ODOT contract 260510 bid tabulation
SUM-SR 261-11.89 (FOUR LANE RESURFACING). Let by Ohio DOT on November 12, 2026, SUM. 7 bids received; low bid $1,380,867 by Kenmore Construction Co Inc, -16% against the engineer's estimate of $1,651,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 50
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kenmore Construction Co Inc | $1,380,867 | Low | -16% |
| 2 | Shelly & Sands Inc | $1,621,904 | +17% | -2.0% |
| 3 | Karvo Companies Inc | $1,765,136 | +28% | +7.0% |
| 4 | Geauga Highway Co | $1,793,995 | +30% | +9.0% |
| 5 | Shelly Company | $1,890,404 | +37% | +15% |
| 6 | Barbicas Construction Company Inc | $1,948,284 | +41% | +18% |
| 7 | Kokosing Construction Company Inc | $2,187,370 | +58% | +32% |
Engineer's estimate: $1,651,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kenmore Construction Co Inc | 2. Shelly & Sands Inc | 3. Karvo Companies Inc | 4. Geauga Highway Co | 5. Shelly Company | 6. Barbicas Construction Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 4,820 | $2.00 | $2.25 | $8.00 | $3.75 | $6.65 | $4.00 |
| 2 | Curb removed (202E32000) | FT | 427 | $6.00 | $12.00 | $25.00 | $14.00 | $12.00 | $10.00 |
| 3 | 4" concrete walk (608E10000) | SF | 1,491 | $12.00 | $15.00 | $12.00 | $14.00 | $7.95 | $12.00 |
| 4 | Curb ramp, as per plan (608E52001) | SF | 3,329 | $24.00 | $33.00 | $15.00 | $24.50 | $26.50 | $40.00 |
| 5 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 14 | $1,500.00 | $1,580.00 | $1,500.00 | $650.00 | $1,500.00 | $1,400.00 |
| 6 | Special - as-built construction plans (690E91000) | LS | 1 | $2,000.00 | $2,200.00 | $700.00 | $2,000.00 | $6,000.00 | $500.00 |
| 7 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 8 | Catch basin adjusted to grade (611E98630) | EACH | 5 | $1,200.00 | $2,500.00 | $2,500.00 | $1,225.00 | $2,500.00 | $1,000.00 |
| 9 | Catch basin reconstructed to grade (611E98634) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $1,950.00 | $3,000.00 | $2,100.00 |
| 10 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 50 | $1,800.00 | $1,600.00 | $1,600.00 | $1,225.00 | $1,600.00 | $1,400.00 |
| 11 | Special - miscellaneous metal (611E99820) | LB | 800 | $3.50 | $4.00 | $4.00 | $3.00 | $4.00 | $2.00 |
| 12 | Partial depth pavement repair (441) (251E01000) | SY | 1,450 | $30.00 | $53.00 | $35.00 | $73.00 | $50.00 | $26.00 |
| 13 | Partial depth pavement repair (441) (251E01000) | SY | 550 | $32.00 | $46.00 | $50.00 | $75.00 | $70.00 | $47.00 |
| 14 | Full depth pavement sawing (252E01500) | FT | 100 | $10.00 | $23.00 | $5.00 | $6.00 | $4.00 | $15.00 |
| 15 | Pavement repair (253E01000) | SY | 200 | $120.00 | $270.00 | $250.00 | $150.00 | $175.00 | $175.00 |
| 16 | Pavement planing, asphalt concrete (T=2") (254E01000) | SY | 60,870 | $1.40 | $1.20 | $2.15 | $4.75 | $2.55 | $3.05 |
| 17 | Non-tracking tack coat (407E20000) | GAL | 5,479 | $4.00 | $3.25 | $3.50 | $3.50 | $3.10 | $3.50 |
| 18 | Asphalt concrete surface course, 12.5 MM, type B (448) (442E20050) | CY | 3,382 | $219.00 | $229.50 | $255.00 | $273.00 | $255.00 | $250.00 |
| 19 | Curb, type 6 (609E26000) | FT | 84 | $75.00 | $129.00 | $115.00 | $65.00 | $52.90 | $120.00 |
| 20 | Valve box adjusted to grade (638E10800) | EACH | 30 | $250.00 | $96.00 | $1,400.00 | $650.00 | $1,400.00 | $300.00 |
| 21 | Edge line, 6" (646E10010) | MI | 0.08 | $3,726.00 | $3,726.00 | $3,726.00 | $3,726.00 | $3,726.00 | $3,726.00 |
| 22 | Lane line, 6" (646E10110) | MI | 3.41 | $2,245.00 | $2,245.00 | $2,245.00 | $2,245.00 | $2,245.00 | $2,245.00 |
| 23 | Center line (646E10200) | MI | 2.69 | $4,639.00 | $4,639.00 | $4,639.00 | $4,639.00 | $4,639.00 | $4,639.00 |
| 24 | Channelizing line, 12" (646E10310) | FT | 2,199 | $1.77 | $1.80 | $1.77 | $1.77 | $1.80 | $1.77 |
| 25 | Stop line (646E10400) | FT | 420 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 26 | Crosswalk line, 24" (646E10520) | FT | 1,150 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 27 | Transverse/diagonal line (646E10600) | FT | 181 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 28 | Island marking (646E10800) | SF | 37 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 29 | Lane arrow (646E20300) | EACH | 81 | $159.00 | $159.00 | $159.00 | $159.00 | $159.00 | $159.00 |
| 30 | Dotted line, 6" (646E20504) | FT | 371 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 31 | Bike lane symbol marking (646E20600) | EACH | 1 | $190.00 | $190.00 | $190.00 | $190.00 | $190.00 | $190.00 |
| 32 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $125.00 | $95.00 | $135.00 | $100.00 | $100.00 | $120.00 |
| 33 | Work zone marking sign (614E12460) | EACH | 4 | $150.00 | $85.00 | $85.00 | $85.00 | $85.00 | $100.00 |
| 34 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $150.00 | $734.00 | $400.00 | $100.00 | $285.00 | $600.00 |
| 35 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $950.00 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 36 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 3.41 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 37 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 3.41 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 38 | Work zone center line, class I, 642 paint (614E21100) | MI | 2.69 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 39 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.69 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 40 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.08 | $688.00 | $688.00 | $688.00 | $688.00 | $688.00 | $688.00 |
| 41 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 2,199 | $0.76 | $0.77 | $0.76 | $0.76 | $0.80 | $0.76 |
| 42 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 2,199 | $0.66 | $0.67 | $0.66 | $0.66 | $0.70 | $0.66 |
| 43 | Work zone stop line, class I, 642 paint (614E26200) | FT | 420 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 44 | Work zone stop line, class III, 642 paint (614E26610) | FT | 420 | $3.15 | $3.15 | $3.15 | $3.15 | $3.15 | $3.15 |
| 45 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $3,000.00 | $10,000 | $14,002 | $15,000 | $50,000 |
| 46 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $95,751 | $100,000 | $38,500 | $215,000 | $200,000 |
| 47 | Field office, type B (619E16010) | MNTH | 6 | $1,800.00 | $4,000.00 | $3,000.00 | $500.00 | $4,000.00 | $1,000.00 |
| 48 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,000.00 | $1,600.00 | $2,500.00 | $2,000.00 | $4,000.00 | $3,000.00 |
| 49 | Mobilization (624E10000) | LS | 1 | $40,000 | $81,000 | $100,000 | $4,500.00 | $40,000 | $150,000 |
| 100 | Crack sealing, misc.: approach slab joints (423E98200) | FT | 267 | $4.00 | $50.00 | $50.00 | $7.00 | $50.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.