ODOT contract 268014 bid tabulation
POR-/SUM Culverts FY2026 (CULVERT REPLACEMENT). Let by Ohio DOT on June 25, 2026, POR. 3 bids received; low bid $1,233,250 by Eclipse Co LLC, -6.8% against the engineer's estimate of $1,323,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 125
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eclipse Co LLC | $1,233,250 | Low | -7.0% |
| 2 | S E T Inc | $1,349,754 | +9.0% | +2.0% |
| 3 | Kenmore Construction Co Inc | $1,436,428 | +16% | +9.0% |
Engineer's estimate: $1,323,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eclipse Co LLC | 2. S E T Inc | 3. Kenmore Construction Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $8,000.00 | $5,000.00 |
| 2 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 |
| 3 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $8,000.00 | $5,000.00 |
| 4 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $10,000 | $10,000 | $15,000 |
| 5 | Structure removed (202E11000) | LS | 1 | $3,207.83 | $2,000.00 | $15,000 |
| 6 | Structure removed, as per plan (202E11001) | LS | 1 | $4,717.11 | $20,000 | $20,000 |
| 7 | Headwall removed (202E20010) | EACH | 2 | $377.31 | $1,000.00 | $2,000.00 |
| 8 | Headwall removed (202E20010) | EACH | 1 | $1,509.26 | $1,500.00 | $3,000.00 |
| 9 | Pavement removed (202E23000) | SY | 433 | $69.93 | $25.00 | $28.00 |
| 10 | Pavement removed (202E23000) | SY | 177 | $72.56 | $25.00 | $28.00 |
| 11 | Pipe removed, 24" and under (202E35100) | FT | 60 | $34.60 | $20.00 | $24.00 |
| 12 | Pipe removed, 24" and under (202E35100) | FT | 50 | $37.74 | $25.00 | $50.00 |
| 13 | Pipe removed, over 24" diameter (202E35200) | FT | 151 | $30.55 | $40.00 | $110.00 |
| 14 | Guardrail removed (202E38000) | FT | 762.50 | $2.40 | $5.00 | $4.00 |
| 15 | Guardrail removed (202E38000) | FT | 412.50 | $2.40 | $5.00 | $4.00 |
| 16 | Anchor assembly removed, type E (202E42010) | EACH | 4 | $165.00 | $225.00 | $200.00 |
| 17 | Anchor assembly removed, type E (202E42010) | EACH | 5 | $165.00 | $225.00 | $200.00 |
| 18 | Catch basin removed (202E58100) | EACH | 1 | $786.24 | $900.00 | $500.00 |
| 19 | Excavation (203E10000) | CY | 843 | $47.41 | $28.00 | $40.00 |
| 20 | Excavation (203E10000) | CY | 1,067 | $15.12 | $28.00 | $40.00 |
| 21 | Embankment (203E20000) | CY | 434 | $15.53 | $25.00 | $30.00 |
| 22 | Embankment (203E20000) | CY | 1,668 | $8.08 | $28.00 | $20.00 |
| 23 | Subgrade compaction (204E10000) | SY | 400 | $2.27 | $4.00 | $5.00 |
| 24 | Subgrade compaction (204E10000) | SY | 199 | $1.71 | $4.00 | $5.00 |
| 25 | Linear grading, as per plan (209E60201) | STA | 4 | $125.00 | $300.00 | $500.00 |
| 26 | Guardrail, type MGS (606E15050) | FT | 200 | $22.80 | $25.00 | $31.00 |
| 27 | Guardrail, type MGS (606E15050) | FT | 375 | $22.80 | $25.00 | $31.00 |
| 28 | Guardrail, type MGS with long posts (606E15100) | FT | 675 | $27.40 | $30.00 | $37.00 |
| 29 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,620.00 | $3,000.00 | $2,950.00 |
| 30 | Anchor assembly, MGS type E (MASH 2016) (sum-303- (606E26150) | EACH | 4 | $2,620.00 | $3,000.00 | $2,950.00 |
| 31 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,385.00 | $1,500.00 | $1,750.00 |
| 32 | Special - maintain existing sanitary line (sum-30 (690E21000) | LS | 1 | $6,582.70 | $7,000.00 | $5,000.00 |
| 33 | Special - as-built construction plans (690E91000) | LS | 1 | $1,717.68 | $8,000.00 | $2,500.00 |
| 34 | Special - as-built construction plans (690E91000) | LS | 1 | $687.08 | $3,500.00 | $2,000.00 |
| 35 | Riprap, type D (601E11000) | SY | 13 | $731.91 | $225.00 | $300.00 |
| 36 | Riprap, type D (601E11000) | SY | 36 | $281.78 | $180.00 | $250.00 |
| 37 | Rock channel protection, type A with filter (601E32000) | CY | 121 | $145.14 | $140.00 | $220.00 |
| 38 | Rock channel protection, type B with filter (601E32100) | CY | 13 | $223.01 | $190.00 | $300.00 |
| 39 | Rock channel protection, type C with filter (601E32200) | CY | 12 | $224.56 | $190.00 | $300.00 |
| 40 | Rock channel protection, type C with filter (601E32200) | CY | 1 | $795.48 | $300.00 | $800.00 |
| 41 | Soil analysis test (659E00100) | EACH | 6 | $60.00 | $70.00 | $25.00 |
| 42 | Soil analysis test (659E00100) | EACH | 2 | $60.00 | $70.00 | $25.00 |
| 43 | Topsoil (659E00300) | CY | 453 | $112.88 | $75.00 | $24.00 |
| 44 | Topsoil (659E00300) | CY | 257 | $100.48 | $80.00 | $24.00 |
| 45 | Seeding and mulching, class 1 (659E00500) | SY | 4,068 | $2.05 | $3.00 | $5.00 |
| 46 | Seeding and mulching, class 1 (659E00500) | SY | 2,315 | $2.05 | $3.00 | $5.00 |
| 47 | Repair seeding and mulching (659E14000) | SY | 116 | $2.00 | $2.00 | $5.00 |
| 48 | Inter-seeding (659E15000) | SY | 116 | $0.60 | $1.00 | $3.00 |
| 49 | Commercial fertilizer (659E20000) | TON | 0.56 | $800.00 | $850.00 | $250.00 |
| 50 | Commercial fertilizer (659E20000) | TON | 0.32 | $800.00 | $850.00 | $250.00 |
| 51 | Lime (659E31000) | ACRE | 0.84 | $0.30 | $60.00 | $25.00 |
| 52 | Lime (659E31000) | ACRE | 0.48 | $0.29 | $60.00 | $25.00 |
| 53 | Water (659E35000) | MGAL | 22 | $0.30 | $1.00 | $10.00 |
| 54 | Water (659E35000) | MGAL | 13 | $0.30 | $1.00 | $10.00 |
| 55 | Slope erosion protection (670E00500) | SY | 232 | $4.00 | $5.00 | $1.25 |
| 56 | Ditch erosion protection mat, type B (670E00720) | SY | 94 | $4.00 | $5.00 | $1.35 |
| 57 | Erosion control (832E30000) | EACH | 46,000 | $1.00 | $1.00 | $1.00 |
| 58 | Erosion control (832E30000) | EACH | 113,500 | $1.00 | $1.00 | $1.00 |
| 59 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 405 | $4.00 | $9.00 | $4.00 |
| 60 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 67 | $4.00 | $11.00 | $5.00 |
| 61 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $14,000 | $25,000 | $3,000.00 |
| 62 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $14,000 | $65,000 | $5,000.00 |
| 63 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $14,000 | $25,000 | $5,000.00 |
| 64 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $23,000 | $65,000 | $15,000 |
| 65 | Concrete masonry (602E20000) | CY | 7 | $2,593.94 | $1,700.00 | $2,900.00 |
| 66 | Concrete masonry (602E20000) | CY | 9.20 | $1,583.70 | $1,700.00 | $2,000.00 |
| 67 | 12" conduit, type B (611E04400) | FT | 30 | $90.00 | $105.00 | $135.00 |
| 68 | 12" conduit, type B (611E04400) | FT | 10 | $65.00 | $130.00 | $150.00 |
| 69 | 12" conduit, type C (611E04600) | FT | 30 | $90.00 | $95.00 | $135.00 |
| 70 | 12" conduit, type C (611E04600) | FT | 10 | $65.00 | $110.00 | $200.00 |
| 71 | 12" conduit, type E (611E05100) | FT | 30 | $90.00 | $80.00 | $135.00 |
| 72 | 12" conduit, type E (611E05100) | FT | 10 | $65.00 | $90.00 | $200.00 |
| 73 | 12" conduit, type F (611E05200) | FT | 30 | $90.00 | $80.00 | $135.00 |
| 74 | 12" conduit, type F (611E05200) | FT | 10 | $65.00 | $90.00 | $200.00 |
| 75 | 15" conduit, type C (611E06100) | FT | 8 | $93.40 | $160.00 | $520.00 |
| 76 | 18" conduit, type C (611E07600) | FT | 84 | $148.79 | $130.00 | $160.00 |
| 77 | 18" conduit, type C (611E07600) | FT | 39 | $231.62 | $165.00 | $400.00 |
| 78 | 42" conduit, type A, 706.02, 707.33 or 707.01 (0.0 (611E19200) | FT | 140 | $339.51 | $275.00 | $510.00 |
| 79 | 54" conduit, type A (611E22200) | FT | 71 | $373.43 | $325.00 | $610.00 |
| 80 | 90" conduit, type A, as per plan, 707.02 (0.138) W (611E29001) | FT | 90 | $1,079.24 | $1,325.00 | $1,705.00 |
| 81 | 38" X 60" conduit, type A, 706.04 (611E53000) | FT | 60 | $538.60 | $550.00 | $1,200.00 |
| 82 | Manhole, no. 3 (611E99574) | EACH | 2 | $8,663.93 | $4,500.00 | $6,500.00 |
| 83 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 78 | $500.00 | $500.00 | $350.00 |
| 84 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 40 | $500.00 | $415.00 | $375.00 |
| 85 | Aggregate base (304E20000) | CY | 50 | $174.52 | $90.00 | $110.00 |
| 86 | Aggregate base (304E20000) | CY | 40 | $164.15 | $90.00 | $110.00 |
| 87 | Non-tracking tack coat (407E20000) | GAL | 53 | $25.00 | $4.00 | $10.00 |
| 88 | Non-tracking tack coat (407E20000) | GAL | 30 | $25.00 | $4.00 | $10.00 |
| 89 | Prime coat, as per plan (408E10001) | GAL | 9 | $25.00 | $70.00 | $20.00 |
| 90 | Prime coat, as per plan (408E10001) | GAL | 12 | $25.00 | $70.00 | $20.00 |
| 91 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 30 | $850.00 | $1,300.00 | $525.00 |
| 92 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 15 | $850.00 | $715.00 | $600.00 |
| 93 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 15 | $850.00 | $925.00 | $500.00 |
| 94 | Compacted aggregate, as per plan (617E10101) | CY | 2 | $500.00 | $125.00 | $300.00 |
| 95 | Compacted aggregate, as per plan (617E10101) | CY | 1 | $500.00 | $150.00 | $300.00 |
| 96 | Raised pavement marker removed (621E54000) | EACH | 2 | $65.00 | $30.00 | $5.00 |
| 97 | Raised pavement marker removed (621E54000) | EACH | 9 | $65.00 | $30.00 | $5.00 |
| 98 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 24 | $14.00 | $15.00 | $13.00 |
| 99 | Barrier reflector, type 2, bidirectional (sum-303 (626E00110) | EACH | 11 | $14.00 | $15.00 | $13.00 |
| 100 | Ground mounted support, no. 2 post (630E02100) | FT | 45 | $26.00 | $30.00 | $25.00 |
| 101 | Ground mounted support, no. 2 post (630E02100) | FT | 15 | $26.00 | $30.00 | $25.00 |
| 102 | Ground mounted support, no. 3 post (630E03100) | FT | 24 | $34.00 | $30.00 | $27.50 |
| 103 | Sign post reflector (630E08600) | EACH | 1 | $45.00 | $50.00 | $40.00 |
| 104 | Sign, flat sheet (630E80100) | SF | 16.30 | $30.00 | $35.00 | $32.20 |
| 105 | Sign, flat sheet (630E80100) | SF | 6 | $30.00 | $35.00 | $32.50 |
| 106 | Sign, flat sheet (630E80100) | SF | 2 | $30.00 | $35.00 | $32.50 |
| 107 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $15.00 | $20.00 | $15.00 |
| 108 | Removal of ground mounted sign and disposal (630E84900) | EACH | 5 | $15.00 | $20.00 | $15.00 |
| 109 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $20.00 | $20.00 | $15.00 |
| 110 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $20.00 | $20.00 | $15.00 |
| 111 | Edge line, 6", type 1 (642E00104) | MI | 0.08 | $29,610 | $30,000 | $25,000 |
| 112 | Edge line, 6", type 1 (642E00104) | MI | 0.03 | $29,610 | $30,000 | $25,000 |
| 113 | Center line, type 1 (642E00300) | MI | 0.05 | $39,480 | $30,000 | $27,500 |
| 114 | Center line, type 1 (642E00300) | MI | 0.02 | $39,480 | $30,000 | $27,500 |
| 115 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 30 | $80.00 | $90.00 | $120.00 |
| 116 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 10 | $90.00 | $90.00 | $120.00 |
| 117 | Detour signing (614E12420) | LS | 1 | $23,136 | $22,000 | $30,000 |
| 118 | Detour signing (614E12420) | LS | 1 | $8,274.58 | $7,000.00 | $10,000 |
| 119 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $1,096.57 | $950.00 | $1,300.00 |
| 120 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $1,096.57 | $950.00 | $1,300.00 |
| 121 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,577 | $15,000 | $25,000 |
| 122 | Maintaining traffic (614E11000) | LS | 1 | $9,653.56 | $28,000 | $25,000 |
| 123 | Field office, type B (619E16010) | MNTH | 12 | $1,622.53 | $1,500.00 | $3,500.00 |
| 124 | Construction layout stakes and surveying (623E10000) | LS | 1 | $13,266 | $30,000 | $18,000 |
| 125 | Mobilization (624E10000) | LS | 1 | $102,846 | $50,000 | $110,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.