ODOT contract 250019 bid tabulation
MEG-US 33-(07.61)(07.87) (SLIDE REPAIR). Let by Ohio DOT on January 16, 2025, MEG. 6 bids received; low bid $699,083 by Allard Excavation LLC, -19% against the engineer's estimate of $865,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 27
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allard Excavation LLC | $699,083 | Low | -19% |
| 2 | D G M Inc | $832,425 | +19% | -4.0% |
| 3 | Alan Stone Co Inc | $896,957 | +28% | +4.0% |
| 4 | Cast & Baker Corporation | $952,304 | +36% | +10% |
| 5 | Axis Civil Construction LLC | $1,016,221 | +45% | +17% |
| 6 | R C Construction Company and Son Inc | $1,277,814 | +83% | +48% |
Engineer's estimate: $865,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allard Excavation LLC | 2. D G M Inc | 3. Alan Stone Co Inc | 4. Cast & Baker Corporation | 5. Axis Civil Construction LLC | 6. R C Construction Company and Son Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $153,150 | $35,000 | $60,000 | $50,000 | $75,000 | $100,000 |
| 2 | Excavation (203E10000) | CY | 23,042 | $12.00 | $24.00 | $26.50 | $26.00 | $29.90 | $32.00 |
| 3 | Roadway, misc.: hydrologist (203E98600) | EACH | 8 | $1,875.00 | $1,750.00 | $2,500.00 | $1,650.00 | $2,500.00 | $2,000.00 |
| 4 | Pre-blast condition survey (208E10000) | LS | 1 | $813.00 | $1,250.00 | $2,000.00 | $2,625.00 | $500.00 | $7,000.00 |
| 5 | Blasting consultant (208E12000) | LS | 1 | $6,875.00 | $5,000.00 | $5,400.00 | $3,300.00 | $2,000.00 | $7,000.00 |
| 6 | Air blast and noise control (208E13000) | LS | 1 | $1,625.00 | $2,000.00 | $5,100.00 | $2,200.00 | $2,000.00 | $4,500.00 |
| 7 | Vibration control and monitoring (208E14000) | LS | 1 | $1,625.00 | $2,300.00 | $5,100.00 | $2,400.00 | $3,750.00 | $3,500.00 |
| 8 | Presplitting (208E15000) | SY | 1,406 | $36.00 | $30.00 | $25.00 | $22.00 | $24.00 | $25.00 |
| 9 | Seeding and mulching (659E10000) | SY | 11,752 | $2.00 | $1.25 | $1.00 | $1.40 | $0.92 | $5.00 |
| 10 | Commercial fertilizer (659E20000) | TON | 1.59 | $500.00 | $1,500.00 | $1,400.00 | $1,375.00 | $1,500.00 | $2,000.00 |
| 11 | Lime (659E31000) | ACRE | 2.43 | $500.00 | $300.00 | $820.00 | $165.00 | $200.00 | $1,900.00 |
| 12 | Water (659E35000) | MGAL | 63 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 13 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $85.00 | $60.00 | $100.00 | $110.00 | $75.00 | $75.00 |
| 15 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $1,800.00 | $2,200.00 | $2,300.00 | $3,500.00 | $2,200.00 | $2,500.00 |
| 16 | Speed zone ahead symbol sign (614E12410) | EACH | 2 | $125.00 | $125.00 | $100.00 | $100.00 | $100.00 | $125.00 |
| 17 | Resume legal speed sign (614E12490) | EACH | 2 | $125.00 | $125.00 | $100.00 | $100.00 | $100.00 | $125.00 |
| 18 | Barrier reflector, type 1, 1 way (614E13310) | EACH | 32 | $35.00 | $30.00 | $30.00 | $31.00 | $30.00 | $50.00 |
| 19 | Object marker, one way (614E13350) | EACH | 32 | $40.00 | $35.00 | $30.00 | $35.00 | $25.00 | $50.00 |
| 20 | Portable changeable message sign (614E18600) | SNMT | 12 | $1,650.00 | $1,000.00 | $1,600.00 | $1,100.00 | $1,650.00 | $1,800.00 |
| 21 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.13 | $13,125 | $11,000 | $10,000 | $26,000 | $10,500 | $25,000 |
| 22 | Portable barrier, unanchored (622E41100) | FT | 1,550 | $31.00 | $27.00 | $20.00 | $60.00 | $32.00 | $25.00 |
| 23 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 6 | $1,250.00 | $600.00 | $990.00 | $1,100.00 | $1,000.00 | $1,200.00 |
| 24 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,750.00 | $30,000 | $5,600.00 | $10,000 | $12,000 | $65,000 |
| 25 | Maintaining traffic (614E11000) | LS | 1 | $17,463 | $35,000 | $11,000 | $22,000 | $20,000 | $40,000 |
| 26 | Construction layout stakes and surveying (623E10000) | LS | 1 | $14,375 | $8,000.00 | $26,000 | $15,000 | $15,000 | $45,000 |
| 27 | Mobilization (624E10000) | LS | 1 | $39,794 | $15,000 | $24,000 | $50,000 | $40,000 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.