| 1 | Removal misc.: barrier reflector (202E98100) | EACH | 532 | $7.50 | $10.00 |
| 2 | Special - as-built construction plans (690E91000) | LS | 1 | $2,000.00 | $5,000.00 |
| 3 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 |
| 4 | Rumble strips, shoulder (asphalt concrete), as per plan (618E40601) | MI | 0.18 | $200,000 | $170,000 |
| 5 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 38 | $11.05 | $12.50 |
| 6 | Barrier reflector, type 1 (one-way) (626E00102) | EACH | 306 | $11.05 | $12.25 |
| 7 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 60 | $11.26 | $12.25 |
| 8 | Barrier reflector, type 2 (one-way) (626E00110) | EACH | 260 | $11.26 | $12.25 |
| 9 | Ground mounted support, no. 2 post (630E02100) | FT | 867 | $17.33 | $19.00 |
| 10 | Sign, flat sheet (630E80100) | SF | 207 | $20.63 | $23.00 |
| 11 | Sign, flat sheet (630E80100) | SF | 57 | $22.87 | $25.00 |
| 12 | Removal of ground mounted sign and disposal (630E84900) | EACH | 80 | $17.14 | $20.00 |
| 13 | Removal of ground mounted post support and disposal (630E86002) | EACH | 55 | $22.85 | $25.00 |
| 14 | Edge line, 6" (646E10010) | MI | 3.89 | $27,155 | $30,000 |
| 15 | Lane line, 6" (646E10110) | MI | 2.28 | $11,475 | $12,750 |
| 16 | Center line (646E10200) | MI | 0.42 | $35,560 | $40,000 |
| 17 | Channelizing line, 12" (646E10310) | FT | 2,103 | $6.00 | $6.50 |
| 18 | Stop line (646E10400) | FT | 14 | $55.00 | $65.00 |
| 19 | Dotted line, 6" (646E20504) | FT | 525 | $5.50 | $6.00 |
| 20 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $125.00 | $120.00 |
| 21 | Detour signing (614E12420) | LS | 1 | $13,245 | $15,000 |
| 22 | Work zone marking sign (614E12460) | EACH | 20 | $100.67 | $110.00 |
| 23 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $200.00 | $500.00 |
| 24 | Portable changeable message sign, as per plan (614E18601) | SNMT | 42 | $1,071.90 | $1,200.00 |
| 25 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 2.28 | $8,775.00 | $9,900.00 |
| 26 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.51 | $12,275 | $13,500 |
| 27 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 3.67 | $11,195 | $12,300 |
| 28 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 2,010 | $0.75 | $1.00 |
| 29 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 2,101.65 | $0.85 | $1.00 |
| 30 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 525 | $0.70 | $0.90 |
| 31 | Work zone stop line, class III, 642 paint (614E26610) | FT | 14 | $5.00 | $6.00 |
| 32 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 1 | $1,023.57 | $1,150.00 |
| 33 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 886 | $12.00 | $11.00 |
| 34 | Removal of existing pavement marking (512E74500) | FT | 747 | $3.40 | $6.00 |
| 35 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,257 | $10.00 | $12.00 |
| 36 | Removal of existing pavement marking (512E74500) | FT | 1,638 | $3.40 | $6.00 |
| 37 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,062 | $10.00 | $12.00 |
| 38 | Removal of existing pavement marking (512E74500) | FT | 869 | $3.40 | $6.00 |
| 39 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,060 | $10.00 | $11.50 |
| 40 | Removal of existing pavement marking (512E74500) | FT | 1,391 | $3.40 | $6.00 |
| 41 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,015 | $10.00 | $11.50 |
| 42 | Removal of existing pavement marking (512E74500) | FT | 1,391 | $3.40 | $6.00 |
| 43 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 325 | $12.00 | $15.00 |
| 44 | Removal of existing pavement marking (512E74500) | FT | 244 | $5.00 | $6.00 |
| 45 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 325 | $12.00 | $15.00 |
| 46 | Removal of existing pavement marking (512E74500) | FT | 244 | $5.00 | $6.00 |
| 47 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,081 | $10.00 | $12.00 |
| 48 | Removal of existing pavement marking (512E74500) | FT | 729 | $5.00 | $6.00 |
| 49 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 869 | $12.00 | $12.00 |
| 50 | Removal of existing pavement marking (512E74500) | FT | 733 | $5.00 | $6.00 |
| 51 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 762 | $12.00 | $12.00 |
| 52 | Removal of existing pavement marking (512E74500) | FT | 735 | $5.00 | $6.00 |
| 53 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,590 | $10.00 | $12.00 |
| 54 | Removal of existing pavement marking (512E74500) | FT | 1,101 | $5.00 | $6.00 |
| 55 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 4 | $55.00 | $75.00 |
| 56 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,591 | $10.00 | $12.00 |
| 57 | Removal of existing pavement marking (512E74500) | FT | 1,101 | $5.00 | $6.00 |
| 58 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 775 | $12.00 | $12.00 |
| 59 | Removal of existing pavement marking (512E74500) | FT | 403 | $5.00 | $6.00 |
| 60 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 775 | $12.00 | $12.00 |
| 61 | Removal of existing pavement marking (512E74500) | FT | 403 | $5.00 | $6.00 |
| 62 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 877 | $12.00 | $12.00 |
| 63 | Removal of existing pavement marking (512E74500) | FT | 550 | $5.00 | $6.00 |
| 64 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $55.00 | $150.00 |
| 65 | Refurbish bearing device, as per plan (516E45305) | EACH | 1 | $5,000.00 | $5,100.00 |
| 66 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $12,000 | $13,500 |
| 67 | Special - structures: concrete spall removal with (530E00800) | SY | 75 | $300.00 | $100.00 |
| 68 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $55.00 | $150.00 |
| 69 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 3 | $50.00 | $50.00 |
| 70 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 2 | $1,200.00 | $1,500.00 |
| 71 | Special - structures: concrete spall removal with (530E00800) | SY | 25 | $500.00 | $125.00 |
| 72 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $10.00 | $7.00 |
| 73 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $100.00 | $150.00 |
| 74 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 100 | $25.00 | $15.00 |
| 75 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 30 | $1,200.00 | $500.00 |
| 76 | Patching concrete structure, as per plan (519E11101) | SF | 25 | $200.00 | $180.00 |
| 77 | Patching concrete structures with trowelable mortar (843E50000) | SF | 10 | $250.00 | $180.00 |
| 78 | Micro silica modified concrete overlay using hydrodemolition, as per plan (848E10001) | SY | 1,546 | $62.00 | $83.00 |
| 79 | Surface preparation using hydrodemolition, as per plan (848E20001) | SY | 1,546 | $91.00 | $56.00 |
| 80 | Micro silica modified concrete overlay (variable thickness), material only, as per plan (848E30001) | CY | 39 | $500.00 | $400.00 |
| 81 | Hand chipping (848E50000) | SY | 47 | $200.00 | $140.00 |
| 82 | Test slab (848E50100) | LS | 1 | $1,000.00 | $500.00 |
| 83 | Full depth repair, as per plan (848E50201) | CY | 1 | $1,000.00 | $500.00 |
| 84 | Existing concrete overlay removed, as per plan (848E50321) | SY | 1,546 | $22.50 | $17.00 |
| 85 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 464 | $25.00 | $90.00 |
| 86 | Treating of concrete bridge deck with SRS (512E10400) | SY | 3,243 | $6.00 | $10.50 |
| 87 | Treating of concrete bridge deck with SRS (512E10400) | SY | 3,028 | $6.00 | $10.50 |
| 88 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,328 | $6.00 | $10.50 |
| 89 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,733 | $6.00 | $10.50 |
| 90 | Treating of concrete bridge deck with SRS (512E10400) | SY | 4,885 | $6.00 | $10.50 |
| 91 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 693 | $12.00 | $12.00 |
| 92 | Removal of existing pavement marking (512E74500) | FT | 463 | $5.00 | $6.00 |
| 93 | Treating of concrete bridge deck with SRS (512E10400) | SY | 549 | $6.00 | $11.00 |
| 94 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,113 | $6.00 | $10.50 |
| 95 | Treating of concrete bridge deck with SRS (512E10400) | SY | 3,113 | $9.00 | $10.50 |
| 96 | Treating of concrete bridge deck with SRS (512E10400) | SY | 6,603 | $6.00 | $9.50 |
| 97 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,860 | $6.00 | $10.50 |
| 98 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $9,000.00 | $20,000 |
| 99 | Epoxy coated steel reinforcement (509E10000) | LB | 383 | $10.00 | $4.00 |
| 100 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $10.00 | $7.00 |
| 101 | Class QC2 concrete, superstructure (511E31610) | CY | 6 | $1,000.00 | $2,500.00 |
| 102 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 12 | $100.00 | $60.00 |
| 103 | Elastomeric compression seal, as per plan (516E10901) | FT | 42 | $140.00 | $125.00 |
| 104 | Refurbish bearing device, as per plan (516E45305) | EACH | 5 | $4,000.00 | $5,200.00 |
| 105 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $20,000 | $110,000 |
| 106 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 20 | $1,200.00 | $500.00 |
| 107 | Patching concrete structure, as per plan (519E11101) | SF | 100 | $200.00 | $155.00 |
| 108 | Special - structures: concrete spall removal with (530E00800) | SY | 350 | $150.00 | $110.00 |
| 109 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 196 | $30.00 | $45.00 |
| 110 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 662 | $12.00 | $12.00 |
| 111 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 196 | $20.00 | $35.00 |
| 112 | Removal of existing pavement marking (512E74500) | FT | 459 | $5.00 | $10.00 |
| 113 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,338 | $10.00 | $13.00 |
| 114 | Removal of existing pavement marking (512E74500) | FT | 801 | $5.00 | $7.00 |
| 115 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,317 | $10.00 | $12.00 |
| 116 | Removal of existing pavement marking (512E74500) | FT | 808 | $5.00 | $6.00 |
| 117 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $10.00 | $7.00 |
| 118 | Concrete, misc.: backwall repair (511E71100) | CY | 8 | $1,500.00 | $2,000.00 |
| 119 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 804 | $8.00 | $14.00 |
| 120 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 273 | $30.00 | $45.00 |
| 121 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,115 | $10.00 | $11.00 |
| 122 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,077 | $12.00 | $35.00 |
| 123 | Removal of existing pavement marking (512E74500) | FT | 359 | $5.00 | $6.00 |
| 124 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $10,000 | $10,000 |
| 125 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $24,000 |
| 126 | Maintaining traffic (614E11000) | LS | 1 | $200,000 | $110,000 |
| 128 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $5,000.00 |
| 129 | Mobilization (624E10000) | LS | 1 | $10,000 | $55,000 |