12.50 |
| 388 | Sign attachment assembly (630E75000) | EACH | 11 | $575.00 | $615.00 | $575.00 |
| 389 | Sign, ground mounted extrusheet (630E80200) | SF | 821 | $22.60 | $24.00 | $22.60 |
| 390 | Sign, overhead extrusheet (630E80224) | SF | 268.50 | $23.00 | $24.00 | $23.00 |
| 391 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 459 | $375.00 | $725.00 | $375.00 |
| 392 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,315 | $26.00 | $45.00 | $42.00 |
| 393 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,568 | $15.00 | $11.00 | $10.00 |
| 394 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,315 | $18.00 | $42.00 | $40.00 |
| 395 | Removal of existing pavement marking (512E74500) | FT | 1,245 | $3.00 | $3.00 | $3.00 |
| 396 | Patching concrete structure, as per plan (519E11101) | SF | 175 | $275.00 | $340.00 | $325.00 |
| 397 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 927 | $26.00 | $42.00 | $42.00 |
| 398 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,693 | $15.00 | $11.00 | $10.00 |
| 399 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 927 | $18.00 | $42.00 | $40.00 |
| 400 | Removal of existing pavement marking (512E74500) | FT | 1,058 | $3.00 | $3.00 | $3.00 |
| 401 | Patching concrete structure, as per plan (519E11101) | SF | 50 | $275.00 | $340.00 | $325.00 |
| 402 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 885 | $26.00 | $44.00 | $42.00 |
| 403 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,834 | $15.00 | $11.00 | $10.00 |
| 404 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 885 | $18.00 | $42.00 | $40.00 |
| 405 | Removal of existing pavement marking (512E74500) | FT | 1,146 | $3.00 | $3.00 | $3.00 |
| 406 | Patching concrete structure, as per plan (519E11101) | SF | 35 | $275.00 | $340.00 | $325.00 |
| 407 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2,545 | $26.00 | $44.00 | $42.00 |
| 408 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 3,676 | $15.00 | $11.00 | $10.00 |
| 409 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 2,545 | $18.00 | $42.00 | $40.00 |
| 410 | Removal of existing pavement marking (512E74500) | FT | 1,601 | $3.00 | $3.00 | $3.00 |
| 411 | Patching concrete structure, as per plan (519E11101) | SF | 25 | $275.00 | $340.00 | $325.00 |
| 412 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2,540 | $26.00 | $44.00 | $42.00 |
| 413 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 3,676 | $15.00 | $11.00 | $10.00 |
| 414 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 2,540 | $18.00 | $42.00 | $40.00 |
| 415 | Removal of existing pavement marking (512E74500) | FT | 1,601 | $3.00 | $3.00 | $3.00 |
| 416 | Patching concrete structure, as per plan (519E11101) | SF | 25 | $275.00 | $340.00 | $325.00 |
| 417 | Patching concrete bridge deck - type C (519E12304) | SY | 5 | $1,915.00 | $1,300.00 | $1,200.00 |
| 418 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,026 | $26.00 | $44.00 | $42.00 |
| 419 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,044 | $15.00 | $11.00 | $10.00 |
| 420 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,026 | $18.00 | $42.00 | $40.00 |
| 421 | Patching concrete structure, as per plan (519E11101) | SF | 175 | $275.00 | $340.00 | $325.00 |
| 422 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 737 | $26.00 | $40.00 | $38.00 |
| 423 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,162 | $15.00 | $11.00 | $10.00 |
| 424 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 737 | $18.00 | $38.00 | $36.00 |
| 425 | Removal of existing pavement marking (512E74500) | FT | 515 | $3.00 | $3.00 | $3.00 |
| 426 | Patching concrete structure, as per plan (519E11101) | SF | 20 | $275.00 | $260.00 | $250.00 |
| 427 | Patching concrete bridge deck - type C (519E12304) | SY | 6 | $1,915.00 | $1,300.00 | $1,200.00 |
| 428 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 737 | $26.00 | $40.00 | $38.00 |
| 429 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,162 | $15.00 | $11.00 | $10.00 |
| 430 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 737 | $18.00 | $38.00 | $36.00 |
| 431 | Removal of existing pavement marking (512E74500) | FT | 515 | $3.00 | $3.00 | $3.00 |
| 432 | Patching concrete structure, as per plan (519E11101) | SF | 20 | $275.00 | $265.00 | $250.00 |
| 433 | Patching concrete bridge deck - type C (519E12304) | SY | 6 | $1,915.00 | $1,300.00 | $1,200.00 |
| 434 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,008 | $26.00 | $44.00 | $42.00 |
| 435 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,033 | $15.00 | $11.00 | $10.00 |
| 436 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,008 | $18.00 | $42.00 | $40.00 |
| 437 | Removal of existing pavement marking (512E74500) | FT | 996 | $3.00 | $3.00 | $3.00 |
| 438 | Patching concrete structure, as per plan (519E11101) | SF | 55 | $275.00 | $347.00 | $325.00 |
| 439 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 722 | $26.00 | $40.00 | $38.00 |
| 440 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,271 | $15.00 | $11.00 | $10.00 |
| 441 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 722 | $18.00 | $38.00 | $36.00 |
| 442 | Removal of existing pavement marking (512E74500) | FT | 554 | $3.00 | $3.00 | $3.00 |
| 443 | Patching concrete structure, as per plan (519E11101) | SF | 20 | $275.00 | $267.00 | $250.00 |
| 444 | Patching concrete bridge deck - type C (519E12304) | SY | 2 | $1,915.00 | $1,300.00 | $1,200.00 |
| 445 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 722 | $26.00 | $40.00 | $38.00 |
| 446 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,271 | $15.00 | $11.00 | $10.00 |
| 447 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 722 | $18.00 | $38.00 | $36.00 |
| 448 | Removal of existing pavement marking (512E74500) | FT | 554 | $3.00 | $3.00 | $3.00 |
| 449 | Patching concrete structure, as per plan (519E11101) | SF | 20 | $275.00 | $267.00 | $250.00 |
| 450 | Patching concrete bridge deck - type C (519E12304) | SY | 5 | $1,915.00 | $1,300.00 | $1,200.00 |
| 451 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,001 | $26.00 | $44.00 | $42.00 |
| 452 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,107 | $15.00 | $11.00 | $10.00 |
| 453 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,001 | $18.00 | $42.00 | $40.00 |
| 454 | Removal of existing pavement marking (512E74500) | FT | 996 | $3.00 | $3.00 | $3.00 |
| 455 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $275.00 | $347.00 | $325.00 |
| 456 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 30,000 | $1.00 | $1.00 | $1.00 |
| 457 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $400,000 | $263,000 | $250,000 |
| 458 | CPM progress schedule (108E10000) | LS | 1 | $20,000 | $12,000 | $75,000 |
| 459 | Maintaining traffic (614E11000) | LS | 1 | $800,000 | $900,000 | $2,403,900 |
| 460 | Field office, type C, as per plan (619E16021) | MNTH | 31 | $3,300.00 | $4,700.00 | $6,500.00 |
| 461 | Construction layout stakes and surveying (623E10000) | LS | 1 | $200,000 | $400,000 | $500,000 |
| 462 | Mobilization (624E10000) | LS | 1 | $1,200,000 | $2,500,000 | $1,200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.