ODOT contract 254009 bid tabulation
LAK-SR 84-30.86 Replace (CULVERT REPLACEMENT). Let by Ohio DOT on February 27, 2025, LAK. 4 bids received; low bid $585,274 by Bog Construction Inc, -7.1% against the engineer's estimate of $630,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 61
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bog Construction Inc | $585,274 | Low | -7.0% |
| 2 | Ed Wilson Services LLC | $549,606 | -6.0% | -13% |
| 3 | Shook Company LLC | $647,000 | +11% | +3.0% |
| 4 | Madex Construction Co | $946,336 | +62% | +50% |
Engineer's estimate: $630,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bog Construction Inc | 2. Ed Wilson Services LLC | 3. Shook Company LLC | 4. Madex Construction Co |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 | $5,000.00 | $10,000 | $7,562.53 |
| 2 | Pavement removed (202E23000) | SY | 780 | $16.00 | $20.00 | $16.00 | $41.01 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 31 | $40.00 | $50.00 | $45.50 | $107.04 |
| 4 | Guardrail removed (202E38000) | FT | 375 | $3.00 | $4.00 | $2.00 | $10.08 |
| 5 | Removal misc.: removal of abandoned gas line (202E98200) | FT | 176 | $10.00 | $10.00 | $20.00 | $23.40 |
| 6 | Excavation (203E10000) | CY | 174 | $35.00 | $25.00 | $60.50 | $68.05 |
| 7 | Embankment (203E20000) | CY | 243 | $35.00 | $30.00 | $66.50 | $84.27 |
| 8 | Subgrade compaction (204E10000) | SY | 617 | $6.00 | $3.00 | $3.50 | $5.19 |
| 9 | Excavation of subgrade (204E13000) | CY | 162 | $10.00 | $30.00 | $62.00 | $78.02 |
| 10 | Granular material, type B (204E30010) | CY | 162 | $10.00 | $90.00 | $70.00 | $148.35 |
| 11 | Proof rolling (204E45000) | HR | 0.30 | $100.00 | $200.00 | $100.00 | $1,254.33 |
| 12 | Reshaping under guardrail, as per plan (209E15001) | STA | 4 | $125.00 | $300.00 | $75.00 | $800.58 |
| 13 | Guardrail, type MGS with long posts (606E15100) | FT | 350 | $27.00 | $50.00 | $40.00 | $34.16 |
| 14 | Guardrail, type MGS, long-span (606E17360) | FT | 25 | $38.00 | $50.00 | $50.00 | $44.00 |
| 15 | Right-of-way monument, type B (623E40520) | EACH | 2 | $750.00 | $2,500.00 | $500.00 | $3,048.53 |
| 16 | Soil analysis test (659E00100) | EACH | 1 | $100.00 | $150.00 | $50.00 | $289.47 |
| 17 | Topsoil (659E00300) | CY | 66 | $40.00 | $50.00 | $65.00 | $106.41 |
| 18 | Seeding and mulching, class 1 (659E00500) | SY | 299 | $12.00 | $2.50 | $6.50 | $9.68 |
| 19 | Repair seeding and mulching (659E14000) | SY | 30 | $2.00 | $1.00 | $0.20 | $5.02 |
| 20 | Inter-seeding (659E15000) | SY | 30 | $1.00 | $1.00 | $0.20 | $2.51 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.14 | $1,000.00 | $800.00 | $650.00 | $1,075.71 |
| 22 | Lime (659E31000) | ACRE | 0.13 | $100.00 | $150.00 | $75.00 | $631.38 |
| 23 | Water (659E35000) | MGAL | 2 | $1.00 | $1.00 | $0.10 | $75.26 |
| 24 | Erosion control (832E30000) | EACH | 1,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Aggregate drains (605E31100) | FT | 67 | $18.00 | $20.00 | $33.50 | $166.21 |
| 26 | 12" conduit, type C (611E04600) | FT | 25 | $100.00 | $60.00 | $148.50 | $242.22 |
| 27 | Manhole adjusted to grade (611E99654) | EACH | 1 | $500.00 | $1,000.00 | $1,200.00 | $1,505.20 |
| 28 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 130 | $350.00 | $250.00 | $230.00 | $376.32 |
| 29 | Aggregate base (304E20000) | CY | 102 | $125.00 | $90.00 | $128.00 | $155.43 |
| 30 | Tack coat (407E10000) | GAL | 94 | $10.00 | $4.00 | $3.00 | $5.79 |
| 31 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 48 | $510.00 | $500.00 | $300.00 | $550.00 |
| 32 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 14 | $950.00 | $500.00 | $300.00 | $1,013.16 |
| 33 | RPM (621E00100) | EACH | 2 | $1,650.00 | $900.00 | $650.00 | $1,852.63 |
| 34 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 4 | $25.00 | $15.00 | $10.00 | $17.37 |
| 35 | Ground mounted support, no. 3 post (630E03100) | FT | 13 | $90.00 | $35.00 | $50.00 | $98.42 |
| 36 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $400.00 | $310.00 | $50.00 | $347.37 |
| 37 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $100.00 | $310.00 | $50.00 | $57.89 |
| 38 | Edge line, 6" (646E10010) | MI | 0.08 | $28,000 | $45,000 | $39,000 | $34,737 |
| 39 | Center line (646E10200) | MI | 0.04 | $35,000 | $57,000 | $66,700 | $40,526 |
| 40 | Detour signing (614E12420) | LS | 1 | $11,000 | $7,800.00 | $10,000 | $11,579 |
| 41 | Structure removed, as per plan (202E11001) | LS | 1 | $100,000 | $5,000.00 | $60,000 | $37,780 |
| 42 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $5,500.00 | $15,000 | $34,000 | $71,893 |
| 43 | Unclassified excavation (503E21100) | CY | 648 | $30.00 | $25.00 | $30.00 | $63.67 |
| 44 | Epoxy coated steel reinforcement (509E10000) | LB | 7,269 | $2.00 | $2.50 | $2.10 | $4.46 |
| 45 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 30 | $800.00 | $1,500.00 | $1,750.00 | $2,862.71 |
| 46 | Class QC1 concrete, footing (511E46510) | CY | 52 | $550.00 | $500.00 | $1,000.00 | $1,328.83 |
| 47 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,500.00 | $1,500.00 | $2,400.00 | $2,084.21 |
| 48 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 87 | $38.00 | $30.00 | $56.00 | $86.93 |
| 49 | Type 2 waterproofing (512E33000) | SY | 219 | $31.00 | $35.00 | $31.00 | $70.70 |
| 50 | Type A waterproofing (512E33300) | SY | 57 | $32.00 | $35.00 | $31.00 | $91.41 |
| 51 | 1" preformed expansion joint filler (516E13600) | SF | 63 | $10.00 | $15.00 | $18.00 | $22.06 |
| 52 | Porous backfill with geotextile fabric (518E21200) | CY | 24 | $145.00 | $125.00 | $130.00 | $292.24 |
| 53 | Rock channel protection, type B with filter (601E32100) | CY | 47 | $115.00 | $175.00 | $137.00 | $333.36 |
| 54 | 9' X 9' conduit, type A, 706.05, as per plan (611E94947) | FT | 60 | $1,250.00 | $1,900.00 | $1,600.00 | $1,712.17 |
| 55 | Low strength mortar backfill (type 1) (613E41250) | CY | 235 | $165.00 | $160.00 | $147.00 | $256.79 |
| 56 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $15,000 | $12,535 | $23,158 |
| 57 | Maintaining traffic (614E11000) | LS | 1 | $5,500.00 | $5,000.00 | $18,000 | $5,789.47 |
| 58 | Field office, type B, as per plan (619E16011) | MNTH | 3 | $500.00 | $2,000.00 | $2,250.00 | $964.71 |
| 59 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $10,000 | $5,000.00 | $8,684.21 |
| 60 | Mobilization (624E10000) | LS | 1 | $25,000 | $25,000 | $20,000 | $40,502 |
| 100 | Seeding and mulching, class 6 (659E00590) | SY | 288 | $12.00 | $5.00 | $8.00 | $11.66 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.