ODOT contract 268009 bid tabulation
SUM-SR 261-00.00/VAR (TWO LANE RESURFACING). Let by Ohio DOT on April 23, 2026, SUM. 5 bids received; low bid $3,560,027 by Kenmore Construction Co Inc, -19% against the engineer's estimate of $4,377,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 144
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kenmore Construction Co Inc | $3,560,027 | Low | -19% |
| 2 | Shelly Company | $3,783,497 | +6.0% | -14% |
| 3 | Karvo Companies Inc | $3,845,131 | +8.0% | -12% |
| 4 | Shelly & Sands Inc | $3,918,454 | +10% | -10% |
| 5 | Kokosing Construction Company Inc | $4,555,800 | +28% | +4.0% |
Engineer's estimate: $4,377,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kenmore Construction Co Inc | 2. Shelly Company | 3. Karvo Companies Inc | 4. Shelly & Sands Inc | 5. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 683 | $8.00 | $16.00 | $1.00 | $15.00 | $4.00 |
| 2 | Walk removed (202E30000) | SF | 5,279 | $3.00 | $6.30 | $8.00 | $4.40 | $2.50 |
| 3 | Curb removed (202E32000) | FT | 88 | $5.00 | $20.50 | $35.00 | $25.00 | $24.25 |
| 4 | Curb and gutter removed (202E32500) | FT | 430 | $6.00 | $23.50 | $45.00 | $20.00 | $16.25 |
| 5 | Guardrail removed (202E38000) | FT | 887.50 | $2.40 | $2.40 | $2.40 | $2.40 | $2.00 |
| 6 | Removal misc.: barrier reflector (202E98100) | EACH | 15 | $8.00 | $5.00 | $5.00 | $5.00 | $12.19 |
| 7 | Excavation (203E10000) | CY | 28 | $30.00 | $28.00 | $25.00 | $100.00 | $66.87 |
| 8 | Linear grading (209E60200) | STA | 154 | $60.00 | $55.00 | $45.00 | $80.00 | $30.00 |
| 9 | Preparing subgrade for shoulder paving (209E72000) | STA | 285 | $30.00 | $55.00 | $12.00 | $30.00 | $65.00 |
| 10 | Guardrail, type 5 (606E13000) | FT | 400 | $20.20 | $21.40 | $21.40 | $21.40 | $22.00 |
| 11 | Guardrail, type MGS (606E15050) | FT | 150 | $21.40 | $22.80 | $22.80 | $22.80 | $22.00 |
| 12 | Guardrail, type MGS with long posts (606E15100) | FT | 275 | $23.60 | $28.60 | $28.60 | $28.60 | $29.00 |
| 13 | Anchor assembly, MGS type E (606E26150) | EACH | 8 | $2,550.00 | $2,920.00 | $2,920.00 | $2,920.00 | $2,950.00 |
| 14 | Anchor assembly, MGS type T (606E26550) | EACH | 8 | $1,345.00 | $1,380.00 | $1,380.00 | $1,380.00 | $1,650.00 |
| 15 | Bridge terminal assembly, type 4 (606E35140) | EACH | 16 | $980.00 | $1,175.00 | $1,175.00 | $1,175.00 | $1,375.00 |
| 16 | 6" concrete walk (608E13000) | SF | 1,633 | $12.00 | $22.00 | $12.00 | $20.00 | $14.50 |
| 17 | Curb ramp, as per plan (608E52001) | SF | 3,646 | $20.00 | $25.00 | $15.00 | $37.00 | $15.50 |
| 18 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 19 | $1,800.00 | $1,300.00 | $1,300.00 | $1,300.00 | $1,225.00 |
| 19 | Special - as-built construction plans (690E20010) | LS | 1 | $2,000.00 | $6,500.00 | $1,000.00 | $2,000.00 | $2,500.00 |
| 20 | Seeding and mulching (659E10000) | SY | 199 | $5.00 | $30.00 | $15.00 | $15.00 | $4.00 |
| 21 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Catch basin adjusted to grade (611E98630) | EACH | 5 | $440.00 | $2,000.00 | $2,000.00 | $2,000.00 | $1,084.95 |
| 23 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 57 | $2,000.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,224.95 |
| 24 | Special - miscellaneous metal (611E99820) | LB | 400 | $3.00 | $4.00 | $4.00 | $4.00 | $2.45 |
| 25 | Partial depth pavement repair (441) (251E01000) | SY | 2,000 | $35.00 | $46.00 | $35.00 | $50.00 | $78.00 |
| 26 | Full depth pavement sawing (252E01500) | FT | 2,341 | $3.85 | $3.00 | $2.50 | $3.60 | $4.24 |
| 27 | Pavement repair (253E01000) | SY | 30 | $140.00 | $175.00 | $100.00 | $185.00 | $295.00 |
| 28 | Pavement repair (253E01000) | SY | 470 | $200.00 | $195.00 | $125.00 | $300.00 | $300.00 |
| 29 | Pavement planing, asphalt concrete (T = 2") (254E01000) | SY | 138,100 | $1.50 | $1.40 | $2.00 | $1.10 | $1.65 |
| 30 | Aggregate base (304E20000) | CY | 28 | $60.00 | $60.00 | $25.00 | $100.00 | $100.00 |
| 31 | Non-tracking tack coat (407E20000) | GAL | 20,589 | $5.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 32 | Prime coat, as per plan (408E10001) | GAL | 4,894 | $5.00 | $4.00 | $5.25 | $3.50 | $4.00 |
| 33 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 4,032 | $245.00 | $235.00 | $250.00 | $265.00 | $310.00 |
| 34 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 3,838 | $190.00 | $180.00 | $215.00 | $206.00 | $240.00 |
| 35 | Combination curb and gutter, type 2 (609E12000) | FT | 430 | $60.00 | $50.00 | $75.00 | $83.00 | $29.15 |
| 36 | Curb, type 6 (609E26000) | FT | 88 | $60.00 | $55.00 | $65.00 | $118.00 | $37.50 |
| 37 | Compacted aggregate (617E10100) | CY | 351 | $55.00 | $80.00 | $100.00 | $85.00 | $40.00 |
| 38 | Valve box adjusted to grade (638E10800) | EACH | 8 | $2,000.00 | $1,100.00 | $1,100.00 | $1,100.00 | $594.95 |
| 39 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 4 | $12.00 | $12.50 | $12.50 | $12.50 | $13.00 |
| 40 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 30 | $12.90 | $15.00 | $15.00 | $15.00 | $13.00 |
| 41 | Ground mounted support, no. 2 post (630E02100) | FT | 90 | $38.98 | $12.50 | $12.50 | $20.00 | $12.50 |
| 42 | Sign, flat sheet (630E80100) | SF | 24 | $42.61 | $40.00 | $40.00 | $27.50 | $40.00 |
| 43 | Removal of ground mounted sign and disposal (630E84900) | EACH | 12 | $16.68 | $25.00 | $25.00 | $15.00 | $25.00 |
| 44 | Removal of ground mounted post support and disposal (630E86002) | EACH | 12 | $22.24 | $25.00 | $25.00 | $20.00 | $25.00 |
| 45 | Edge line, 4" (644E00100) | MI | 3.17 | $4,600.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 46 | Lane line, 4" (644E00200) | MI | 0.13 | $2,300.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 47 | Center line (644E00300) | MI | 2.42 | $5,200.00 | $4,950.00 | $4,950.00 | $4,950.00 | $4,950.00 |
| 48 | Channelizing line, 8" (644E00400) | FT | 2,527 | $1.70 | $1.75 | $1.75 | $1.75 | $1.75 |
| 49 | Stop line (644E00500) | FT | 404 | $8.00 | $6.75 | $6.75 | $6.75 | $6.75 |
| 50 | Crosswalk line, 24" (644E00630) | FT | 2,940 | $5.00 | $6.75 | $6.75 | $6.75 | $6.75 |
| 51 | Transverse/diagonal line (644E00700) | FT | 343 | $8.00 | $6.75 | $6.75 | $6.75 | $6.75 |
| 52 | Island marking (644E00900) | SF | 456 | $7.00 | $6.75 | $6.75 | $6.75 | $6.75 |
| 53 | Lane arrow (644E01300) | EACH | 63 | $120.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 54 | Green colored pavement for bike lanes (644E60000) | SF | 1,440 | $11.00 | $12.50 | $12.50 | $12.50 | $12.50 |
| 55 | Edge line, 4" (646E10000) | MI | 11.28 | $3,118.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 56 | Center line (646E10200) | MI | 5.64 | $3,900.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 57 | Channelizing line, 8" (646E10300) | FT | 514 | $1.60 | $1.75 | $1.75 | $1.75 | $1.75 |
| 58 | Stop line (646E10400) | FT | 108 | $11.00 | $12.50 | $12.50 | $12.50 | $12.50 |
| 59 | Crosswalk line, 24" (646E10520) | FT | 100 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 60 | Transverse/diagonal line (646E10600) | FT | 160 | $8.00 | $12.50 | $12.50 | $12.50 | $12.50 |
| 61 | Lane arrow (646E20300) | EACH | 13 | $160.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 62 | Special - bicycle lane arrow marking, 647 paint (690E98000) | EACH | 63 | $220.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 63 | Special - bicycle lane bike symbol, 647 paint (690E98000) | EACH | 63 | $310.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 64 | Detector loop, as per plan (632E26501) | EACH | 20 | $1,550.00 | $1,725.00 | $1,725.00 | $1,650.00 | $1,650.00 |
| 65 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $100.00 | $120.00 | $125.00 | $92.00 | $130.00 |
| 66 | Work zone marking sign (614E12460) | EACH | 26 | $58.15 | $65.00 | $65.00 | $65.00 | $65.00 |
| 67 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $200.00 | $125.00 | $300.00 | $450.00 | $125.00 |
| 68 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $800.00 | $875.00 | $875.00 | $875.00 | $800.00 |
| 69 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 0.26 | $700.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 70 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.13 | $675.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 71 | Work zone center line, class I, 642 paint (614E21100) | MI | 16.82 | $900.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 72 | Work zone center line, class III, 642 paint (614E21550) | MI | 8.41 | $875.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 73 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 14.45 | $600.00 | $425.00 | $425.00 | $425.00 | $425.00 |
| 74 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 6,082 | $0.60 | $0.75 | $0.75 | $0.75 | $0.75 |
| 75 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 3,041 | $0.55 | $0.75 | $0.75 | $0.75 | $0.75 |
| 76 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,024 | $3.20 | $3.50 | $3.50 | $3.50 | $3.50 |
| 77 | Work zone stop line, class III, 642 paint (614E26610) | FT | 512 | $3.00 | $3.50 | $3.50 | $3.50 | $3.50 |
| 78 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $3,000.00 | $3,000.00 |
| 79 | Wearing course removed (202E23500) | SY | 245 | $20.00 | $30.00 | $2.00 | $50.00 | $35.00 |
| 80 | Tack coat, 702.13 (407E13900) | GAL | 20 | $10.00 | $6.00 | $2.40 | $5.00 | $3.40 |
| 81 | Non-tracking tack coat (407E20000) | GAL | 15 | $10.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 82 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 60 | $40.00 | $50.00 | $30.00 | $50.00 | $50.00 |
| 83 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 9 | $325.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 84 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 15 | $330.00 | $560.00 | $215.00 | $250.00 | $240.00 |
| 85 | Type 3 waterproofing (512E33010) | SY | 225 | $50.00 | $50.00 | $52.58 | $50.00 | $50.00 |
| 86 | Special - steel drip strip (518E22300) | FT | 83 | $10.00 | $10.00 | $21.09 | $10.00 | $10.00 |
| 87 | Patching concrete bridge deck - type C (519E12304) | SY | 15 | $1,000.00 | $1,000.00 | $805.50 | $1,000.00 | $1,000.00 |
| 88 | Special - structures: concrete spall removal with (530E00800) | SY | 10 | $1,500.00 | $1,500.00 | $378.30 | $1,500.00 | $1,500.00 |
| 89 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $3,000.00 | $3,000.00 |
| 90 | Pavement planing, asphalt concrete(T=2.00?) (254E01000) | SY | 105 | $12.00 | $3.00 | $2.00 | $13.00 | $1.75 |
| 91 | Non-tracking tack coat (407E20000) | GAL | 17 | $10.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 92 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 70 | $40.00 | $50.00 | $28.95 | $50.00 | $50.00 |
| 93 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 3 | $500.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 94 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 3 | $450.00 | $230.00 | $215.00 | $195.00 | $240.00 |
| 95 | Wearing course removed (202E23500) | SY | 650 | $20.00 | $12.00 | $5.00 | $30.00 | $55.00 |
| 96 | Tack coat, 702.13 (407E13900) | GAL | 54 | $10.00 | $6.00 | $2.40 | $5.00 | $3.40 |
| 97 | Non-tracking tack coat (407E20000) | GAL | 39 | $10.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 98 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 76 | $30.00 | $50.00 | $28.95 | $50.00 | $50.00 |
| 99 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 19 | $300.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 100 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 74 | $220.00 | $205.00 | $215.00 | $250.00 | $240.00 |
| 101 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 11 | $50.00 | $50.00 | $67.35 | $50.00 | $50.00 |
| 102 | Type 3 waterproofing (512E33010) | SY | 650 | $30.00 | $30.00 | $52.58 | $30.00 | $30.00 |
| 103 | Special - steel drip strip (518E22300) | FT | 263 | $10.00 | $10.00 | $21.06 | $10.00 | $10.00 |
| 104 | Patching concrete structure, as per plan (519E11101) | SF | 85 | $175.00 | $175.00 | $146.13 | $175.00 | $175.00 |
| 105 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $3,000.00 | $3,000.00 |
| 106 | Wearing course removed (202E23500) | SY | 396 | $20.00 | $20.00 | $5.00 | $30.00 | $35.00 |
| 107 | Tack coat, 702.13 (407E13900) | GAL | 33 | $10.00 | $6.00 | $2.40 | $5.00 | $3.40 |
| 108 | Non-tracking tack coat (407E20000) | GAL | 24 | $10.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 109 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 56 | $45.00 | $50.00 | $28.95 | $50.00 | $50.00 |
| 110 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 12 | $320.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 111 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 46 | $200.00 | $260.00 | $215.00 | $250.00 | $240.00 |
| 112 | Type 3 waterproofing (512E33010) | SY | 396 | $40.00 | $40.00 | $52.58 | $40.00 | $40.00 |
| 113 | Special - steel drip strip (518E22300) | FT | 141 | $10.00 | $10.00 | $21.06 | $10.00 | $10.00 |
| 114 | Patching concrete bridge deck - type C (519E12304) | SY | 18 | $1,000.00 | $1,000.00 | $805.50 | $1,000.00 | $1,000.00 |
| 115 | Special - structures: concrete spall removal with (530E00800) | SY | 5 | $1,500.00 | $1,500.00 | $378.30 | $1,500.00 | $1,500.00 |
| 116 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $3,000.00 | $3,000.00 |
| 117 | Wearing course removed (202E23500) | SY | 262 | $20.00 | $20.00 | $5.00 | $30.00 | $35.00 |
| 118 | Wearing course removed (202E23500) | SY | 134 | $20.00 | $25.00 | $5.00 | $30.00 | $55.00 |
| 119 | Tack coat, 702.13 (407E13900) | GAL | 33 | $10.00 | $6.00 | $2.48 | $5.00 | $3.72 |
| 120 | Non-tracking tack coat (407E20000) | GAL | 24 | $10.00 | $3.00 | $2.40 | $3.05 | $3.72 |
| 121 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 54 | $45.00 | $50.00 | $28.95 | $50.00 | $50.00 |
| 122 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 12 | $300.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 123 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 35 | $200.00 | $305.00 | $215.00 | $250.00 | $240.00 |
| 124 | Type 3 waterproofing (512E33010) | SY | 396 | $40.00 | $40.00 | $52.58 | $40.00 | $40.00 |
| 125 | Special - steel drip strip (518E22300) | FT | 165 | $10.00 | $10.00 | $21.06 | $10.00 | $10.00 |
| 126 | Patching concrete bridge deck - type C (519E12304) | SY | 49 | $600.00 | $750.00 | $805.50 | $750.00 | $750.00 |
| 127 | Special - structures: concrete spall removal with (530E00800) | SY | 10 | $1,500.00 | $1,500.00 | $378.30 | $1,500.00 | $1,500.00 |
| 128 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $3,000.00 | $3,000.00 |
| 129 | Wearing course removed (202E23500) | SY | 191 | $20.00 | $20.00 | $5.00 | $30.00 | $35.00 |
| 130 | Wearing course removed (202E23500) | SY | 117 | $20.00 | $30.00 | $5.00 | $30.00 | $55.00 |
| 131 | Tack coat, 702.13 (407E13900) | GAL | 26 | $10.00 | $6.00 | $2.40 | $5.00 | $3.40 |
| 132 | Non-tracking tack coat (407E20000) | GAL | 20 | $10.00 | $3.00 | $2.40 | $3.05 | $2.50 |
| 133 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 62 | $40.00 | $50.00 | $28.95 | $50.00 | $50.00 |
| 134 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 11 | $300.00 | $280.00 | $250.00 | $250.00 | $310.00 |
| 135 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 28 | $200.00 | $355.00 | $215.00 | $250.00 | $240.00 |
| 136 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 4 | $100.00 | $100.00 | $67.35 | $100.00 | $100.00 |
| 137 | Type 3 waterproofing (512E33010) | SY | 308 | $45.00 | $45.00 | $52.58 | $45.00 | $45.00 |
| 138 | Special - steel drip strip (518E22300) | FT | 97 | $10.00 | $10.00 | $21.06 | $10.00 | $10.00 |
| 139 | Patching concrete structure, as per plan (519E11101) | SF | 30 | $200.00 | $200.00 | $146.13 | $200.00 | $200.00 |
| 140 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $15,000 | $21,000 | $12,000 | $18,225 |
| 141 | Maintaining traffic (614E11000) | LS | 1 | $150,000 | $400,000 | $225,000 | $244,097 | $460,950 |
| 142 | Field office, type B (619E16010) | MNTH | 6 | $3,500.00 | $4,000.00 | $3,000.00 | $4,000.00 | $4,300.00 |
| 143 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $3,500.00 | $3,000.00 |
| 144 | Mobilization (624E10000) | LS | 1 | $90,000 | $100,000 | $235,341 | $100,000 | $227,770 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.