B & G Trucking & Construction Inc: ODOT bid record
B & G Trucking & Construction Inc submitted 16 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 30 JUL 2026, and was the low bidder on 11 of them (69%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $13,622,043
- Latest bid
- 30 JUL 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 3 | 100% |
| 2021 | 1 | 1 | 100% |
| 2022 | 1 | 1 | 100% |
| 2023 | 2 | 0 | 0% |
| 2024 | 5 | 2 | 40% |
| 2025 | 2 | 2 | 100% |
| 2026 | 2 | 2 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 8 | 7 | 88% |
| TRU | 2 | 2 | 100% |
| POR | 1 | 1 | 100% |
| STA | 1 | 1 | 100% |
| COS | 1 | 0 | 0% |
| JEF | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 201 | 140 (70%) | $9.00 | $11.00 |
| Removal of existing pavement marking | 512E74500 | FT | 74 | 54 (73%) | $2.50 | $3.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 23 | 17 (74%) | $50.00 | $34.00 |
| Erosion control | 832E30000 | EACH | 16 | 16 (100%) | $1.00 | $1.00 |
| Treating of concrete bridge deck with SRS | 512E10400 | SY | 12 | 12 (100%) | $6.00 | $8.25 |
| Hand chipping | 848E50000 | SY | 12 | 10 (83%) | $125.00 | $105.00 |
| Patching concrete bridge deck - type C | 519E12304 | SY | 56 | 9 (16%) | $650.00 | $700.00 |
| Edge line, 6" | 646E10010 | MI | 11 | 9 (82%) | $6,900.00 | $10,000 |
| Removal of existing coatings from concrete surfaces | 512E74000 | SY | 11 | 9 (82%) | $20.00 | $27.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 13 | 8 (62%) | $75.00 | $80.00 |
| Work zone marking sign | 614E12460 | EACH | 12 | 8 (67%) | $82.50 | $92.00 |
| Work zone edge line, class III, 6", 642 paint | 614E22360 | MI | 10 | 8 (80%) | $1,200.00 | $886.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| BCC Ohio Inc | 6 | 1 of 6 |
| Barbicas Construction Company Inc | 4 | 1 of 4 |
| Marucci & Gaffney Excavating Co | 3 | 0 of 3 |
| Ohio Concrete Maintenance LLC | 3 | 1 of 3 |
| Shook Company LLC | 2 | 0 of 2 |
| Becdir Construction Company | 2 | 0 of 2 |
| Jet Excavating Company | 1 | 0 of 1 |
| Ohio Concrete Paving LLC | 1 | 0 of 1 |
| Ram Construction Services of Michigan, Inc | 1 | 0 of 1 |
| Athos Contracting | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JUL 2026 | 264019 | District 4 | D04-BH FY2027 (East) (BRIDGE REPAIR) | 1 of 2 | $861,655 | Low, 107% under the second |
| 30 JUL 2026 | 268016 | District 4 | D04-BH FY2027 (West) (BRIDGE REPAIR) | 1 of 2 | $1,775,648 | Low, 14% under the second |
| 17 JUL 2025 | 250344 | District 4 | D04-BH FY2026 (BRIDGE REPAIR) | 1 of 4 | $1,174,503 | Low, 26% under the second |
| 26 JUN 2025 | 254020 | TRU | TRU-SR 46-08.01 (TWO LANE RESURFACING) | 1 of 2 | $1,426,135 | Low, 16% under the second |
| 19 DEC 2024 | 240549 | District 4 | D04-BH FY2025 (West) (BRIDGE REPAIR) | 2 of 3 | $2,415,611 | +14% |
| 22 AUG 2024 | 244019 | TRU | TRU-SR 534-00.75 (TWO LANE RESURFACING) | 1 of 2 | $1,362,864 | Low, 8.0% under the second |
| 21 MAR 2024 | 240171 | District 4 | D04-BH FY2024 (East) (BRIDGE REPAIR) | 1 of 2 | $2,139,207 | Low, 29% under the second |
| 08 FEB 2024 | 240083 | District 3 | D03-BH FY2024 (A) (BRIDGE REPAIR) | 3 of 3 | $676,041 | +16% |
| 25 JAN 2024 | 244003 | MAH | MAH-SR 165-21.76 (TWO LANE RESURFACING) | 2 of 2 | $1,440,000 | +2.0% |
| 12 OCT 2023 | 234023 | JEF | JEF-SR 7-22.93 (SLIDE REPAIR) | 3 of 3 | $767,411 | +26% |
| 23 FEB 2023 | 234006 | COS | COS-SR 60-07.62 (BRIDGE REPAIR) | 2 of 3 | $875,484 | +18% |
| 29 SEP 2022 | 220514 | District 4 | D04-BH FY2023 (BRIDGE REPAIR) | 1 of 5 | $955,375 | Low, 38% under the second |
| 26 AUG 2021 | 214015 | STA | STA-BH FY2022 (BRIDGE REPAIR) | 1 of 4 | $800,000 | Low, 2.0% under the second |
| 05 NOV 2020 | 200513 | District 4 | D04-BH FY2021 (West) (BRIDGE REPAIR) | 1 of 10 | $1,264,336 | Low, 5.0% under the second |
| 15 OCT 2020 | 204021 | POR | POR-/TRU-SR 305/SR 534-05.65/VAR (TWO LANE RESURFACING) | 1 of 2 | $1,105,384 | Low, 17% under the second |
| 27 FEB 2020 | 204006 | District 4 | D04-BH FY2020 (East) (BRIDGE REPAIR) | 1 of 4 | $756,936 | Low, 16% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.