ODOT contract 260332 bid tabulation
STA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION). Let by Ohio DOT on August 13, 2026, STA. 4 bids received; low bid $7,158,607 by Kenmore Construction Co Inc, -7.9% against the engineer's estimate of $7,773,000.
- Owner
- Ohio DOT
- Letting
- 13 AUG 2026
- Pay items
- 289
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kenmore Construction Co Inc | $7,158,607 | Low | -8.0% |
| 2 | Karvo Companies Inc | $8,247,525 | +15% | +6.0% |
| 3 | Ruhlin Company | $8,808,728 | +23% | +13% |
| 4 | S E T Inc | $10,466,954 | +46% | +35% |
Engineer's estimate: $7,773,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kenmore Construction Co Inc | 2. Karvo Companies Inc | 3. Ruhlin Company | 4. S E T Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100,000 | $74,594 | $85,550 | $180,000 |
| 2 | Headwall removed (202E20010) | EACH | 5 | $500.00 | $1,250.00 | $880.00 | $407.00 |
| 3 | Pavement removed (202E23000) | SY | 10,429 | $15.00 | $13.00 | $15.00 | $16.00 |
| 4 | Wearing course removed (202E23500) | SY | 2 | $300.00 | $5.00 | $100.00 | $525.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 908 | $15.00 | $25.00 | $29.00 | $19.00 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 430 | $25.00 | $35.00 | $61.50 | $88.00 |
| 7 | Guardrail removed (202E38000) | FT | 617 | $2.00 | $2.40 | $5.00 | $21.00 |
| 8 | Mailbox removed, as per plan (202E53101) | EACH | 1 | $100.00 | $75.00 | $500.00 | $106.00 |
| 9 | Catch basin removed (202E58100) | EACH | 5 | $300.00 | $250.00 | $680.00 | $575.00 |
| 10 | Fence removed (202E75000) | FT | 340 | $10.00 | $3.80 | $5.00 | $6.00 |
| 11 | Gate removed (202E75250) | EACH | 1 | $500.00 | $225.00 | $375.00 | $525.00 |
| 12 | Removal misc.:conduit (202E98100) | EACH | 5 | $300.00 | $325.00 | $115.00 | $272.00 |
| 13 | Removal misc.:inspection well (202E98100) | EACH | 1 | $350.00 | $500.00 | $1,630.00 | $1,297.00 |
| 14 | Removal misc.:landscaping rock and timber (202E98300) | SY | 273 | $10.00 | $15.00 | $26.00 | $19.00 |
| 15 | Special - wick drain (203E07504) | FT | 114,830 | $1.00 | $1.75 | $1.50 | $1.00 |
| 16 | Special - piezometer (203E07510) | EACH | 2 | $32,500 | $55,000 | $29,510 | $29,400 |
| 17 | Excavation (203E10000) | CY | 32,417 | $27.00 | $15.00 | $17.00 | $39.00 |
| 18 | Excavation (203E10000) | CY | 68 | $40.00 | $22.00 | $53.50 | $72.00 |
| 19 | Embankment (203E20000) | CY | 9,328 | $15.00 | $5.00 | $11.00 | $18.00 |
| 20 | Embankment, as per plan (203E20001) | CY | 50 | $50.00 | $15.00 | $45.00 | $13.00 |
| 21 | Granular embankment, as per plan (203E35001) | CY | 2,716 | $60.00 | $65.00 | $42.00 | $211.00 |
| 22 | Special - settlement platform (203E65000) | EACH | 3 | $5,000.00 | $10,000 | $1,937.00 | $1,513.00 |
| 23 | Roadway, misc.:removal of excess settled surcharge (203E98000) | CY | 2,552 | $20.00 | $15.00 | $42.50 | $31.00 |
| 24 | Subgrade compaction (204E10000) | SY | 12,857 | $2.00 | $1.50 | $3.50 | $5.00 |
| 25 | Excavation of subgrade (204E13000) | CY | 803 | $20.00 | $25.00 | $50.00 | $33.00 |
| 26 | Granular material, type C (204E30020) | CY | 803 | $65.00 | $75.00 | $110.00 | $112.00 |
| 27 | Proof rolling (204E45000) | HR | 5 | $125.00 | $500.00 | $1,055.00 | $604.00 |
| 28 | Geotextile fabric (204E50000) | SY | 2,408 | $3.00 | $2.00 | $5.00 | $4.00 |
| 29 | Geotextile fabric (204E50000) | SY | 661 | $4.00 | $3.00 | $6.50 | $6.00 |
| 30 | Geogrid (204E51000) | SY | 4,000 | $3.00 | $2.00 | $3.90 | $5.00 |
| 31 | Linear grading (209E60200) | STA | 23 | $125.00 | $500.00 | $460.00 | $925.00 |
| 32 | Guardrail, type MGS (606E15050) | FT | 725 | $21.00 | $21.60 | $24.00 | $26.00 |
| 33 | Guardrail, type MGS, long-span (606E17360) | FT | 50 | $26.50 | $28.40 | $27.50 | $32.00 |
| 34 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,450.00 | $2,680.00 | $2,650.00 | $2,625.00 |
| 35 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,675.00 | $2,745.00 | $2,650.00 | $3,150.00 |
| 36 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,450.00 | $1,380.00 | $1,350.00 | $1,575.00 |
| 37 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,325.00 | $2,520.00 | $2,650.00 | $2,625.00 |
| 38 | Fence removed and rebuilt (607E35000) | FT | 41 | $50.00 | $68.00 | $25.00 | $121.00 |
| 39 | Fence, misc.:steel gate (607E98100) | EACH | 1 | $3,500.00 | $1,625.00 | $1,000.00 | $5,549.00 |
| 40 | Monument assembly, type C (623E38500) | EACH | 7 | $1,200.00 | $1,500.00 | $1,150.00 | $1,337.00 |
| 41 | Special - as-built construction plans (690E98400) | LS | 1 | $5,000.00 | $5,000.00 | $2,870.00 | $15,750 |
| 42 | Special - survey control verification (690E98400) | LS | 1 | $5,000.00 | $15,000 | $2,870.00 | $15,750 |
| 43 | Roadway, misc.:#4 washed landscape gravel (T=4") (203E98000) | CY | 73 | $75.00 | $200.00 | $235.00 | $149.00 |
| 44 | Riprap, type D (601E11000) | SY | 20 | $250.00 | $150.00 | $300.00 | $704.00 |
| 45 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 7 | $120.00 | $250.00 | $290.00 | $189.00 |
| 46 | Dumped rock fill, type C, as per plan (601E27001) | CY | 21 | $170.00 | $250.00 | $250.00 | $182.00 |
| 47 | Dumped rock fill, misc.:stream restoration bedload (601E30000) | TON | 100 | $85.00 | $125.00 | $237.00 | $155.00 |
| 48 | Rock channel protection, type B with filter (601E32100) | CY | 48 | $200.00 | $275.00 | $280.00 | $219.00 |
| 49 | Rock channel protection, type C with filter (601E32200) | CY | 33 | $200.00 | $250.00 | $254.00 | $224.00 |
| 50 | Soil analysis test (659E00100) | EACH | 1 | $50.00 | $25.00 | $25.00 | $267.00 |
| 51 | Topsoil (659E00300) | CY | 3,401 | $20.00 | $15.00 | $18.00 | $62.00 |
| 52 | Seeding and mulching (659E10000) | SY | 16,650 | $0.88 | $1.00 | $1.00 | $1.00 |
| 53 | Seeding and mulching, as per plan (659E10001) | SY | 11,552 | $0.88 | $1.15 | $1.15 | $6.00 |
| 54 | Commercial fertilizer (659E20000) | TON | 3.80 | $850.00 | $250.00 | $250.00 | $788.00 |
| 55 | Lime (659E31000) | ACRE | 5.80 | $0.50 | $25.00 | $25.00 | $210.00 |
| 56 | Water (659E35000) | MGAL | 76 | $10.00 | $1.00 | $1.00 | $11.00 |
| 57 | Sodding staked (660E25000) | SY | 753 | $11.00 | $20.00 | $20.00 | $36.00 |
| 58 | Slope erosion protection, as per plan (670E00501) | SY | 3,712 | $1.85 | $5.25 | $5.25 | $2.00 |
| 59 | Ditch erosion protection (670E00700) | SY | 1,064 | $1.85 | $1.25 | $1.25 | $2.00 |
| 60 | Ditch erosion protection mat, type C (670E00730) | SY | 120 | $1.85 | $2.00 | $2.00 | $4.00 |
| 61 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,800.00 | $22,000 | $4,800.00 | $5,250.00 |
| 62 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $31,680 | $27,500 | $26,965 | $15,750 |
| 63 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $13,200 | $20,000 | $13,200 | $26,696 |
| 64 | Erosion control (832E30000) | EACH | 147,429 | $1.00 | $1.00 | $1.00 | $1.00 |
| 65 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 33 | $1.85 | $5.00 | $5.00 | $6.00 |
| 66 | Seeding and erosion control with turf reinforcing mat, type 3 (836E10030) | SY | 45 | $1.85 | $10.00 | $10.00 | $8.00 |
| 67 | Concrete masonry (602E20000) | CY | 9.20 | $2,000.00 | $2,500.00 | $2,525.00 | $1,962.00 |
| 68 | 6" unclassified pipe underdrains (605E13300) | FT | 400 | $5.00 | $15.00 | $33.50 | $10.00 |
| 69 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 4,897 | $22.00 | $15.00 | $21.50 | $18.00 |
| 70 | Aggregate drains (605E31100) | FT | 30 | $40.00 | $25.00 | $48.50 | $43.00 |
| 71 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 182 | $25.00 | $15.00 | $53.00 | $26.00 |
| 72 | 6" conduit, type F (611E01500) | FT | 10 | $5.00 | $50.00 | $200.00 | $37.00 |
| 73 | 12" conduit, type B (611E04400) | FT | 297 | $102.00 | $95.00 | $125.00 | $172.00 |
| 74 | 12" conduit, type C (611E04600) | FT | 269 | $75.00 | $75.00 | $86.00 | $107.00 |
| 75 | 12" conduit, type D (611E04900) | FT | 87 | $95.00 | $85.00 | $97.00 | $96.00 |
| 76 | 12" conduit, type E (611E05100) | FT | 30 | $6.00 | $110.00 | $76.50 | $101.00 |
| 77 | 12" conduit, type F (611E05200) | FT | 30 | $7.00 | $85.00 | $76.50 | $101.00 |
| 78 | 15" conduit, type B (611E05900) | FT | 488 | $108.00 | $100.00 | $135.00 | $185.00 |
| 79 | 15" conduit, type C (611E06100) | FT | 230 | $87.00 | $85.00 | $110.00 | $113.00 |
| 80 | 18" conduit, type C (611E07600) | FT | 22 | $96.00 | $125.00 | $235.00 | $153.00 |
| 81 | 27" conduit, type B (611E11900) | FT | 236 | $137.00 | $185.00 | $165.00 | $247.00 |
| 82 | 27" conduit, type C (611E12100) | FT | 387 | $126.00 | $175.00 | $178.00 | $166.00 |
| 83 | 30" conduit, type B (611E13400) | FT | 81 | $155.00 | $200.00 | $215.00 | $259.00 |
| 84 | 48" conduit, type B (611E20900) | FT | 374 | $260.00 | $300.00 | $255.00 | $515.00 |
| 85 | 48" conduit, type C (611E21100) | FT | 116 | $210.00 | $250.00 | $315.00 | $323.00 |
| 86 | 66" conduit, type D (611E25404) | FT | 49 | $460.00 | $550.00 | $592.00 | $606.00 |
| 87 | Conduit, misc.:type B for drainage discharge conti (611E97400) | FT | 5 | $15.00 | $25.00 | $376.00 | $91.00 |
| 88 | Conduit, misc.:type C for drainage discharge conti (611E97400) | FT | 5 | $15.00 | $25.00 | $370.00 | $76.00 |
| 89 | Conduit, misc.:type E for drainage discharge conti (611E97400) | FT | 5 | $16.00 | $25.00 | $370.00 | $76.00 |
| 90 | Conduit, misc.:type F for drainage discharge conti (611E97400) | FT | 5 | $17.00 | $25.00 | $370.00 | $76.00 |
| 91 | Catch basin, no. 3 (611E98150) | EACH | 4 | $3,800.00 | $4,500.00 | $6,480.00 | $5,603.00 |
| 92 | Catch basin, no. 3A (611E98180) | EACH | 2 | $3,500.00 | $3,750.00 | $5,945.00 | $4,010.00 |
| 93 | Catch basin, no. 6 (611E98370) | EACH | 1 | $3,500.00 | $3,500.00 | $5,746.00 | $9,930.00 |
| 94 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,300.00 | $2,500.00 | $4,020.00 | $3,145.00 |
| 95 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 1 | $3,000.00 | $2,500.00 | $4,020.00 | $3,743.00 |
| 96 | Catch basin, no. 2-3 (611E98510) | EACH | 4 | $2,700.00 | $3,000.00 | $4,190.00 | $3,595.00 |
| 97 | Catch basin, no. 2-6 (611E98600) | EACH | 1 | $4,700.00 | $5,000.00 | $7,555.00 | $9,874.00 |
| 98 | Manhole, no. 3 (611E99574) | EACH | 4 | $3,500.00 | $4,500.00 | $9,450.00 | $4,564.00 |
| 99 | Manhole, no. 3 (611E99574) | EACH | 1 | $7,200.00 | $10,000 | $19,757 | $8,524.00 |
| 100 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $350.00 | $125.00 | $718.00 | $667.00 |
| 101 | Inspection well (611E99720) | EACH | 1 | $1,500.00 | $1,500.00 | $2,932.00 | $989.00 |
| 102 | Partial depth pavement repair (441) (251E01000) | SY | 2,220 | $35.00 | $32.00 | $27.00 | $21.00 |
| 103 | Pavement repair (253E01000) | SY | 1,720 | $85.00 | $75.00 | $60.00 | $63.00 |
| 104 | Pavement planing, asphalt concrete(T=3") (254E01000) | SY | 3,335 | $4.00 | $5.00 | $7.00 | $2.00 |
| 105 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,706 | $150.00 | $215.00 | $242.00 | $158.00 |
| 106 | Aggregate base (304E20000) | CY | 2,284 | $68.00 | $100.00 | $105.00 | $125.00 |
| 107 | Aggregate base (304E20000) | CY | 68 | $75.00 | $25.00 | $132.00 | $129.00 |
| 108 | Tack coat, 702.13 (407E13900) | GAL | 8 | $6.00 | $3.00 | $25.00 | $21.00 |
| 109 | Non-tracking tack coat (407E20000) | GAL | 2,947 | $6.00 | $3.00 | $3.00 | $2.00 |
| 110 | Prime coat, as per plan (408E10001) | GAL | 991 | $6.00 | $5.00 | $5.80 | $4.00 |
| 111 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 373 | $235.00 | $300.00 | $310.00 | $250.00 |
| 112 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 1 | $800.00 | $500.00 | $600.00 | $788.00 |
| 113 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 115 | $285.00 | $285.00 | $510.00 | $299.00 |
| 114 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 165 | $275.00 | $225.00 | $260.00 | $226.00 |
| 115 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 13 | $420.00 | $500.00 | $910.00 | $515.00 |
| 116 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 317 | $255.00 | $325.00 | $385.00 | $299.00 |
| 117 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 504 | $230.00 | $300.00 | $401.00 | $299.00 |
| 118 | 4" non-reinforced concrete pavement, class QC 1P, as per plan (452E09011) | SY | 700 | $82.00 | $75.00 | $92.00 | $93.00 |
| 119 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 97 | $115.00 | $75.00 | $95.00 | $89.00 |
| 120 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 89 | $75.00 | $85.00 | $125.00 | $107.00 |
| 121 | 8" non-reinforced concrete pavement, class QC 1P, as per plan (452E12011) | SY | 750 | $98.00 | $90.00 | $150.00 | $136.00 |
| 122 | Combination curb and gutter, type 2 (609E12000) | FT | 949 | $40.00 | $35.00 | $104.00 | $50.00 |
| 123 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 478 | $46.00 | $30.00 | $81.00 | $63.00 |
| 124 | Curb, type 4-C (609E24510) | FT | 1,160 | $32.00 | $28.00 | $60.00 | $34.00 |
| 125 | Curb, type 6 (609E26000) | FT | 718 | $34.00 | $25.00 | $65.00 | $53.00 |
| 126 | Curb, type 10, as per plan (609E33001) | FT | 358 | $38.00 | $25.00 | $117.00 | $56.00 |
| 127 | Compacted aggregate, as per plan (617E10101) | CY | 142 | $30.00 | $100.00 | $100.00 | $76.00 |
| 128 | Pavement planing, asphalt concrete, class A, (T=1" (897E01010) | SY | 12,339 | $1.40 | $2.00 | $3.00 | $2.00 |
| 129 | Connection, fused pull apart (625E00450) | EACH | 12 | $130.00 | $130.00 | $205.00 | $144.00 |
| 130 | Connection, unfused pull apart (625E00460) | EACH | 6 | $130.00 | $130.00 | $192.50 | $139.00 |
| 131 | Connection, unfused permanent (625E00480) | EACH | 15 | $110.00 | $110.00 | $153.00 | $82.00 |
| 132 | Light pole, conventional, AT08B30 (625E10490) | EACH | 6 | $3,000.00 | $3,000.00 | $3,375.00 | $3,729.00 |
| 133 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 6 | $1,750.00 | $1,750.00 | $1,485.00 | $1,730.00 |
| 134 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 747 | $7.00 | $7.00 | $5.50 | $5.00 |
| 135 | No. 10 AWG pole and bracket cable (625E23400) | FT | 684 | $2.00 | $2.00 | $2.25 | $2.00 |
| 136 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 825 | $20.00 | $20.00 | $23.25 | $19.00 |
| 137 | Conduit, 3", 725.04 (625E25500) | FT | 204 | $28.00 | $28.00 | $44.00 | $43.00 |
| 138 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 6 | $450.00 | $450.00 | $387.00 | $662.00 |
| 139 | Trench, as per plan (625E29001) | FT | 131 | $9.00 | $9.00 | $25.50 | $18.00 |
| 140 | Trench, 24" deep (625E29002) | FT | 818 | $8.00 | $8.00 | $11.00 | $21.00 |
| 141 | Pull box, 725.08, 24" (625E30706) | EACH | 6 | $950.00 | $950.00 | $1,515.00 | $1,062.00 |
| 142 | Ground rod (625E32000) | EACH | 6 | $185.00 | $185.00 | $270.00 | $262.00 |
| 143 | Power service, as per plan (625E34001) | EACH | 1 | $3,276.00 | $3,276.00 | $8,355.00 | $4,118.00 |
| 144 | Control center cabinet, complete (625E34450) | EACH | 1 | $3,500.00 | $3,500.00 | $4,665.00 | $8,840.00 |
| 145 | Underground warning/marking tape, as per plan (625E36011) | FT | 949 | $2.00 | $2.00 | $1.00 | $1.00 |
| 146 | Arc flash calculations and label(SR-241/shuffel ST (625E76000) | EACH | 1 | $3,500.00 | $3,500.00 | $1,350.00 | $1,260.00 |
| 147 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 3 | $100.00 | $100.00 | $100.00 | $105.00 |
| 148 | RPM (621E00100) | EACH | 131 | $59.00 | $59.00 | $59.00 | $62.00 |
| 149 | Ground mounted support, no. 2 post (630E02100) | FT | 106.50 | $12.50 | $12.50 | $12.50 | $13.00 |
| 150 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 477.80 | $13.00 | $13.00 | $13.00 | $14.00 |
| 151 | Sign post reflector (630E08600) | EACH | 25 | $37.50 | $37.50 | $37.50 | $39.00 |
| 152 | Sign, flat sheet (630E80100) | SF | 198.70 | $22.50 | $22.50 | $22.50 | $24.00 |
| 153 | Sign, flat sheet, as per plan (630E80101) | SF | 28.90 | $22.50 | $22.50 | $22.50 | $24.00 |
| 154 | Removal of ground mounted sign and disposal (630E84900) | EACH | 29 | $15.00 | $15.00 | $15.00 | $16.00 |
| 155 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $150.00 | $150.00 | $150.00 | $158.00 |
| 156 | Removal of ground mounted post support and disposal (630E86002) | EACH | 21 | $15.00 | $15.00 | $15.00 | $16.00 |
| 157 | Signing, misc.:12" PVC pipe (630E97700) | EACH | 9 | $200.00 | $417.19 | $140.00 | $263.00 |
| 158 | Edge line, 4" (646E10000) | MI | 4 | $2,785.90 | $2,785.00 | $2,785.00 | $2,924.00 |
| 159 | Edge line, 6" (646E10010) | MI | 2.42 | $3,590.00 | $3,590.00 | $3,590.00 | $3,769.00 |
| 160 | Center line (646E10200) | MI | 2.95 | $4,500.00 | $4,500.00 | $4,500.00 | $4,725.00 |
| 161 | Stop line (646E10400) | FT | 100 | $14.00 | $14.00 | $14.00 | $15.00 |
| 162 | Pavement marking, misc.:yield line marking (646E98000) | EACH | 37 | $45.00 | $45.00 | $45.00 | $47.00 |
| 163 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $3,300.00 | $3,300.00 | $3,667.00 | $4,861.00 |
| 164 | Planting, misc.:live stakes (661E99900) | EACH | 2,380 | $3.86 | $6.95 | $6.95 | $26.00 |
| 165 | Structure removed (202E11000) | LS | 1 | $40,000 | $45,800 | $15,740 | $41,308 |
| 166 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $140,000 | $268,000 | $504,515 | $375,147 |
| 167 | Unclassified excavation (503E21100) | CY | 245 | $55.00 | $165.00 | $213.00 | $112.00 |
| 168 | Pile driving equipment mobilization (505E11100) | LS | 1 | $20,000 | $58,000 | $22,910 | $87,907 |
| 169 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 1,980 | $36.00 | $9.00 | $18.00 | $57.00 |
| 170 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 2,145 | $68.00 | $52.00 | $70.00 | $63.00 |
| 171 | Epoxy coated steel reinforcement (509E10000) | LB | 18,090 | $1.70 | $1.60 | $1.85 | $1.00 |
| 172 | Class QC2 concrete, superstructure (511E31610) | CY | 29 | $1,920.00 | $2,200.00 | $1,573.00 | $2,478.00 |
| 173 | Class QC1 concrete, abutment including footing (511E43510) | CY | 130 | $650.00 | $950.00 | $946.00 | $1,284.00 |
| 174 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 112 | $65.00 | $48.00 | $45.00 | $36.00 |
| 175 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 9 | $17,000 | $14,000 | $16,088 | $20,637 |
| 176 | 2" preformed expansion joint filler (516E13900) | SF | 26 | $25.00 | $14.00 | $14.00 | $17.00 |
| 177 | Nylon reinforced neoprene sheeting (516E25000) | SF | 216 | $30.00 | $12.00 | $17.50 | $21.00 |
| 178 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 18 | $355.00 | $76.00 | $61.00 | $116.00 |
| 179 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44001) | EACH | 36 | $500.00 | $575.00 | $1,030.00 | $817.00 |
| 180 | Railing (three steel tube bridge railing) (517E70100) | FT | 84 | $507.00 | $485.00 | $445.00 | $536.00 |
| 181 | Porous backfill with geotextile fabric (518E21200) | CY | 84 | $100.00 | $155.00 | $138.00 | $304.00 |
| 182 | Special - steel drip strip (518E22300) | FT | 68 | $50.00 | $28.00 | $31.00 | $35.00 |
| 183 | 6" perforated corrugated plastic pipe (518E40000) | FT | 133 | $30.00 | $14.00 | $28.00 | $12.00 |
| 184 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 36 | $30.00 | $18.00 | $31.00 | $35.00 |
| 185 | Dynamic load testing, as per plan (523E20001) | EACH | 1 | $5,000.00 | $14,000 | $5,100.00 | $13,348 |
| 186 | Restrike, as per plan (523E20501) | EACH | 1 | $7,000.00 | $10,000 | $5,100.00 | $6,602.00 |
| 187 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 160 | $530.00 | $365.00 | $463.00 | $448.00 |
| 188 | Type B installation (526E90020) | SY | 40 | $120.00 | $140.00 | $209.00 | $525.00 |
| 189 | Rock channel protection, type C with aggregate filter (601E32210) | CY | 89 | $220.00 | $155.00 | $193.00 | $234.00 |
| 190 | Structure grounding system (625E33000) | EACH | 1 | $15,000 | $26,500 | $6,520.00 | $15,821 |
| 191 | Special - work zone traffic signal (614E11300) | EACH | 4 | $3,000.00 | $3,000.00 | $2,910.00 | $6,669.00 |
| 192 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,250.00 | $2,250.00 | $2,400.00 | $2,625.00 |
| 193 | Detour signing (614E12420) | LS | 1 | $50,000 | $35,000 | $50,468 | $36,750 |
| 194 | Work zone marking sign (614E12460) | EACH | 12 | $80.00 | $80.00 | $115.36 | $84.00 |
| 195 | Maintaining traffic, misc.:video recording and doc (614E18002) | LS | 1 | $6,500.00 | $1,225.00 | $4,500.00 | $2,625.00 |
| 196 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $950.00 | $850.00 | $1,225.00 | $2,220.00 |
| 197 | Work zone center line, class I (614E21000) | MI | 0.06 | $17,500 | $17,500 | $2,500.00 | $3,150.00 |
| 198 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.50 | $1,100.00 | $1,100.00 | $1,100.00 | $1,155.00 |
| 199 | Work zone edge line, class I, 4" (614E22000) | MI | 0.53 | $6,750.00 | $6,750.00 | $1,285.00 | $1,575.00 |
| 200 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 9 | $690.00 | $690.00 | $690.00 | $725.00 |
| 201 | Work zone stop line, class I (614E26000) | FT | 50 | $10.00 | $10.00 | $3.25 | $5.00 |
| 202 | Work zone stop line, class III, 642 paint (614E26610) | FT | 200 | $3.25 | $3.25 | $3.25 | $3.00 |
| 203 | Work zone pavement marking, misc.:yield line (614E98100) | FT | 29 | $5.00 | $12.55 | $50.00 | $5.00 |
| 204 | Roads for maintaining traffic (615E10000) | LS | 1 | $5,000.00 | $50,000 | $44,925 | $38,871 |
| 205 | Pavement for maintaining traffic, class A (615E20000) | SY | 410 | $95.00 | $75.00 | $141.00 | $116.00 |
| 206 | Water (616E10000) | MGAL | 11 | $10.00 | $100.00 | $74.00 | $952.00 |
| 207 | Portable barrier, unanchored (622E41100) | FT | 604 | $20.00 | $50.00 | $20.00 | $108.00 |
| 208 | Wearing course removed (202E23500) | SY | 147 | $8.00 | $8.00 | $20.00 | $5.00 |
| 209 | Removal misc.: barrier reflector (202E98100) | EACH | 24 | $5.00 | $5.00 | $94.00 | $62.00 |
| 210 | Excavation (203E10000) | CY | 14 | $20.00 | $25.00 | $260.00 | $127.00 |
| 211 | Linear grading (209E60200) | STA | 203 | $150.00 | $75.00 | $391.00 | $62.00 |
| 212 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 5 | $2,200.00 | $1,500.00 | $395.00 | $2,409.00 |
| 213 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $1,500.00 | $2,870.00 | $5,250.00 |
| 214 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 215 | Catch basin adjusted to grade (611E98630) | EACH | 5 | $400.00 | $1,000.00 | $890.00 | $1,915.00 |
| 216 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $2,600.00 | $2,000.00 | $890.00 | $2,310.00 |
| 217 | Special - miscellaneous metal (611E99820) | LB | 400 | $3.00 | $3.00 | $8.25 | $6.00 |
| 218 | Partial depth pavement repair (441) (251E01000) | SY | 750 | $40.00 | $45.00 | $27.00 | $21.00 |
| 219 | Partial depth pavement repair (441) (251E01000) | SY | 100 | $50.00 | $100.00 | $90.00 | $77.00 |
| 220 | Aggregate base (304E20000) | CY | 14 | $50.00 | $25.00 | $132.00 | $212.00 |
| 221 | Non-tracking tack coat (407E20000) | GAL | 4,059 | $6.00 | $3.00 | $3.00 | $2.00 |
| 222 | Prime coat (408E10000) | GAL | 1,653 | $6.00 | $5.00 | $5.80 | $4.00 |
| 223 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 1,406 | $246.00 | $300.00 | $310.00 | $250.00 |
| 224 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 5 | $480.00 | $500.00 | $910.00 | $515.00 |
| 225 | Compacted aggregate (617E10100) | CY | 115 | $40.00 | $100.00 | $100.00 | $76.00 |
| 226 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 50,583 | $1.40 | $2.50 | $3.00 | $2.00 |
| 227 | Valve box adjusted to grade (638E10800) | EACH | 5 | $350.00 | $558.13 | $335.00 | $1,890.00 |
| 228 | RPM (621E00100) | EACH | 309 | $49.00 | $49.00 | $49.00 | $51.00 |
| 229 | Raised pavement marker removed (621E54000) | EACH | 249 | $6.00 | $1.00 | $6.00 | $20.00 |
| 230 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 30 | $12.00 | $22.50 | $12.50 | $24.00 |
| 231 | Ground mounted support, no. 2 post (630E02100) | FT | 30 | $20.00 | $20.00 | $20.00 | $21.00 |
| 232 | Sign, flat sheet (630E80100) | SF | 4 | $75.00 | $75.00 | $75.00 | $79.00 |
| 233 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $15.00 | $15.00 | $15.00 | $16.00 |
| 234 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $15.00 | $15.00 | $15.00 | $16.00 |
| 235 | Edge line, 6" (646E10010) | MI | 4.42 | $3,590.00 | $3,590.00 | $3,590.00 | $3,769.00 |
| 236 | Lane line, 6" (646E10110) | MI | 0.47 | $2,250.00 | $2,250.00 | $2,250.00 | $2,362.00 |
| 237 | Center line (646E10200) | MI | 2.41 | $4,500.00 | $4,500.00 | $4,500.00 | $4,725.00 |
| 238 | Channelizing line, 8" (646E10300) | FT | 490 | $1.75 | $1.75 | $1.75 | $2.00 |
| 239 | Channelizing line, 12" (646E10310) | FT | 760 | $1.95 | $1.95 | $1.95 | $2.00 |
| 240 | Stop line (646E10400) | FT | 100 | $14.00 | $14.00 | $14.00 | $15.00 |
| 241 | Island marking (646E10800) | SF | 57 | $10.00 | $10.00 | $10.00 | $11.00 |
| 242 | Lane arrow (646E20300) | EACH | 20 | $169.00 | $169.00 | $169.00 | $177.00 |
| 243 | Lane reduction arrow (646E20350) | EACH | 4 | $325.00 | $325.00 | $325.00 | $341.00 |
| 244 | Dotted line, 6" (646E20504) | FT | 1,380 | $2.50 | $2.50 | $2.50 | $3.00 |
| 245 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $9,700.00 | $9,700.00 | $12,265 | $12,209 |
| 246 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $9,400.00 | $9,400.00 | $11,870 | $11,794 |
| 247 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $4,000.00 | $10,000 | $5,122.00 | $9,377.00 |
| 248 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $6,000.00 | $26,400 | $5,122.00 | $9,377.00 |
| 249 | Special - structures: repair of deteriorated surfa (530E00600) | SF | 650 | $130.00 | $46.15 | $135.40 | $126.00 |
| 250 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $4,000.00 | $10,000 | $5,122.00 | $9,377.00 |
| 251 | Wearing course removed (202E23500) | SY | 240 | $10.00 | $5.00 | $40.00 | $5.00 |
| 252 | Guardrail removed (202E38000) | FT | 160 | $2.00 | $3.00 | $4.50 | $21.00 |
| 253 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $6,000.00 | $26,400 | $5,215.00 | $9,377.00 |
| 254 | Non-tracking tack coat (407E20000) | GAL | 34 | $6.00 | $3.00 | $3.00 | $5.00 |
| 255 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 60 | $4.00 | $40.00 | $125.00 | $131.00 |
| 256 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 7 | $300.00 | $300.00 | $1,180.00 | $250.00 |
| 257 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 14 | $300.00 | $1,000.00 | $310.00 | $294.00 |
| 258 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 120 | $50.00 | $45.00 | $45.00 | $41.00 |
| 259 | Type 3 waterproofing (512E33010) | SY | 240 | $30.00 | $68.00 | $75.00 | $215.00 |
| 260 | Special - steel drip strip (518E22300) | FT | 24 | $40.00 | $24.00 | $125.00 | $38.00 |
| 261 | Patching concrete bridge deck - type C (519E12304) | SY | 10 | $1,500.00 | $1,220.00 | $500.00 | $803.00 |
| 262 | Special - structures: concrete spall removal with (530E00800) | SY | 10 | $1,500.00 | $1,300.00 | $1,500.00 | $237.00 |
| 263 | Rock channel protection, type C with filter (601E32200) | CY | 5 | $300.00 | $300.00 | $340.00 | $501.00 |
| 264 | Anchor assembly, type B (606E26000) | EACH | 1 | $2,450.00 | $2,640.00 | $2,650.00 | $2,625.00 |
| 265 | Anchor assembly, type E (606E26100) | EACH | 1 | $2,675.00 | $2,580.00 | $2,650.00 | $3,150.00 |
| 266 | Bridge terminal assembly, type 4 (606E35140) | EACH | 2 | $1,100.00 | $1,150.00 | $1,000.00 | $1,260.00 |
| 267 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 4 | $12.00 | $14.00 | $12.50 | $21.00 |
| 268 | Patching concrete structures with trowelable mortar, as per plan (843E50001) | SF | 90 | $225.00 | $190.00 | $225.00 | $247.00 |
| 269 | Galvanic anode protection (844E20000) | EACH | 360 | $65.00 | $100.00 | $96.00 | $39.00 |
| 270 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $110.00 | $140.00 | $90.00 | $95.00 |
| 271 | Work zone marking sign (614E12460) | EACH | 25 | $80.00 | $80.00 | $115.35 | $84.00 |
| 272 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $200.00 | $300.00 | $744.00 | $292.00 |
| 273 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $850.00 | $1,225.00 | $2,220.00 |
| 274 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 0.47 | $600.00 | $600.00 | $600.00 | $630.00 |
| 275 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 0.47 | $600.00 | $600.00 | $600.00 | $630.00 |
| 276 | Work zone center line, class I, 642 paint (614E21100) | MI | 2.41 | $1,200.00 | $1,200.00 | $1,200.00 | $1,260.00 |
| 277 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.41 | $1,100.00 | $1,100.00 | $1,100.00 | $1,155.00 |
| 278 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 4.42 | $690.00 | $690.00 | $690.00 | $725.00 |
| 279 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 1,250 | $0.88 | $0.88 | $0.88 | $1.00 |
| 280 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 1,250 | $0.85 | $0.85 | $0.85 | $1.00 |
| 281 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 1,380 | $0.76 | $0.76 | $0.76 | $1.00 |
| 282 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 1,380 | $0.75 | $0.75 | $0.75 | $1.00 |
| 283 | Work zone stop line, class I, 642 paint (614E26200) | FT | 100 | $3.30 | $3.30 | $3.30 | $3.00 |
| 284 | Work zone stop line, class III, 642 paint (614E26610) | FT | 100 | $3.20 | $3.20 | $3.20 | $3.00 |
| 285 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $80,000 | $75,000 | $81,630 | $82,756 |
| 286 | Maintaining traffic (614E11000) | LS | 1 | $110,000 | $250,000 | $105,633 | $285,000 |
| 287 | Field office, type C (619E16020) | MNTH | 12 | $3,000.00 | $3,500.00 | $3,380.00 | $4,133.00 |
| 288 | Construction layout stakes and surveying (623E10000) | LS | 1 | $44,000 | $250,000 | $89,360 | $115,500 |
| 289 | Mobilization (624E10000) | LS | 1 | $300,000 | $750,000 | $440,000 | $700,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.